National Thermal Power Corporation Limited - Bihar

45589069 procurement of butterfly damper assy and spares for dust extraction procurement of butterfly damper assy and spares for dust extractionsystem crusher house stage 1 barh , complete damper assembly, liner actuator, shaft, flap, seal ring, lever , etc...

Eastern Railways - Bihar

45555764 supply of pneumatic tyre & tubepneumatic tyre & tube,pneumatic tyre & tube with flap, size : 7.50x20 14pr for tractor trailers wheels, make cea t, mrf, apollo, jk, bridgestone or similar of oem quality. [ warranty period: 30 months after the date of d elivery ] ]...

Patna Dairy - Bihar

45322123 tender for purchasing of the following items welding rod ms 6013, 3,15 x 450 we[dine rod ss 308 l 3.15 x 350 cutting wheel 4 inch (100x1x16) grinding wheel 4 inch ( 100xax16) buffing wheel 4 inch (10x4x16) buffing wheel (flap disc) 80 number polish wheel4 inch welding glass blacl< welding gloves...

Eastern Railways - Bihar

44887067 supply of tyre, tube and flaptyre, tube and flap,tyre, tube and flap of tractor trailer. size 10.00 20, season year round , rim size 20 inch, sectio n width 260 inch , brand mrf,tvs or similar. [ warranty period: 30 months after the date of delivery ] ] dy.cme(prod.)/jmp bihar 2.00 set => limited...

East Central Railway - Bihar

44734383 supply of analog insulation tester (megger) hand.analog insulation tester (megger) hand.,analog insulation tester (megger) hand driven generator, 500 volts, 0 100 mega ohms resistanc e. confirmed to is:2992 1987, rotation speed:160 rpm, housed in antimagnetic metal body with collapsible hand le metallic flap over the glass window scale, wide and anti parallax mirror scale. the megger should be supplied along with carrying bag and test leads. warranty and calibration certificate to be submitted with megger by suppli er when delivered. make: shanti/cie/ nippen/ motwane/ kusam meco/yokins/rishabh/waco or similar. [ warra nty period: 30 months after the date of delivery ] ]...

Rail Wheel Plant - Bihar

44638043 supply of 100% flame retardant cotton flame retardant treatment.100% flame retardant cotton flame retardant treatment.,fire retardant 100 % cotton work wear with following specification, material: 100% flame retardant cotton flame retardant treatment, style: jacket and pant (with reflective tape), weight: range of 300 to 450 gs m, colour: blue, closure: a heavy duty brass zipper extending form bottom to top of collar, button: metal, adju stment l button, stitching: lock stitched with f.r thread, design: (i) jacket (full sleeve, turn down collar, two chest pockets (left side & right side), pocket has protective flap with and covered metal button, front closing wit h flap type heavy duty metal zipper, quick release press buttons to be provided. (ii). trousers (the trouser shou ld be provided with two side pockets, metal zipper) standard tested according to en iso 11612: 2008 class a1 p lus a2,b1, c1, e3 f1. make: pt & i or equivalent. note firm should supply advance sample for feel and appear ance before bulk supply to consignee. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/ ): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]...

Eastern Railways - Bihar

44629225 supply of pneumatic tyre & tubepneumatic tyre & tube,pneumatic tyre & tube with flap, size : 7.50x20 14pr for tractor trailers wheels, make ceat, mrf, apollo, jk, bridgestone or similar of oem quality. [ warranty period: 30 months after the date of delivery ] ]...

Eastern Railways - Bihar

44465500 supply of flap door complete arrangement etcflap door complete arrangement etc,flap door arrangement in assembled condition for bcna / bcnahs wagon as per rdsos drg. no . wd 90030 s 66, alt . 10, item no. 3,13,14,15 & 16 ( in assembled conditio n ). [ warranty period: 30 months after the date of delivery ] ] dy.cmm/jamalpur, er bihar 199.00 set...

Eastern Railways - Bihar

44272747 supply of flap door complete arrangementflap door complete arrangement,flap door complete arrangement in assembled condition for bcna/bcnah s wagon as per rdso drg. no. wd 90030 s 66, alt. 10, item no. 3,13,14,15 & 16.material and specification as per drawing. as per drg.no. wd 90030 s 66,item 3,13,14,15 & 16,alt 10 specn: wd 90030 s 66,item 3,13,14,15 & 16,alt 10. [ warranty period: 30 months after the date of delivery ]...

East Central Railway - Bihar

43999693 supply of analog insulation tester (megger) hand.analog insulation tester (megger) hand.,analog insulation tester (megger) hand driven generator, 500 volts, 0 100 mega ohms resistanc e. confirmed to is:2992 1987, rotation speed:160 rpm, housed in antimagnetic metal body with collapsible hand le metallic flap over the glass window scale, wide and anti parallax mirror scale. the megger should be supplied along with carrying bag and test leads. warranty and calibration certificate to be submitted with megger by suppli er when delivered. make: shanti/cie/ nippen/ motwane/ kusam meco/yokins/rishabh/waco or similar. [ warra nty period: 30 months after the date of delivery ]...

East Central Railway - Bihar

43864884 supply of supply of metal cage pallet / stackablesupply of metal cage pallet / stackable,supply of metal cage pallet / stackable mild steel metal bin with flap type door as per drawing n o.j& t / 4722. [ warranty period: 30 months after the date of delivery ] => limited...

East Central Railway - Bihar

43864762 supply of metal cage pallet / stackable mild steelmetal cage pallet / stackable mild steel,metal cage pallet / stackable mild steel metal bin with flap type door. size 1000 l x 1000 w x 8 00 mm h (including ground clearance 150 mm) as per attached image & drawing no. dp 89/cds/src/ser/c p/002 (pallet should be galvanized with 610 g/m square as per is: 4759/1996, after fabrication). [ warranty peri od: 30 months after the date of delivery ] => limited...

Eastern Railways - Bihar

43819877 supply of flap door chainless cotter etcflap door chainless cotter etc,flap door chainless cotter for boxn/boxnhl wagon to rdsos drg.no.wd 23018 s 02, it em no.9, alt. no.1 [ warranty period: 30 months after the date of delivery ]...

Eastern Railways - Bihar

43791969 supply of flap door complete etc.flap door complete etc.,flap door arrangement in assembled condition for bcna / bcnahs wagon as per rdsos drg. no . wd 90030 s 66, alt . 10, item no. 3,13,14,15 & 16 ( in assembled conditio n ) . [ warranty period: 30 months after the date of delivery ] dy.cmm/jamalpur, er bihar 60.00 set...

Rail Wheel Plant - Bihar

43670986 supply of fire retardant 100 % cotton work wear.fire retardant 100 % cotton work wear.,fire retardant 100 % cotton work wear with following specification, material: 100% flame retardant cotton flame retardant treatment, style: jacket and pant (with reflective tape), weight: range of 300 to 450 gs m, colour: blue, closure: a heavy duty brass zipper extending form bottom to top of collar, button: metal, adju stment l button, stitching: lock stitched with f.r thread, design: (i) jacket (full sleeve, turn down collar, two chest pockets (left side & right side), pocket has protective flap with and covered metal button, front closing wit h flap type heavy duty metal zipper, quick release press buttons to be provided. (ii). trousers (the trouser shoul d be provided with two side pockets, metal zipper) standard tested according to en iso 11612: 2008 class a1 pl us a2, b1, c1, e3 f1. make: pt& i or equivalent. note firm should supply advance sample for feel and appeara nce before bulk supply to consignee. [ warranty period: 30 months after the date of delivery ]...

Ministry Of Power - Bihar

43392346 bids are invited for 100238480 10 100238480 flyash intake valve assy flap type, 200nb total quantity : 72...

