East Central Railway - Bihar

8868472 1. elimination of level crossing by providing limited height subway on: {1} lc no.33 at km.264/3 4 between narkatiaganj bhiaroganj, {2} lc no.37 at km.269/6 7 between harinagar bhiaroganj and lc no.47 & 48 at km. 284/4 5 & 285/9 10 between narkatiaganj paniyahwa in samastipur division. 2. left over work rebuilding of bridge no.213 at km.171/ 14 15 and br. no.274 at km.215/4 5 on muzaffarpur sagauli narkatiaganj section on pile foundation. 3. at chanpatia left over work for improvement of approach road, circulating area, station building, provision of 2 bays p.p. shelter with flooring below shed. 4. repairs/replacement/recoupment of damaged/stolen/ broken/corroded inspection ladders with provision of new inspection ladders etc. on the bridges of samastipur division. 5. repairing of bridges by replacement of corroded/wornout/ pitted performated/weak members of the girder including provision of additional x frame of 12.20m & 18.30m welded type of plate girder in br.no.9, 44, 49, 55, 63 & 67 in muzaffarpur sitamarhi section, br.no.7, 16, 16a & 30 in samastipur jainagar section and br. no.18 in darbhanga sitamarhi section of samastipur division. 6. elimination of deficiencies in mea (minimum essential aminities) at different stations in the section of sr.den/iii/samastipur. 7. repairs to cess work between bugha paniyahwa under jurisdiction of sr.den/ii/samastipur. 8. left over work: samastipur division counseling of road users at 39 nos. unmanned level crossing gate by deploying gate counselors ¼xsv fe=½. 9. samastipur division sagauli raxaul ctr(s) at raxaul yard=0.930 km. 10. supply, installation and commissioning of 04 nos. chemical pump for chlorination of water under sse/ works/darbhanga (for darbhanga & sitamarhi stations)....