National Thermal Power Corporation Limited - Bihar

43351587 bids are invited for custom bid for services 200131813 biennial contract for mechanical maintenance of chp system equipment ntpc kanti, 10.10. ( fhcpl00bd800 ) coupling ( <> ) replacement coupling replacement. for measurement purpose any one of the following will be treated as one unit. replacement of fluid coupling ‘or’ conveyor drive brake drum ‘or’ gear box cooling fan or flexible coupling a ) shifting of new / repaired fluid coupling / brake drum / cooling fan / flexible coupling at site. b ) decoupling of fluid coupling / dismantling of thruster brakes ( if required ) and shifting of motor to the required place. c ) removal of fluid coupling / brake drum / cooling fan / flexible coupling from motor / gear box. d ) mounting of new / repaired fluid coupling / brake drum / cooling fan / flexible coupling, placement of motor and oil filling in coupling if required. e ) coupling of the drive and system normalization after the alignment. f ) trial run and defect rectification, if any fluid coupling dis mounted after dismantling then assembling of coupling after defective part replacement is in the scope of the contractor without any extra claim. g ) shifting of old fluid coupling / brake drum / cooling fan at chp workshop or as per direction of engr in charge. h ) if brake drum, cooling fan and flexible coupling replaced at a time, no extra payment will be made. it will also be applicable for removal & remounting of couplings. i ) cutting / welding required for the job comes under contractor’s scope. 10.20 ) . ( fhiid00bd800 ) impact idlers ( <> ) repl. idlers repl. / screw take up tightening and loosening / idler frame repl. / scrapper repl. / deck plate repl. replacement of rollers / idlers: [ for payment purpose replacement of total no. of rollers / idlers in one frame carrying / return will be treated as one unit. ] a ) replacement of any rollers / idlers in chp comes under this. b ) shifting of new / repaired rollers / idlers at site and fixing at required place. c ) shifting of old / damaged rollers / idlers to chp workshop / chp scrap yard. d ) if more than one rollers / idlers are replaced in same frame simultaneously, it will be treated as one unit. ‘or’ for measurement purpose any one of the following will be treated as one unit. screw take up loosening and tightening: a ) it includes all screw take ups in chp conveyors. b ) loosening of screw take up as per requirement and retightening it as per direction. or replacement of idler frame: a ) replacement of any idler frame in chp comes under this. b ) shifting of new / repaired idler frame at site and fixing at required place. c ) shifting of old / damaged idler frame to chp workshop / chp scrap yard. d ) if idlers are also replaced during frame replacement, no extra payment will be made. e ) cutting / welding required for the job comes under contractor’s scope. ‘or‘ scrapper replacement: a ) removal of worn out rubber, making new rubber from old conveyor belt / rubber sheet, as per requirement. b ) fixing of rubber in scraper and reinstallation on the conveyor. c ) cutting / welding required for the job comes under contractor’s scope. ‘or‘ replacement of deck plate ( 01. no ) : a ) removal of existing plate after removing the idlers & frames as required. b ) shifting of new deck plate ( including wooden one ) at site & fixing it. c ) normalization of the system. d ) cutting / welding required for the job comes under contractor’s scope. 10.30 ) . ( fhg / b58bd800 ) gear boxes ( hold back ) repl ( 6 hrs ) gear box hold back replacement / fluid coupling oil replacement / decoupling and coupling of gear coupling / thruster replacement / thruster overhauling gear box hold back replacement: a ) replacement of hold back of any conveyor gear box in chp comes under this. b ) shifting of new / repaired hold back from chp store / central store / central workshop to site. c ) removal of old hold back from gear box and fixing of new hold back. d ) trial run and defect rectification, if any. e ) shifting of old hold back to chp workshop. for payment purpose one g box hold back repl. will be treated as one unit. ‘or’ fluid coupling oil replacement: a ) oil replacement of any fluid coupling in chp comes under this. b ) removal of coupling guard, opening of fusible plug / filling plug and draining of oil in a can & shifting it to chp scrap yard. c ) shifting of oil at site & filling in the fluid coupling up to specified angle. d ) fitting the fusible plug / filling plug, fixing of coupling guard. for payment purpose two fluid coupling oil replacements will be treated as one unit. ‘or‘ decoupling and coupling of gear coupling ( after greasing ) : a ) this covers all gear couplings being used in chp. for payment purpose decoupling and coupling of gear coupling of one gear coupling will be treated as one unit. ‘or thruster replacement: a ) replacement of any thruster ( except stacker rail clamp ) in chp comes under this. b ) shifting of new / repaired thruster at site. c ) removal old thruster and fixing of new one, stroke adjustment as per requirement. d ) shifting of old thruster to chp workshop. e ) trial run and defect rectification if any for payment purpose one thruster repl. will be treated as one unit. ‘or’ thruster overhauling: a ) this covers for any thruster being used in chp b ) dismantling of thruster as per direction of area engr. c ) replacement of damaged part as per direction & reassembling. d ) oil filling and testing for smooth operation. for payment purpose one thruster overhauling will be treated as one unit. 10.40 ) . ( fhp / c12bd800 ) pulley / coupling ( nde brg ) repl servicing of fluid coupling / replacement of conveyor non drive end bearing / plumber block for measurement purpose any one of them will be treated as separate unit. servicing of fluid coupling: a ) this covers any fluid coupling being used in chp. b ) dismantling of fluid coupling as per direction. c ) replacement of defective parts of fluid coupling as per direction and re assembling. d ) testing of oil leakage by filling oil. defect rectification, if any. ‘or’ replacement of conveyor non drive end bearing / plumber block: a ) it includes any bearing / plumber block of any pulley including gtu / bend / snub / drive pulley of any conveyor in chp. b ) belt clamping, take up lifting & lowering will be in the scope of this contract. c ) shifting of new bearing / plumber block at site. d ) opening and removal of plumber block / bearing form the pulley. e ) mounting of new bearing on the pulley and fixing of plumber block and greasing bearings. f ) if required bearing of non drive pulley will also be replaced. g ) system normalization. trial run and defect rectification, if any. h ) if plumber block is replaced at the time of bearing replacement, no extra payment will be made. 10.50 ) . ( fhcht51bd800 ) chutes ( skirt rubber ) repl skirt rubber replacement / shifting of oil / lubricant drums skirt rubber replacement: a ) replacement of rubber of any skirt comes under this, if skirt is damaged. b ) opening of skirt rubber clamp and removing of worn out rubber. c ) making the new skirt rubber, from old conveyor belt / skirt rubber sheet, as per requirement. d ) fixing of new rubber in frame & mounting it on the skirt and trial run for leakage arresting. e ) for measurement purpose, for measurement purpose one metre or part will be taken as one unit. ‘or’ shifting of oil / lubricant drums from central stores or any other place inside plant to chp store and vice versa: a ) it includes shifting of filled oil / grease drums from central stores or any other place inside plant to chp store and vice versa. b ) shifting of one drum will be taken as one unit. c ) transportation arrangement is to be arranged by the contractor. 10.60 ) . fhp / c52bd800: conv pulleys ( <> ) ( non drive ) repl conv pulleys ( non drive ) repl / replacement of take up pulley / replacement of conveyor pulley bearing / plumber block ( drive end ) / gear coupling replacement ( one pair ) a ) replacement of all non drive pulley including snub pulley, bend pulley, tail pulley and tail snub pulley comes under this. b ) shifting of new / repaired pulley from chp store / central store / central workshop to site. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) removal old pulley, bearings and plumber block from the old pulley. e ) mounting of bearings and plumber blocks, on the new pulley. f ) placement of new pulley on position and alignment with the system. g ) system normalization trial run and defect rectification, if any. h ) shifting of old pulley to chp workshop / central workshop. ‘or’ replacement of take up pulley: a ) replacement of take up pulley of any conveyor comes under this. b ) shifting of new repaired pulley at site. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) cutting the conveyor belt at the required place if required and removal of old pulley from foundation. e ) removal of bearings / plumber blocks of pulley. f ) mounting of bearings and plumber blocks on the new pulley. g ) lifting of new pulley and mounting it on the foundation. h ) pulling of conveyor belt and belt joint will not be in the scope of this contract. i ) system normalization, trial run & defect rectification, if any. j ) shifting of old / damaged pulley to chp / central workshop. ‘or’ replacement of conveyor pulley bearing / plumber block ( drive end ) : a ) decoupling of gear box and shifting it to the required place. b ) removal of low speed side coupling half. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) drive pulley lifting and removal of plumber block / bearings. e ) shifting of new bearing / plumber block and mounting it on the pulley. greasing of bearing. f ) system normalization, placement of gear box and alignment. g ) trial run and defect rectification, if any. h ) if plumber block is replaced at the time of bearing replacement, no extra payment will be made. ‘or’ gear coupling replacement ( one pair ) : a ) replacement of any gear coupling of any conveyor belt comes under this. b ) shifting of new / repaired gear coupling at site. c ) removal of coupling guards, decoupling of gear box from both high speed side and slow speed side. shifting of motor and gear box at required place and removal of gear coupling after dismantling of thruster brake, if required. d ) mounting of new gear coupling, placement of gear box at foundation. e ) normalization of system after alignment, for alignment. f ) trial run and defect rectification, if any. g ) shifting of old gear coupling to chp workshop. h ) cutting / welding required for the job comes under contractor’s scope. 10.70 ) . ( fhcnp00bd800 ) conv pulleys ( <> ) repl replacement of drive pulley: a ) replacement of drive pulley of any conveyor in chp ( except coal / sampler ) comes under this. b ) shifting of new / repaired pulley from central store / chp store / central workshop to site. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) decoupling the gear coupling and removal of drive pulley after opening and removal of discharge hood. e ) removal of gear coupling, bearing & plumber blocks. f ) mounting of gear coupling, bearings and plumber blocks on the new pulley. g ) placement of new pulley on position & alignment of the pulley with gear box to the satisfaction of engr. in charge. h ) system normalization trial run & defect rectification, if any. i ) shifting of old pulley to chp workshop / central workshop 10.80 ) . ( fhpcc53bd800 ) crushers ( hammers ) repl replacement of full set hammers replacement of full hammers: a ) weighing of new hammers, weight balancing and shifting them to the site after internal inspection of crusher. b ) removal of hammers from the crusher and replacement of new hammers as per direction of area engineer or his representative. c ) shifting of old hammers to chp scrap yard. d ) any cutting / welding required will be in scope of contractor. 10.90. ( fhscc11bd001 ) cr hammer attend breakdown repl. of hammers in two opposite rows for measurement purpose any one of the following will be treated as separate unit. repl. of hammers in two opposite rows: a ) weighing of new hammers, weight balancing and shifting them to the site after internal inspection of crusher. b ) removal of broken / worn out hammers from the crusher and replacement of new hammers as per direction of area engineer or his representative. c ) shifting of old hammers to chp scrap yard. d ) any cutting / welding required will be in scope of contractor. 10.100 ( fhgzf17bd800 ) grizzly feeders ( shaft assly. ) repl replacement of g.f. shaft / replacement of crusher kick off plate replacement of g.f. shaft ( one no. of shaft ) : a ) removal of guards, universal coupling / cardoon shaft & counter weight. b ) removal of bearings and bearing housings at d.e. & nde c ) shifting of new g.f. shaft to site. d ) removal of old shaft and fixing of new shaft. e ) mounting of bearing housings on the new shaft / replacement of bearing housing if required. f ) remounting of counter weight, universal coupling and their guards. g ) greasing, trial run and defect rectification, if any. h ) shifting of old / damaged g.f. shaft to chp workshop / chp scrap yard. ‘or’ replacement of crusher kick off plate: a ) shifting of kick off plate at site from central store / site store. b ) removal of crusher top cover / side liners if required. c ) opening of kick off plate bolts and removal of frame fill piece. d ) fixing of new frame fill piece, tightening of bolts up to required torque / welding if required. e ) normalization of system. trial run and defect rectification. f ) shifting of old frame fill piece to chp scrap yard or as per direction. 10.110. ( fhvbf00bd000 ) vibro feeders ( <> ) attend defect vibro feeders attend defect / tightening of breaker plate bolt for measurement purpose any one of the following will be treated as separate unit. ( 1 ) . remove the worn out / broken tray from the position. ( 2 ) . replace the same with the new tray / repaired tray with new / same tie rod / tie rope assembly and do proper alignment. ( 3 ) any other minor work like patch work in chute and adjustment in hopper / chute to maintain the freeness of tray with chute etc as per direction of eic. 4 ) take trial after adjusting the tray. 5 ) declination angle adjustment of the as per the direction of eic. 6 ) unbalanced weight adjustment work as per the direction of eic. 7 ) replacement of vibro feeder pedestal spring ‘or’ tightening of breaker plate bolt after welding of head: a ) welding of head of one breaker plate bolt as per requirement. b ) tightness checking of bolt and locking of nuts. c ) any cutting / welding required will be in the scope of the contractor. d ) for measurement purpose tightening of bolt of one breaker plate will be treated as one unit. e ) for welding of heads of breaker plate bolts, e7018 1 electrodes will be supplied by kbunl free of cost. 10.120. ( fhscc17bd800 ) crushers ( rotor assly ) repl crushers ( rotor assly ) repl for measurement purpose any one of the following will be treated as separate unit. replacement of crusher rotor: a ) shifting of new rotor from central store / any other store to crusher floor b ) decoupling of slow speed coupling and removal of pin bush. c ) removal of crusher cover, front side housing, tramp iron tray, plumber block bolts, side liners, hood, chute etc. d ) removal of all hammers and suspension bars. e ) lifting up the rotor and placement at a safe place. f ) removal of coupling half and bearings from rotor. g ) lower the new rotor into position after mounting of bearings, plumber blocks and coupling half. box up in reverse order. h ) check and correct misalignment of slow speed side. i ) balancing of hammers & mounting ( replace full set of hammers if required ) , system normalization, trial run and defect rectification, if any. j ) shifting of old rotor to chp scrap yard. k ) replacement of defective side liners, repairing of ‘v’ shaped deflector plate and other plates if required, also to be done without any extra financial implication. l ) any cutting / welding required for this job will be in the scope of contractor. m ) for welding of heads of liner bolts, breaker plate bolts, screen plate bolts e7018 1 electrodes will be supplied by kbunl free of cost. ‘or’ replacement of g.f. deck side walls ( 01 set =02nos ) : a ) shifting of 02 no. deck side walls from kbunl stores to site. b ) dismantling of bearing housings, bypass chute, side skirt, shaft tubes, spring units, removal of damaged deck side walls after proper supporting of skirts & decks. c ) fixing of new deck side walls & re installation of all dismantled parts. d ) removal of all supports. system normalization, trial run & defect rectification, if any. e ) shifting of damaged deck side walls to chp scrap yard. f ) if only 01no ( one ) g f deck side wall is replaced, 50% payment will be made. b ) cutting / welding required for the job comes under contractor’s scope. 10.130. ( fhpcc52bd800 ) crushers ( screen plate ) repl crushers ( screen plate ) repl / breaker plate / kick off plate / replacement of crusher d.e. bearing / plumber block for measurement purpose any one of the following will be treated as separate unit. replacement of crusher screen plate / breaker plate / kick off plate : a ) shifting of screen plate / breaker plate / kick off plate at site from central store / site store. b ) removal of crusher top cover. c ) opening of screen plate / breaker plate / kick off plate bolts and removal of the same. d ) fixing of new screen plate / breaker plate / kick off plate , tightening of bolts up to required torque / welding if required. this includes fixing of site make screen plates also. e ) normalization of system. trial run and defect rectification. f ) shifting of old screen plate / breaker plate / kick off plate to scrap yard or as per direction. g ) if both upper & lower screen plates are replaced simultaneously, it will be treated as one unit. i ) all allied activity related with screen plate replacement, including cutting / welding or preparation of jig fixtures comes under contractor’s scope. ‘or’ replacement of crusher d.e. bearing / plumber block : a ) shifting of new bearing / plumber block at site. b ) decoupling of gear box from slow speed side and high speed side. c ) removal of flexible coupling half. e ) opening of shaft seal covers on both sides. f ) loosening of both side plumber block bolts and its top cover. g ) removal of top cover of crusher. h ) removal of side liners above the end discs on both sides. i ) lifting of rotor and removal of plumber block and bearing ( de ) . j ) mounting of new bearing correctly and adjusting the clearance to the specified value. k ) placement of plumber block and lowering of rotor. l ) boxing up in reverse order. m ) mounting of coupling, placement of g / b. alignment of rotor with gear box. n ) system normalization and trial run and defect rectification, if any. o ) shifting of old bearing / plumber block to chp scrap yard. p ) cutting / welding required for the job comes under contractor’s scope. q ) if bearing and plumber block are replaced simultaneously no extra payment shall be made, if will be treated as one unit. 10.140. ( fhttr00bd000 ) travelling tripper ( <> ) attend defect travelling tripper rail structure supporting beam bolts tightening / miscellaneous jobs related to travelling tripper for measurement purpose any one of the following will be treated as separate unit. travelling tripper rail structure supporting beam bolts tightening: a ) it includes tightening all bolts of travelling tripper rail supporting beam, structural member, coupling bolts of tripper. or miscellaneous jobs related to travelling tripper such as scrapper adjustment, skirt fixing, eh brakes inspection and adjustment etc. 10.150. ( fhttr22gn808 ) travelling tripper ( tripper wheel ) realignment re railment of trippers : a ) dismantling of tripper bracings / str., as required. b ) lifting of tripper by mechanical means and placing it on the tripper rails. c ) re assembling of all supporting str. as per direction and system normalization. d ) trial run and defect rectification, if any. e ) any cutting / welding required for this job will be in the contractor’s scope. 10.160. ( fhttr00oh001 ) travelling tripper ( <> ) oh overhauling of tripper hand brake / manual brake / ilms pulley bearing flange replacement / flap gate flange bearing replacement / crusher hammer pin replacement for measurement purpose any one of them will be treated as separate unit. overhauling of tripper hand brake / manual brake: a ) removal of damaged hand brake from position. b ) rectification / strengthening of fixing base plate / replacement of shoe etc. c ) refixing of hand brakes by welding / bolting. check for alignment / fouling with rails. e ) system trial run. defects rectification, if any, after trial run. ‘or’ ilms pulley bearing flange replacement ( nde ) a ) shifting of new bearing at site. b ) preparation of jig / fixtures for supporting the ilms. c ) removal of bearing / bearing flange. d ) system normalisation. trial run and defect rectification, if any. e ) if bearing flange is replaced while bearing replacement, it will be treated as one unit. f ) cutting / welding required for the job comes under contractor’s scope. ‘or’ flap gate flange bearing replacement: a ) removal of operating lever / counter weight lever. b ) shifting of new bearing at site. c ) removal of old bearing and mounting of new bearing and greasing. refitting of lever. d ) shifting of old bearing at chp scrap yard. e ) any cutting / welding work will be in the scope of the contractor. ‘or’ crusher hammer pin replacement : a ) opening of access door. opening of shaft seal / removal of pin retainer bolts. b ) shifting of new hammer pin at site, after weighing. c ) removal of damaged hammer pin and replacement with new one. replacement of the same on opposite side also. d ) crusher box up, trial run and defect rectification, if any. 10.170. ( fhttr00bd801 ) travelling tripper ( <> ) repair tripper rail joint welding. removal of old welding & welding as per requirement. welding electrode e7018 1 will be supplied by kbunl free of cost. for measurement purpose one centimeter will be treated one no. for payment purpose 01 cm will be treated as 01 no 10.180. ( fhilm56bd800 ) ilms / obms ( pulley brg ) repl ilms pulley bearing / bearing flange replacement ( de ) / flap gate actuator replacement / replacement of flap gate trunnion bracket for measurement purpose any one of them will be treated as separate unit. ilms pulley bearing / bearing flange replacement ( de ) : a ) shifting of new bearing at site. b ) preparation of jig / fixture for supporting the ilms. c ) removal of drive motor and gear box. removal of bearing / bearing flange. d ) fixing of new flanged bearing and mounting it on the pulley shaft. e ) assembling of the drive, alignment and system normalization. f ) trial run and defect rectification, if any. g ) if bearing flange is replaced while bearing replacement, it will be treated as one unit. h ) cutting / welding required for the job comes under contractor’s scope. ‘or’ flap gate actuator replacement: a ) shifting of new / repaired actuator at site. b ) removal of old actuator and fixing of new actuator. c ) shifting of old actuator to chp workshop. d ) operation checking of flap gate and defect rectification, if any. e ) overhauling of the replaced actuator. or replacement of flap gate trunnion bracket : a ) shifting of new / repaired trunnion bracket at site. b ) removal of old trunnion bracket and fixing of new trunnion bracket. c ) operation checking of flap gate and defect rectification if any d ) shifting of old trunnion bracket to chp workshop. 10.190. ( fhg / b54bd800 ) gear box ( gear replacement ) full set of gear box internals replacement: a ) it includes replacement of full set of internals of any gear box of any drive in c.h.p. b ) shifting of new / repaired gear box internal from chp store / central store / central workshop. c ) decoupling of gear box from h.s. & low speed side & shifting of motor and removal of fluid coupling, if required. d ) dismantling of gear box top cover, end covers etc and removal of its internals and removal of slow speed side coupling half. e ) mounting of coupling half / bearing on shaft and assembling of shafts in the gear box and checking for proper matching. f ) box up of gear box, placement on foundation & placement of motor, replacement of defective oil seals, if required and oil filling up to the mark. g ) system normalization after alignment. h ) if removal & mounting of fluid coupling / flexible coupling half is required, payment will be done as per sl. no. 01 i ) trial run and defect rectification, if any. j ) shifting of old gear box internals to chp workshop / central work / scrap yard. k ) any cutting / welding work will be in the scope of the contractor. 10.200. ( fhg / b51bd800 ) gear boxes ( i / p shaft ) repl replacement of gear box input shaft / shaft bearings / oil seals / complete gear box / replacement of output shaft for measurement purpose any one of them will be treated as separate unit. replacement of gear box input shaft / shaft bearings / oil seals / complete gear box: a ) replacement of input shaft / shaft bearing / oil seals of any gear box in chp comes under this. b ) shifting of shaft / shaft bearings / oil seals from central store / chp store / central store to site. c ) decoupling of input shaft from motor and shifting of motor to the required place. d ) removal of fluid coupling or brake drum / oil seals after dismantling of thruster brake, if required. e ) opening of gear box top cover etc and removal of the input shaft, oil seals, removal of bearings etc from the shaft. f ) mounting of bearings and hub on the input shaft, replacement of oil seals if required. g ) fixing of input shaft and also to be checked for proper matching with intermediate shaft. h ) box up of gear box in reverse order. i ) mounting of fluid coupling, & motor placement. j ) alignment k ) system normalization, trial run and defect rectification, if any. l ) cutting / welding required for the job comes under contractor’s scope. m ) shifting of old damaged shaft to chp scrap yard / central workshop. n ) if shaft, oil seals and bearings are replaced simultaneously, it will be counted as one unit only. or replacement of output shaft / shaft bearing / oil seals: a ) replacement of output shaft / shaft bearings / oil seals of any drive in c.h.p. comes under this. b ) shifting of new / repaired shaft / shaft bearings / oil seals at site and removal of coupling half c ) decoupling of gear box on slow speed side, removal of gear box top cover & end cover. d ) removal of output shaft / bearings / oil seals etc. e ) internal inspection & mounting of bearings and coupling half on the output shaft. f ) placement of the output shaft. g.box box up, and system normalization. replacement of defective oil seals, if required. g ) trial run and defect rectification, if any. h ) cutting / welding required for the job comes under contractor’s scope. i ) shifting of old damaged shaft / bearings to central workshop. / chp scrap yard j ) if shaft , oil seals and bearings are replaced simultaneously , it will be counted as one unit only. 10.210. ( fhg / b12bd800 ) gear boxes ( 10 50ltrs ) repl replacement of gear box oil : ( oil qty. < 50 ltrs. ) any of the following work is covered under this item. for measurement purpose any one of them will be treated as separate unit. replacement of gear box oil : ( oil qty. < 50 ltrs. ) a ) replacement of oil of any gear box comes under this having oil capacity more than 10 ltrs.. b ) shifting of oil / oil drums from chp store to the site. c ) draining of oil in a can and shifting it to chp scrap yard. d ) filling of oil in the gear box after flushing. normalisation of the system. or de coupling, coupling and alignment of ilms motor. 10.220. ( fhg / b13bd800 ) gear boxes ( 50 100 ltrs ) repl replacement of gear box oil : ( oil qty.> 50 ltrs. ) / replacement of cable reeling drum gear box for measurement purpose any one of them will be treated as separate unit. replacement of gear box oil : ( oil qty.> 50 ltrs. ) a ) replacement of oil of any gear box comes under this . b ) shifting of oil / oil drums from chp store to the site. c ) draining of oil in a can and shifting it to chp scrap yard. d ) filling of oil in the gear box after flushing. e ) normalisation of the system. ‘or’ replacement of cable reeling drum gear box : a ) replacement of crd gear box of travelling tripper comes under this .shifting of new / repaired gear box at site. b ) removal of motor after decoupling of coupling. removal of crd drum if required. c ) removal of gear box and removal of coupling half. d ) mounting of coupling half in new gear box. e ) placement of new gear box in position re assembling of motor. f ) trial run and defect rectification. 10.230. ( fhg / b00gn152 ) gear boxes ( <> ) decpl / cpl / algn alignment of lt drive ( for motor 15 kw to 200kw ) / overhauling of gear box ( below 30 kw ) / ilms gear box replacement for measurement purpose any one of them will be treated as separate unit. alignment of lt drive ( for motor 15 kw to 200kw ) : a ) if coupling pin bush replacement is required, no extra payment will be done. b ) it includes all related activity for the alignment. c ) for payment purpose, if both slow speed ( with dial gauge ) and high speed alignment is done, it will be treated as separate unit. d ) cutting / welding required for the job comes under contractor’s scope. ‘or’ overhauling of gear box ( below 30 kw ) : a ) opening of gear box. replacement of defective / worn out / damaged parts. b ) re assembling of gear box and oil filling. ‘or’ ilms gear box replacement: a ) shifting of new / repaired gear box at site. b ) decoupling and removal of motor. decoupling and removal of gear box. c ) mounting of new gear box, re assembling of motor and alignment. d ) coupling of motor, trial run and defect rectification, if any. e ) shifting of old gear box at chp / central workshop. 10.240. ( fhttr14bd800 ) travelling tripper ( lt gearbox ) repl replacement of travelling tripper travel drive gear box / alignment of ht drive ( for motor above 200 kw ) for measurement purpose any one of them will be treated as separate unit. replacement of travelling tripper travel drive gear box : a ) shifting of new / repaired gear box at site. b ) dismantling of old gear box / motor and fixing of new gear box & motor. c ) dismantling of thruster brake & refixing. d ) alignment of the drive and oil top up in new gear box after flushing. e ) normalization of the system and trial run to be taken. defect rectification, if any. f ) shifting of all materials to chp store / chp scrap yard. g ) cutting / welding required for the job comes under contractor’s scope. ‘or’ alignment of ht drive ( for motor above 200 kw ) : a ) if coupling pin bush replacement is required, no extra payment will be done. b ) it includes all related activity for the alignment ( slow speed or high speed ) . c ) for payment purpose, if both slow speed ( with dial gauge ) and high speed alignment is done, it will be treated as separate unit. d ) cutting / welding required for the job comes under contractor’s scope. 10.250. ( fhg / b00bd000 ) gear boxes ( <> ) attend defect gear box gauge glass replacement / replacement of sump pump spider of love joy coupling for measurement purpose any one of the following will be treated as separate unit. a ) gear box gauge glass replacement: b ) shifting of new / repaired gauge glass at site. c ) removal of old gauge glass after isolation and mounting of new one. d ) oil leakage job of gear box ‘ or ‘ replacement of sump pump spider of love joy coupling : a ) no payment will be made for spider of love joy coupling replacement if it is done while pump overhauling. 10.260. ( fhmat14gn863 ) matl ( misc ) shifting transportation of materials: a ) it includes transportation of any kind of material from central store or any other place inside plant to chp store or vice versa, as per direction. b ) for measurement purpose materials upto 50kg or part there off will be taken as one unit. 10.270. chp em bkdn mtc st 1 ( fhmat11gn162 ) matl ( scrap ) disposal transportation of misc. scrap: a ) it covers transportation of misc. scrap from chp area to other place inside the plant as per direction. b ) for measurement purpose transportation of one ton scrap will be taken as one unit. all arrangement for loading, unloading and transportation including supply of tractor is in contractor’s scope. 10.280. ( fhmsw00gn250 ) fabrication erection ( <> ) lighter section miscellaneous steel fabrication work in c.h.p. ( lighter section ) : a ) fabrication of ladder , platform and other miscellaneous work in chp and mgr area ( from wagon tippler to bunker floor and mgr gates ) at different elevations and different location comes under this . b ) transportation of steel from kbunl stores to work site . c ) fabrication work is to be done as per given drawing or as per direction of area engineer and placement of the same at the required place or as per direction. d ) new fabricated work is to be painted with one coat of primer paint of kbunl approved brand. paint to be provided by the contractor. e ) payment will be done on per ton basis. f ) it will be applicable for steel sheets upto 3.15mm. g ) removal of old plate / structure from location and shifting to chp scrap yard will be in the scope of the contractor. 10.290. ( fhcht00bd801 ) chutes ( <> ) repair coal leakage arresting by patch work : a ) arresting of coal dust leakage from any chute / duct in chp comes under this. b ) leakage arresting includes fabrication of required patch from ms plate ( up to 20mm thick ) and welding of the same at required place or as per direction of area engineer. c ) trial run for leakage arresting if any. d ) for measurement purpose payment will be made on per unit basis and 300 mm*300 mm will be treated as one number. 10.300. ( fhcht00gn250 ) ( fabrication +erection ) miscellaneous steel fabrication work in c.h.p. ( heavy section ) .: a ) fabrication of ladder, platform and other miscellaneous work in chp and mgr area ( from track hopper to bunker floor and mgr gates ) at different elevations and different location comes under this . b ) transportation of steel from kbunl stores to work site . c ) fabrication work is to be done as per given drawing or as per direction of area engineer and placement of the same at the required place or as per direction. d ) new fabricated work is to be painted with one coat of primer paint of kbunl approved brand. paint to be provided by the contractor. e ) payment will be done on per ton basis. f ) removal of old plate / structure from location and shifting to chp scrap yard will be in the scope of contractor. 10.310. ( fhdep00gn602 ) deptt <> man.dep sw manpower supply sw manpower supply for other miscellaneous work ( as per direction of engr in charge ) . necessary t&ps required for supply job will be provided by contractor ( as per t&ps list ) . sw ( fitter / rigger / welder ) 10.320. ( fhdep00gn600 ) deptt <> man.dep usw manpower supply usw manpower supply for other miscellaneous work ( as per direction of engr in charge ) . necessary t&ps required for supply job will be provided by contractor ( as per t&ps list ) usw ( helper ) 10.330. ( fhscc13gn250 ) crushers ( bkr plate ) fabrication crushers ( bkr plate ) fabrication / deck plate fabrication of vs assembly making breaker plate for crusher ( one full set consisting of four piece small / 02pc big size ) a ) marking of breaker plate as per drawing and instruction of area engineer. b ) cutting of breaker plate. c ) transportation of breaker plates from chp steel yard to central workshop for drilling. d ) transportation of breaker plates from central workshop to chp crusher house / store area after drilling. drilling of holes will not be in the scope of the agency. payment will be made as ( 04 nos = 01 unit ) or a ) fabrication of deck plates of vibrating screen 10.340. conv pulleys ( <> ) brg inspection: fhcnp00bd799 conv. pulley ( <> ) brg inspection bearing inspection for conveyor pulley / crusher / bearings of wheels of mobile equipment’s stacker , travelling tripper bearing inspection a ) inspection of bearings ( both end ) of any conveyor pulley in chp. b ) supply of all t&ps and manpower will be in the scope of the agency. c ) all related jobs for bearing inspection will be in the scope of the agency. d ) greasing of bearings after inspection to be done by the agency. 10.350. ( fhbcn02pm002 ) belt conveyor 02 w checks belt conveyor 02 w checks 1. any conveyor in chp is covered under this item. 2. check all idlers for free rotation. 3. replace defective idlers / idlers frame / guide rollers, 4. adjust / replace the skirt rubber, scrapper rubber & dust curtains. 5. check the belts for any sway, train as required. 6. check the thruster oil level, top up if required .adjust the thruster brake. 7. check the gear box & fluid coupling oil level / leakage, top up if required. clean the gear box breather. 8. check the belt joints for any ply separation, check the belt for any damage, cut mark etc.& report. 9. check pulley bearing for overheating, noise etc. check the temp. of gear box. check oil pressure if gauge is provided. 10. check that take up travel is free; there is no deformation in its guide. 11. tighten all foundation bolts of motor, gear box, pulley, plumber block etc. 12. any cutting / welding / tacking of idler with frame is in the scope of contractor. 10.360. ( fhbcn02pm004 ) belt conveyor 04 w checks belt conveyor 04 w checks 1. any conveyor in chp is covered under this item. 2. repeat items 2, 3, 4, 5, 6, 7, 8, 11&12 of job sl.no. – 35 3. check tightness of fan bolts & foundation bolts of drive & pulley. 4. check for any leakage from the seals of gear box fluid coupling and report. 5. check the play in pin & bush coupling and report if bushes are damaged. 6. inspect pulley lagging for wear / damage & report. 7. check the pulley for any crack; tighten the locking assembly bolts by torque wrench unto adequate torque. 8. check that there is no deformation in take up guide. 10.370. ( fhbcn02pm012 ) : belt conveyor 12 w checks belt conveyor 12 w checks 1. any conveyor in chp is covered under this item. 2. repeat all items of sl. no. –36. 3. check oil level of fluid coupling, top up if required. 4. grease pulley bearings & gear coupling & take up guides. 5. check proper functioning of thruster brakes adjust, if required. 10.380. ( fhilm00pm002 ) : ilms 02 w checks ilms 02 w checks 1. any in line magnetic separator in chp is covered under this item. 2. inspect belt for any damage. check belt sway / belt tension, adjust, if required. 3. check gear box oil level, top up, if required. check tightness all foundation bolts. 4. adjust / replace the skirt rubber. 10.390. ( fhilm00pm004 ) ilms 04 w checks ilms 04 w checks 1. any in line magnetic separator in chp is covered under this item. 2. repeat all items of job sl.no. – 38 3. grease all bearings of plumber blocks. grease the screw take up. 10.400. ( fhgzf00pm002 ) : grizzly feeder 02 w checks grizzly feeder 02 w checks 1. any grizzly feeder in crusher house is covered under this item. 2. check tightness of the foundation bolts of motor, grizzly feeder bearing housing, seal cover and any other. 3. ch. tightness tray fixing bolts, chute fixing bolts, counter weight, fixing bolts. 4. check coal leakage from gf, adjust / replace rubber dust seals. 5. clean the deck and check the welding . 6. check welding of liners. 7. check the condition of spring & reports. 8. clean the bypass chute. inspect the deck sidewalls for any crack & report. 9. any cutting / welding required is in the scope of contractor. 10.410. ( fhgzf00pm004 ) : grizzly feeder 04 w checks grizzly feeder 04 w checks 1. any grizzly feeder in crusher house is covered under this item. 2. repeat all items of job sl.no. – 40 3. grease all bearings. check condition of universal joints & propeller shaft. 10.420. ( fhpcc00pm002 ) : crushers ( <> ) 02w chks crushers 02w chks 1. any crusher in crusher house is covered under this item. 2. check the condition of hammers and report. 3. ch. gear box oil levels, top up, if required. clean the air breather / replace the gauge glass if required. remove foreign materials from tramp iron box. 4. check for any coal leakage from manholes, inspection holes etc. & arrest the leakage. 5. check tightness of all cage fixing bolts, housing bolts etc. 6. check breaker plate, shaft disc key , screen plate, frame fill piece, v shaped deflector plate, screen plate arm, liners, screw jack ( cage adjuster ) , screen clamp bar for wear and report. check the tightness of bolts and weld the bolts, if required. 7. check tightness of all bolts & nuts of gear box fan, plumber blocks & foundation bolts. 8. clean the pressure equaliser line. 9. any cutting / welding required is in the scope of contractor. 10.430. ( fhpcc00pm004 ) : crushers ( <> ) 04w chks crushers 04w chks 1. any crusher in crusher house is covered under this item. 2. repeat all items of job sl.no. – 42 3. grease nde & de bearing of crusher, cage adjusting device. 4. check fluid coupling oil level, top up, if required. ( to be done after three months ) 5. inspect breaker plate holding plate and report. 10.440 ) . ( fhttr00pm002 ) : traveling tripper 02 w checks traveling tripper 02 w checks 1. any traveling tripper in chp is covered under this item. 2. check all idlers of the tripper for free rotation / abnormal noise. 3. replace the defective idlers / idler frames. place fallen idlers. 4. check oil level / oil leakage of travel drive gear box, crd gear box and thruster, top up, if required. check / adjust tightness of thrustor brake shoe. 5. check and adjust tripper hand brake / rail cleaner. 6. check tightness of all foundation bolts of motor, gear pulley etc 7. check flap gate actuator is operating freely & closing properly. 10.450 ) . ( fhttr00pm004 ) : traveling tripper 04 w checks traveling tripper 04 w checks 1. any traveling tripper in chp is covered under this item. 2. repeat items 3, 4, 5 , 6 & 7 of job sl.no. – 44 3. check gear box air breather for clogging, clean, if required. 4. check pin bush for coupling and report for replacement, if required. 5. check tripper rail welding joints. check tightness of rail supporting structure bolts at joint, if welding is broken. 10.460 ) . ( fhs / r00pm002 ) : stacker 02 w checks stacker 02 w checks a ) boom conveyor: 1. check all idlers for free rotation, replace defective idlers / idler frame. 2. check / adjust / replace skirt rubber, scrapper rubber, dust curtains. 3. check the belt for any sway, train, if required. 4. check the oil level, top up if required. clean the air breather. 5. check free movement of thrusters, clean dust etc. from moving zone. b ) intermediate conveyor : 1. check all idlers for free rotation, replace defective idlers. 2. check / adjust / replace skirt rubber, scrapper rubber, dust curtains. 3. check the belt for any sway, train, if required. 4. check the oil level, top up if required. clean the air breather. 5. check free movement of thrusters, clean dust etc. from moving zone. c ) pcrd / ccrd 1. check proper functioning of pcrd / ccrd, rectify if required. 2. check tightness of chain, sprocket, and foundation bolts etc. 3. check oil level of angle gear box, top up, if required. 10.470 ) . ( fhs / r00pm004 ) stacker 04 w checks stacker 04 w checks a ) boom conveyor : 1. check and adjust / replace the rubber strip of scrappers / skirt rubber. 2. check the oil level of gear box, top up, if required. clean the air breather, if required. 3. check for any leakage from the seals of gear box, fluid coupling. 4. check the play in pin bush coupling, report for replacement, if required. 5. inspect pulley lagging for wear / damage. 6. tighten all foundation bolts of motor, gear box, pulley. 7. check the screw take up travel is free and there is no deformation in its guides. check the belt tension, tighten, if required. 8. check functioning of thrusters / thrustor brakes, rectify as required. b ) intermediate conveyor : 1. check and adjust / replace the rubber strip of scrapper / skirt rubber. 2. check oil level of gear box, top up, if required. clean the air breather. 3. check for any leakage from the gear box, fluid coupling. 4. check the play in pin push coupling, report for replacement, if required. 5. check pulley lagging for wear / damage. 6. tighten all foundation bolts of motor, gear box, pulley. 7. check that screw take up guide travel is free and there is no deformation in its guide. check belt tension, tighten, if required. 8. check functioning of thrustors / thrustor brakes, rectify as required. c ) pcrd / ccrd 1. check the freeness of cable rollers. 2. check & adjust cable and cable guide. 3. check the angle gear box oil level, top up, if required. 4. check tightness of foundation bolts, chain, sprocket etc. 5. grease all plumber block bearings. 6. check tightness of chain, sprocket and foundation bolts etc. 10.480 ) . ( fhfpg00pm004 ) flap gate 04 w checks flap gate 04 w checks 1. any flap gate in chp is covered under this item. 2. check oil level in the actuator gear box, top up, if required. 3. grease both side bearing of flap gate and actuator. 4. check actuator is operating freely & closing properly both sides. 5. check tightness of foundation bolts. 6. check for any wear of the flap gate surface & report. 7.check for any possible coal passing through flap gate. 8. any cutting / welding required is in the scope of contractor. 10.490 ) . ( fhrpg00pm004 ) rake & pinion gate 04 w checks rake & pinion gate 04 w checks 1. any rake & pinion gate in crusher house is covered under this item. 2. oil top up in the rpg’s both gear boxes, if required. 3. check freeness of chain sprocket wheel. 4. greasing of all the bearings. 5. check tightness of all the foundation bolts. 6. check rack & pinion gate assembly for freeness. 10.500 ) . ( fhpit03pm004 ) sump pumps 04 w checks sump pumps 04 w checks 1. for measurement purpose one pump of t / h sump pumps / lwtp vertical pump will be taken as one unit. 2. greasing of pumps bearings. 3. check the rubber spider of the coupling, replace, if required. 4. check the play in pump motor coupling, adjust, if required. 5. check tightness of foundation bolts. 6. check leakage from pipe joints & valve gland. 7. check freeness of nr valve and gate valve. 10.510 ) . ( fhdes00pm004 ) : de / ds system 04 w chks. de / ds system 04 w chks / water line checking / general checking and defect rectification of ventilation system / general checking of de system any of the following work is covered under this item. for measurement purpose any one of the following will be treated as separate unit. general checking and defect rectification of dust suppression system in tps, stacker, crusher house & wagon tippler area . pump: a ) greasing all bearings of the pump. b ) replacement / tighten the gland packing of the pump as required. c ) check any water leakage and report. check pin bush coupling condition, replace if required. d ) check tightening of all foundation bolt. or water line checking: a ) clean the pump suction strainer ( pot strainer ) & y strainer. b ) attend water leakage if any , including from hose pipe. c ) check the spray nozzle condition and report. or general checking and defect rectification of ventilation system. a ) greasing of all bearings. b ) check v belt condition, replacement and alignment if requiared. c ) check tightness of all foundation bolt. d ) rotate the fan impeller by hand and report if any abnormality is observed. e ) check the stud nut tightness of impeller. or general checking of de system. a ) greasing of all bearings. check v belt condition, replacement and alignment if required. b ) check tightness of all foundation bolt. c ) rotate the fan impeller by hand and report if any abnormality is observed. d ) check the stud nut tightness of impeller. e ) cleaning of rotary lock feeder unit and its discharge pipe. 10.520 ) . ( fhmsl01bd800 ) — de / ds / service water line & fire line defect attend replacement of pipe line , replacement of gate valve / nrv / laying of pipe line replacement of pipe line , replacement of gate valve / nrv a ) ds / de / service water line in chp / fire water b ) shifting of new pipe line at site and replacement of old pipe line. c ) any cutting welding required for the job comes under this. d ) while replacement necessary flange, gasket, fittings are also to be changed, if required. e ) shifting of old pipe line to chp scrap yard. trial run and defect rectification. f ) for measurement purpose a segment of 01 mtr length or part there of will be treated as one unit for pipe line up to 65 nb . g ) for measurement purpose a segment of 01 mtr length or part there of will be treated as 1.2 unit for pipe line 80 nb and above . or laying of pipe line a ) it covers laying of pipe line ( with fittings ) in ds / de / service water line in chp / fire water. b ) shifting of new pipe line at site. c ) while laying of pipe line necessary flange, gasket, fittings are also to be provided, if required. any cutting welding required for the job comes under this. e ) trial run and defect rectification. g ) application of 2 coats of red oxide primer paint on the pipe, red oxide primer paint is in the partys scope. h ) for measurement purpose a segment of 2mtr length or part there of will be treated as one unit for pipe up to 65nb. i ) for measurement purpose a segment of 2 mtr length or part there of will be treated as 1.15 unit. for pipe 80nb and above. 10.530 ) . ( fhlpp01bd000 ) ds pump gland packing rep. or adj. / ds pump coupling pin bush rep. / ds / de pump / fan bearing greasing / servicing of solenoid valves in ds line ‘or‘ replacement of v bells ( full set ) / rep.of vent. fan air filter / dust suppression system nozzles nipple fixing / cleaning of spray nozzles in dust suppression system any of the following work is covered under this item. for measurement purpose any one of the following will be treated as separate unit. ds pump gland packing replacement / adjustment: a ) replacement / adjustment of the gland packing of the pump for arresting water leakage. ( one side or both side as required ) . trial run and adjustment of the glands. or ds pump coupling pin bush replacement : replacement of full set of pin bush will be taken as one unit. or cleaning of y strainer in ds line : removal of the y strainers from the system, cleaning it upto the satisfaction and re fitting at original position. or servicing of valves in ds line: a ) dismantling of solenoid v / v, replacement / repairing of defective parts and reassembling. or replacement of v bells ( full set ) : a ) removal of fan belt guard. removal of damaged v belts. shifting of new v belts and fixing on the v pulley. alignment of the pulleys. trial run and defect rectification. or replacement of ventilation fan air filter ( 01 no = 01 unit ) : a ) removal of air filter from system. b ) shifting of new / repaired air filter and installation. c ) drying of the filter and fixing back to its original location. d ) rectification of minor repair is for the filters if required, or greasing of fan / pump bearings ( both bearing ) or dust suppression system nozzles nipple fixing a ) nipple to be fabricated from ½ inch, medium duty pipe, length of nipple will be 3 to 4 inches. b ) removal of damaged nipple & fixing of new . c ) fixing of spray nozzle on the nipple. or cleaning of spray nozzles in dust suppression system : a ) removal of spray nozzles from the dust suppression system. dismantling of nozzles , cleaning and re fixing it at original position. b ) for payment purpose 05 nos. of nozzles or part thereof will be treated as one unit. 10.540 ) . ( fhdes01bd800 ) replacement of fire sprinklers / replacement of fire hydrant valve / repairing of fire hydrant valve any of the following work is covered under this item. for measurement purpose any one of the following will be treated as separate unit. replacement of fire sprinklers : a ) isolation of the sprinkler line from water side if required. removal of damaged sprinkler and fixing of new one. charging of the line with water and leakage arresting if any. or replacement of fire hydrant valve: a ) replacement of any fire hydrant valve in chp is covered under this. b ) shifting of new / repaired fire hydrant valve to site and replacement of the defective valve. c ) shifting of damaged fire hydrant valve to chp workshop. or repairing of fire hydrant valve: a ) dismantling of fire hydrant valve, replacement of defective parts and re assembling. b ) spares will be provided by kbunl free of cost. however, for rubber washer, it is to be cut from rubber sheet, supplied. 10.550 ) . ( fhmsl01bd000 ) water leakage arresting from pipe line / flange ( above ground ) leakage arresting includes welding / gasket replacement / pipe fitting replacement, if any. 10.560 ) . ( fhmsl01bd801 ) / ms piping ( dia<=6 ) repair water leakage arresting from pipe line / flange ( under ground ) a ) leakage arresting includes welding / gasket replacement / pipe fitting replacement, if any. b ) dewatering of the pit, if required. dewatering pump will be provided by kbunl free of cost, if available. c ) proper cleaning of pipe surface for welding at leakage area & leakage arresting through patch work or as per direction of area engr. d ) if more than one leakage is found in one digging, it will be treated as one unit. e ) underground pipes are at 1.5m depth ( approx. ) . f ) application of wrapping & coating on pipes / patches etc. all materials in the partys scope. . 10.570 ) . ( fhdep00gn624 ) ( deptt <> manpower gang ( adl ) ) maintenance jobs per shift ( shift maintenance ) : 1. contractor has to deploy 02 ( 1 welder + 1 fitter ) , and 2 helper and one rigger for chp mechanical maintenance in shift as and when asked by eic. 2. they will be deployed for emergent type of job which are mentioned below: 3.oil topping up in gear box / fluid coupling 4. removal & fixing of coupling guards 5. opening & closing of front & back doors of crushers. 6. assistance in changing of flap gate during path selection. 7. v belt replacement if required 8. adjustment / replacement of skirt rubber 9. belt scrapper replacement / adjustment 10. patching of chute puncture 11. belt training if required 12. removal / replacement of idlers if required 13. any job assigned by eic. 10.580 ) . misc. maint. work ( code: fhmsw00bd000 ) misc. maint. work defect liability period: 01 month. a ) .cat a ( completion period 04 hrs. ) 01. belt weight, counter weight adjustment 02 key preparing / key way repair 03 hydraulic jack repair. 04 canopy cover making & fixing. 05 back plate removal & fixing. 06 inspection door removal & fixing. 07. hold back removal & fixing. 08. wiper replacement & fixing. 09. pcrd / ccrd guide roller repair replacement ( per roller ) . 10. chute chocking removal. 11. limit switch / striker fixing / sr striker fixing . 12. oil topping / oil replacement ( 01 to 50 liters ) 13. removal of hold back engagement bolt ( per conveyor ) 14. cutting set / welding m / c. shifting / material shifting 15. breather plug and gauge glass cleaning / fixing ( per gearbox ) . 16. walk way step repair & fixing 17. hs coupling bolt and bush replacement ( per coupling ) . 18. fcu oil adjustment ( per fcu ) . 19. suspension bar locking per bar. 20. coupling bolt locking through welding per bolt ( ls ) . 21. inspection cover fixing. ( per chute ) 22. crusher door sealing per crusher. 23. bearing checking / greasing ( per bearing ) . 24. r.p.g opening and closing. 25. fixing / removal of zss. 26. coupling & decoupling of equipment’s. 27. pcrd / ccrd cable positioning. 28. rail fish plate bolt replacement. 29. take up wire rope greasing / lubricating compound. 30. flap gate actuator arm pin removal & fixing. 31. hose / pipe clamp fixing 32. bolt fixing in chute bolt hole. 33. belt training / belt swaying to be aligned. 34. o ring rubber chord to be provided in input / output shaft of gear box. 35. vs ‘v’ belt set replacement & alignment. 36. fastening of belt by belt fastener ( 02 fastener for 1no.cat a ) 37. vs upper deck and lower deck repairing 38. misc. belt related jobs 10.590 ) . misc. maint. work ( code: fhmsw00bd001 ) misc. maint. work defect liability period: 01 month. a ) .cat b ( completion period 06 hrs. ) 01. gear box / conveyor ls coupling bolt removal & fixing 02. winch m / c shifting & welding at location. 03. sealing belt tensioning ( per conveyor ) / bunker sealing ( per unit ) 04. hold back replacement. 05. l.s. coupling bolt replacement ( per bolt ) 06. crusher cooler servicing. 07. chute flange joint leakage sealing / arresting by welding. 08. inspection cover replacement. 09. crusher rotor locknut tightening. / cr. bearing lock nut tightening. ( per crusher ) 10. v.s. hinge bush block replacement. 11. tripper / sr crack & broken wheel repairing. 12 fcu multi disc replacement. 13. foreign material removal. 14. r.p.g gear box replacement. 15. elect. brake shoe / manual brake adjustment / repairing. 16. gear box inspection cover removal for internal inspection 17.welding of rail / conveyor short support / stringer post / ladder repair. 18. grill repairing. 19. fg shaft bolt replacement. 20. repair of rail crack by welding. 21. shaft repairing ( welding / grinding ) . 22. chute block switch positioning and repairing. 23. pcrd / ccrd hanger repairing of sr / mt etc. 24. motor / gear / tail pulley / head pulley etc canopy or guard / cover preparing & fixing 25. key way making. 26. key making for coupling. 10.600. code: fhwgt00pm002 02 weekly checks of wagon tippler ( completion period 08 hours ) a. checking / repairing of ls & hs coupling bolts. b. checking / repairing of gear box oil level. c. checking / repairing of structures ( ballast container , way bridge, rail table, etc. ) d. checking / repairing of pinions. e. checking / repairing of connecting shafts. f. checking / repairing of power lever. g. checking / repairing of spill plates &rollers. h. checking / repairing of civil foundations. i. checking / repairing of all plummer blocks. j. checking / repairing of bull gears. k. checking / repairing of splice joints of structures. l. checking / repairing of otls switch etc. m. checking / repairing / installation of brake shoes. n. greasing of bearings by grease gun. o. checking & repairing of load shell & weigh bridge. p. spill plate roller & bracket checking / repairing. 10.610 ) code: fhwgt00pm004 04 weekly checks of wagon tippler ( completion period 10 hours ) a. checking / repairing / replacement of ls & hs coupling bolts. b. checking / repairing of gear box oil level. c. checking / repairing of structures ( ballast container , way bridge, rail table, etc. ) d. checking / repairing of pinions. e. checking / repairing of connecting shafts. f. checking / repairing of pall lever. g. checking / repairing of spill plates &rollers. h. checking / repairing of civil foundations. i. checking / repairing of all plummer blocks. j. checking / repairing of bull gears. k. checking / repairing of splice joints of structures. l. checking / repairing of otls, cam switch etc. m. checking / repairing of brake shoes. n. greasing of bearings by grease gun. o. providing of servo coat 140 on pinion & bull gear. p. all points of 02 weekly checks. 10.620 ) code: fhwgt00pm012 12 weekly checks of wagon tippler ( completion period 10 hours ) a. checking / repairing / replacement of ls & hs coupling bolts. b. checking of gear box oil condition / replacement if required. c. checking / repairing / replacement ( partly ) if required. ( ballast container , way bridge, rail table, etc. ) d. checking of bearing clearances of pinions & replacement if required. e. checking / repairing / alignment of connecting shafts. f. checking / repairing / adjustment of pawl lever. g. checking / repairing / replacement of spill plates & rollers. h. checking / repairing of civil foundations. i. checking / repairing of all plumber blocks. j. checking / repairing / replacement of bull gears ( partially ) if required. k. checking / repairing of splice joints of structures. l. checking / repairing of otls, cam switch etc. m. checking / repairing of brake shoes. n. greasing of bearings by grease gun. o. all points of 02 weekly & 04 weekly checks. 10.630 ) . code: fhwgt00gn402 inspection of wagon tippler / calibration ( completion period 04 hours ) a. checking of ls & hs coupling bolts. b. checking of gear box oil level. c. checking of structures ( ballast container , way bridge rail table, etc. ) d. checking of pinions. e. checking of connecting shafts. f. checking of pawl lever. g. checking of spill plates & rollers. h. checking of civil foundations. i. checking of all plummer blocks. j. checking of bull gears. k. checking of splice joints of structures. l. checking of otls, cam switch etc. m. checking of brake shoes. n. checking of top stop clamps and side supports & rubber o. checking of photo sensor for operation. p. weigh bridge & load shell checking 10.640 . ( fhscc00gn402 ) crushers / vibrating screen ( <> ) inspection ( a ) . remove top cover of the secondary crusher to facilitate internal inspection & cleaning. ( b ) . replace missing / loose / broken fasteners of the breaker plate / cage screen / kick off plate / tramp iron tray / end disc liner etc. ( c ) . refix the same after work is over. or ( a ) .check the condition of support springs and do the necessary adjustment / replacement. ( b ) . check and rectify the defect in the tray and its structural members. ( c ) . check receiving and discharge chute liners and report. rectify minor repair in the coffin box. ( d ) . replace the worn out skirt rubber / dust curtain. ( e ) . any other minor work has to be carried out as per direction of eic. 10.650 fheoh00oh000 ( elec hoists ( <> ) serv ) a ) . placing the hoist at suitable position for maintenance and arrange proper approach for maintenance ( b ) . opening the housing drum cover of hoist. ( c ) . checking of gears / gear box internals. repair / replace as required. clean and grease all the gears ( d ) . checking, cleaning & lubricating the bearings. replace the bearings, if reqd. ( e ) . checking the rope drum & repair / replace the parts as required. lubricate the parts needing lubrication. ( f ) . checking the rope for any defect and broken strands, replace the rope if required. clean, lubricate the rope. ( g ) . checking the load hook block assembly. clean & grease the parts. attend the defect. also check the hook for any cracks / deformation. ( h ) . cleaning and greasing guide ring and retaining ring to ensure rotation / reeling. ( i ) . checking of all the bolts, nuts and tension bar ensuring proper tightness and good condition. ( j ) . check the travel wheel and its mechanism and repair / replace as required. ( k ) . take trial of hoist on both the ends. ensure proper mechanical stopper. also check the hoist operation by lowering / raising as per limit. ( l ) . ensure proper braking of hoist on no load as well on load both. ( m ) . checking of hoist for any other defect and rectify the same. 10.660 ( fhsai00gn869 ) self algn idlr ( <> ) servicing ( servicing of trainer idler / repair of carrying / return / impact idlers ) completion time 02 hours. defect liability period 03 months. for payment purpose repair of one idler or one self adjustable frame will be considered as one unit. ( i ) servicing of trainer idler ( a ) removal of self aligning troughing trainer & return side trainer complete assembly from its position. ( b ) over haul the pivot bearing & bush by cleaning the old grease with solvent / cleaning agent, and then regrease the bush / bearing. if required, replace the bearing. ( c ) separate cloth to be used for removing the old grease, and wiping off the solvent from the bearing to avoid contamination. ( d ) optimum grease to be used such that the pivot bush / bearing is properly lubricated. grease shall not be wasted by overfilling in the housing. ( e ) re fix the complete frame back in its position, and properly tighten the bolts. if the bolts are damaged, or missing, then new bolts are to be fixed so that the frame is properly secured. ( f ) grease, bush / bearing & fasteners shall be provided by ntpc. rest all the materials & tools for cleaning to be provided by the contractor. ( g ) after complete servicing of the self adjusting idlers, clean the deposited coal on the surface of remaining rollers by soft hammering and poking. ( h ) if required, rollers are to be removed from the frames for cleaning, coal to be cleaned from the frame slots, and near bearing housing & then fixed back. ( i ) if required, also check the rollers of the assembly for their freeness, and if jammed or damaged, rollers shall be replaced. payment for roller replacement shall be made separately. ( ii ) repair of carrying / return / impact idlers ( a ) . shift damaged rollers from site or wherever dumped to work location. ( b ) . dismantle roller internals like seals, bearings, and shaft etc. ( c ) . clean roller internal properly. ( d ) . select roller shells in good condition. ( e ) . repair damaged shaft by cutting / welding / grinding. ( f ) . assembly of roller with new / good condition bearings, seals, bushes and circlips and check freeness. ( g ) . apply one coat of red oxide primer over the roller surface and put serial number on the same. total quantity :...

Eastern Railways - Bihar

43232997 supply of swing door with flap door arrangement in assembled condition for bcn wagon consisting of 35 ite ms as per annexure attached. [ warranty period: 30 months after the date of delivery ] dy.cmm / jamalpur, er bihar 83.00 set...

Eastern Railways - Bihar

43225477 supply of tyre with tube & flap ( size : 6.00x16 8pr ) for front wheel of tractor ( model hmt 3522 / 4022 ) . m ake : jk / ceat / apollo / mrf / bridgestone / bkt / goodyear or similar of oem quality. [ warranty period: 30 mo nths after the date of delivery ] ...

East Central Railway - Bihar

43151074 supply of single flap window arrangement with grill arrangement, as per icf drg. no: lgs / eog 58153003, alt a.single flap window arrangement with grill arrangement, as per icf drg. no: lgs / eog 58153003, alt a., single flap window arrangement with grill arrangement, as per icf drg. no: lgs / eog 58153003, alt a. [ warranty period: 30 months after the date of delivery ] ...

Eastern Railways - Bihar

43113688 supply of flap door complete for boxnhl wagon in assembled condition etc.flap door complete for boxnhl wagon in assembled condition etc., flap door complete for boxnhl wagon in assembled condition ( one set consisting of 11 items ) t o rdsos drg. no. wd 23018 s 02, alt.no. 2, item no. 3, 4, 5a, 5b, 5c, 10, 11, 12, 13, 16 & 17 as per annexure att ached [ warranty period: 30 months after the date of delivery ] dy.cmm / jamalpur, er bihar 9061.00 set...

East Central Railway - Bihar

43011325 fabrication and supply of side wall, end wall, flap door complete and their fitment with underframe of boxnhl wagon at mechanical workshop, e. c. railway, samastipur...

East Central Railway - Bihar

42583434 tender for fabrication and supply of side wall, end wall, flap door complete and their fitment with underframe of boxnhl wagon at mechanical workshop, e. c. railway, samastipur...

Department Of Heavy Industry - Bihar

42535101 bids are invited for lhp ghp 1 conveyor system as per technical specification , lhp ghp 2 complete truck tippler as per technical specification , lhp ghp 3 box feeder or surface feeder or bulk material receiving unit guaranteed capacity 200tph as per technical specification , lhp ghp 4 inline magnetic separators as per technical specification , lhp ghp 5 metal detectors as per technical specification , lhp ghp 6 suspended magnet as per technical specification , lhp ghp 7 belt weighers as per technical specification , lhp ghp 8 rod gates as per technical specification , lhp ghp 9 rack and pinion gates with actuators as per technical specification , lhp ghp 10 vibrating screening feeders before crusher with solid deck with all electricals and c and i as per technical specification , lhp ghp 11 hammer mill type crusher with drives for limestone as per technical specification , lhp ghp 12 complete belt feeders lbf 1, 2 as per technical specification , lhp ghp 13 limestone bucket elevator as per technical specification , lhp ghp 14 v type plough diverter including all electricals as per technical specification , lhp ghp 15 rod gates including all the supporting accessories below limestone storage silo as per technical specification , lhp ghp 16 rack and pinion gates with actuators below limestone storage silo as per technical specification , lhp ghp 17 vibro feeder including all the support accessories and electrical items below limestone storage silo as per technical specification , lhp ghp 18 complete reversible belt feeders including supply of belt on day silo building with all electricals and c and i as per technical specification , lhp ghp 19 lime stone sampling unit consisting of all the electrical items and supporting accessories as per technical specification , lhp ghp 20 rope and sheave type passenger cum goods elevator of capacity 1088kg as per technical specification , lhp ghp 21 weigh bridge 100 mt cap including all electrical lhp ghp 21 weigh bridge 100 mt cap including all electrical items and supporting accessories for limestone and gypsum handling system as per technical specification , lhp ghp 22 complete chute work including saddles, chute support structures etc., as per technical specification , lhp ghp 23 complete travelling tripper as per technical specification , lhp ghp 24 belt sealing arrangement including belt, fixtures and all supporting accessories as per technical specification , lhp ghp 25 flap gates with actuators, electrical items and supporting accessories as per technical specification , lhp ghp 26 dry type dust extraction system for all transfer points, crusher house, storage silos, truck unloading area as per technical specification , lhp ghp 27 complete plain water dust suppression system for gypsum shed as per technical specification , lhp ghp 28 complete service water system for lhp and ghp as per technical specification , lhp ghp 29 complete drinking water system for lhp and ghp as per technical specification , lhp ghp 30 exhaust ventilation for gypsum shed, tripper floor, storage silo top etc. as per technical specification , lhp ghp 31 complete air conditioning system for buildings as per technical specification , lhp ghp 32 electrical hoist with all electricals and c and i as per technical specification , lhp ghp 33 manual hoist with travelling trolley and chain pulley blocks as per technical specification , lhp ghp 34 sump pump complete with motors, local control panel, level switches, individual discharge piping with fittings and valves etc. as per technical specification , lhp ghp 35 belt vulcanizing machine including all electrical items as per technical specification , lhp ghp 36 telescopic chute with all electricals as per technical specification , lhp ghp 37 complete electrical and c and i items as per electrical scope as per technical specification , lhp ghp 38 mandatory spares as per annexure a , b as per technical specification , lhp ghp 39 construction of stores as per technical specification , lhp ghp 40 operation and maintenance as per technical specification , freight total quantity : 180...

Airports Authority Of India - Bihar

42231082 bids are invited for procurement of stationery items mse ball pen blue , ball pen black , ball pen red , binding clip medium size , battery aa , battery aaa , calculater , collin 250ml , cello tape big , cup plate set 06 06 standard , dustbin 05 ltr , duster floor 18 x 18 , duster white 18 x 18 , duster yellow 18 x 18 , fevi stick , gel pen black , gel pen blue , gel pen green , gems clip , glass tumbler , good knight liquid refill , good knight liquid refill with machine , toilet cleaner , highlighter lemon yellow , cockroach mosquito killer spray 225ml red black hit , index file , lock no 40 , lock no 55 , lock no 60 , naphthalene ball bengal chemical , odonil 50gm , packing tape 20 mtr brown , page flap , pencil , pencil cutter , pencil rubber eraser , permanent marker cd , plastic tray file tray , plastic stick file , plastic file with button , rubber band , register 01 qr , register 02 qr , register 04 qr , room freshner ambi pure , scale steel12 , scissor big , soap small , sketch pen , soap washing , stamp pad , stapler small 10 no , stapler pin big , stapler pin small , detergent powder , towel size 75cm x 150cm white , water jug 02ltr , wall clock , erazex correction pen , hand wash 200ml , hand wash pouch , glass bottle , serving tray cello , plastic bottle total quantity : 2937...

Department Of Education - Bihar

41960961 bids are invited for note sheet bucket 20 ltr , coconut broom , face tissue box , fancy register 3 quire , fancy register 4 quire , hit 700 , kangaro hp 10 stapler , kangaroo double hole punch 600 , mop , naphthalene ball , note pad oddy a5 , oddy knife , rubber band 250 , soft broom , stick file , toilet brush cleaning , gel pen blue black red , ink pad blue red , pencil , good night machine with liquid , kangaro hp 45 stapler , colin 500 , drum cartridgeb7025 versalink xerox original , drum cartridgeb1025 versalink xerox original , versalink toner b1025 original , cartridge 303 compatible , cartridge 337 compatible , duster , jk bond paper , flags , a4 paper copier 80 gsm jk , pen , pin remover , file cover , four flap file , note sheet , envelope a3 , laminated cloth envelope a3 total quantity : 10600...

Building Construction Department - Bihar

41907105 supply and installation work of furniture for new academic building at government engineering college motihari for the year 2023 24. 1 ar office table made of ms erw round tube dia 25.4 x 1.2mm thick with 18mm thick pre laminated top size 1199 x 590 x 735 mm with one side one drawer unit made of .5mm thick crca sheet mild steel, all steel components have powder coated paint fitted with lock. 2 ar 2 seater sofa overall size 1130w x 700d x 785 h cm, seat height 43.5 cm side frame assembly: the side frame assembly is fitted to the two ends of the connecting beam assembly to form, the leg cum armrest assembly. it is made of 0 3.81 ±0.03cm. x 0.2 ±0.016cm. thick ms e.r.w. tube and powder coated ( dft 40 60 microns ) . the ends are fitted with abs moulded end caps, 3. seatrest assembly:the seat rest assembly consists of a fabricated inner frame assembly insitu moulded high resilience ( hr ) polyurethane foam having density = 45 + / 2 kg / m3 with hardness load 25 ± 2 kgf as per is:7888 for 25% compression of the foam. the complete moulded seat rest assembly is covered with a replaceable fabric upholstery cover *seat size: 52.0cm. ( w ) x 50.0cm. ( d ) x 6.0cm. ( t ) , 4. backrest assembly:the backrest assembly is flexing type and consists of a fabricated inner frame assembly insitu moulded with high resilience ( hr ) polyurethane foam having density = 45 +1 2 kg / m3 with hardness load 14 ± 2 kgf as per is:7888 for 25% compression of the foam. the complete moulded backrest assembly is covered with a replaceable fabric upholstery cover. *back size: 52.0cm. ( w ) x 59.0cm. ( h ) x 6.0cm. ( t ) , 5. adj. glides: the adj glide is injection moulded in black nylon & fitted to the front end of side frame assembly along with abs moulded adj. glide base to take care or unleveled floor surface 3 ar 3 seater sofa the side frame assembly made of 38mm dia 2mm thick is fitted to the two ends of the connecting beam assembly to form the leg cum armrest assembly. it is made of a ms. e.r.w. tube duly powder coated. the ends are fitted with abs moulded end caps. tie member: it is the connecting beam assy. which holds the two side frames to each other. 2 nos. tie members are used to connect the side frames. the tie member is made of ms. e.r.w. tube 40mmx40mm 2mm thick duly powder coated. the seat / back assemblies are mounted on the tie member. l bracket of 6mm thick steel connects the back to the tie member assembly. seat foam is of 45 + / 5 kg / m3 and back foam is of 32 + / 5 kg / m3 with hardness of 25+ / 2 on hampden m / c. at 25% compression of the foam. seat size 52cm widex50cm deep and back size 52 cm wide and 60cm high. back of the sofa flexes for additional comfort 1 seater –601mmwx700mmdx 810mmh, 3 seater –1640w x 700d x 785 h cm 4 ar 3 seater steel chair cross beammade of ms erw rectangular black powder coated tube of 80 x 40 x 2 mm leg & arm rest chrome plated made of cold rolled steel. arm rest & leg assembled to the cross beam with m10 x 100 mm bolts. seat & back 1.6mm thick powder coated perforated shell of cold rolled ms sheet. side bar of chrome plated solid steel 30 x 12 mm ( din 174 ) with flunting & plastic insert .the shell is assembled on the cross beam with help of m8 bolts the overall dimension is 1608mm ( l ) x 695mm ( h ) x 555mm ( d ) , seat height : 405mm 5 ar centre table of size 1200w x 600d x 378h built with the extremely durable rubberwood, the table can hold weight up to 25kgs. with a very suitable cappuccino color, the table will complement any style of décor. the tapered legs provide stable support. it’s free of flaws design can accommodate your books, magazines, laptop and coffee mugs, all at once. the well thought out dimensions of the table make it easier to position it anywhere in the house 6 ar work bench of size 8’ x 4’ with 2 pair of legs with work top with overall dimensions. 2400mm l x 1200mm d x 950mm h, the worktop of mdf ext garde is12406 wood. max udl 1500kgs made of various layers of beech wood which are planed, glued and pressed together. this should make the work top non deformable, and load and wear resistant. bench leg: the bench leg should be powder coated should be 80mm l x 1265mm d x 960mm h. back bracing for stability 7 ar executive chair with cushioned seat is made of injection molded plastic outer & inner. plastic inner is upholstered with stitched cover and moulded high resilience polyurethane foam of density 4542 kg / m*, and hardness load 16 + 2 kgf as per 15:7888 for 25% compression.the stitched cover is made from spacer fabric and leatherette seat size : 47.0 cm. ( w ) x 48.0 cm. ( d ) , tunular frame : the powder coated ( dft 40 60 micron ) tubular frame is cantilever type & made of 02.5440.03 cm x 0.240.016 cm thk ms erw tube.the back connected to frame through powder coated ( dft 40 60 micron ) high pressure die cast connector. 8 ar office chair with seat and back are made from seasoned wood and plywood. the same is upholstered with black synthetic leather and polyurethane foam. back size 46.0cm ( w ) x27.0cm ( h ) . seat size 46.0cm ( w ) x40.0cm ( h ) . the armrest is gas assisted injection moulded from black polypropylene. the understructure assembly is a cantilever type frame.width of the chair 58cm, depth 56.5cm, height 87.5cm, seat height 48cm. 9 ar office chair : the seat and back are made up of 1.2 ±0.1cm. thick hot pressed plywood measured as per qa method described in ocp qlta p14 18 and upholstered with fabric and moulded polyurethane foam with pvc lipping all around. the back foam is designed with contoured lumbar support for extra comfort. back size 49.0 cm. ( w ) x 47.0 cm. ( h ) , seat size 49.0 cm. ( w ) x 44.0 cm. ( id ) high resilience ( hr ) polyurethane foam: the hr polyurethane foam is moulded with density = 45 ±2 kg / m3 and hardness load 16 ± 2 kgf as per is:7888 for 25% compression. 10 ar principal chair: the seat is made up of 1.4± 0.1 chick hot press 4 plywood upholstered with fabric and moulded polyurethane foam. it has a seat depth adjustment of 5.0±0.3 cm integrated in the seat through a sliding mechanism. seat size: 50.0cm ( w ) x 49.0cm ( d ) .the back is injection moulded in glass filled polyamide which is upholstered with mesh fabric. the back consist of adjustable lumbar support made of injection moulded polypropylene having an adjustment of 6.0±0.1cm.backsize: 50.0cm ( w ) x68.0 cm ( h ) .the polyurethane foam for seat is of density 55± 5kg / m3. it is made of glass filled polyamide arm structure with pu arm top and height adjustment of 7.0 ±0.5cm.the arm top has swivel and to for movements. to for movement is 6.0± 0.5cm.the inner tube of armrest is chrome plated. the mechanism is designed with the following features:• 360° revolving type.• centre tilt synchro• 3 position ( including upright lock ) giving option of variable tilt angle to the chair with anti shock feature. the headrest is injection moulded din glass filled polypropylene which is upholstered with foam and fabric has an adjustment of 6.0± 0.1cm & its assembled over the full back chair. the pneumatic height adjustment is chrome plated with an adjustment stroke of 9.0 ± 0.3cm.the pedestal is high pressure die cast polished aluminum and fitted with 5 nos. twin wheel castors. the pedestal is 65.0±0.5 cm p.c.d. the twin wheel castors are injection moulded in black glass filled polyamide having 6.0±0.1cm wheel diameter. the chrome plated tubular frame is made of día2.8±0.03cm x0.2±0.02 cm the m.s. round tube. the frame is fitted with plastic caps made of injection moulded glass filled polypropylene. 75 ( w ) * 75 ( d ) * 115 130 ( h ) * 44.5 53.5 ( sh ) . 11 ar computer chair with seat and back are made uo injection moulded high impact strenght polypropylene polymer compound with indoor graade uv resistance.the tubular weled frame is made from dia2.22 + / 0.03cmx 0.12+ / 0.0128 cm and 3.5+ / 0.03 cm x 0.12+ / 0.0128 am stainless steel 202 grade tube.the tube are buff polished to give shiny finish. cm. the shoes are made of high impact strenght polypropylene polymer. compond with indoor grad uv resistance and pressed fitted with tubularfram. size : ( w ) 52.5cm* ( d ) 55.8cm* ( h ) 84.5cm* ( seat h ) 45.0 cmseat size 52.5cm ( w ) *53.2 cm ( d ) back size 51.6 cm ( w ) *40.5 cm ( h ) . 12 ar office chair mid back pneumatic height adjustment cushioned revolving chair made up of 1.2cm thick hot pressed ply wood seat & back upholstered with fabric with moulded polyurethane foam together with moulded abs seat & back integral skin polyurethane with reinforced with m.s. insert. the tilt mechanism adjustment upright locking, 360 degree revolving type fitted with 05 nos. twin wheel castor dia 5 cm. 13 ar compactor on 12 feet rail length moves on rails. the cabinet body rigid knock down construction made of 0.8 thick crca steel eonforming to is: 513 gld. body units are bolted to undercarriage. optimizer height from ground is 2081 ] mm ( 1930 hody+ 65 under 35 channel systems ] finish: — the bodies inciuding shelves are given anti rust surface treatment 8‘ are powder coated with epoxy polyester powder oven backed with a controlled temperature of 130 deg. to 200 deg. c.sheif:l made of 0.8 thick crca steel conforming to is;513 gd. max load bearing capacin is fit! kg. udl per ahett x 5:400 kg. eauh cabinet. undercarriage: the undercarriage is a welded trams made of hr sheet 3.15 mm thick conforming [ 0 is; 1d?48movement of the system: push pull configuration { type p utype f~2 } movement of units achieved pushing or putting chrome plated 0 handle fitted suitable height on one side at body. 14 ar conference table of 30 seater capacity shall be an eco modular conference table enables various configurations to suit different conference rooms. it is made of particle board and has wire management facilities for uncluttered wiring. it has profiled legs with twin colored modesty for better looks, double 1350.0wx 600.0dx 750.0h, work surface top thickness is 25mm plb with pvc beading allover, legs modesty wire manager made from 18mm thick plt having curved profile.made from plt ( prelaminated twin ) boards 18mm thick in two shades. a wire manager running along the width of desk fitted on the modesty panel from inside. 15 ar corner table of size 530w x 450d x 450h built with the extremely durable rubberwood, with a very suitable cappuccino color, the table will complement any style of décor. the tapered legs provide stable support. it’s free of flaws design can accommodate your books, magazines, laptop and coffee mugs, all at once. the well thought out dimensions of the table make it easier to position it anywhere in the house. 16 ar dining table of 8 seater with wire manager of size 2400w * 1200d * 750h h top all tops are made from 25mm thick pre—laminated board with 2mm thick. pvc edge beading side panel all side panels are made from 25mm thick pre—laminated twin with 2mm thick pvc lipping of same color on sides and 0.8mm pvc lipping of matching color on the bottom curve, modesty these panels are made from 18mm thick pre laminated board with 0.8mm pvc lipping of matching color, access flap and switch mounting tray made from matt silver anodized aluminium extrusion and plastic moulded components to facilitate access of electrical / data voice. sockets from top, powder coated switch mounting tray made from 0.8mm and 1.2mm m.s sheet. switches to be mounted on tray as per requirement. provision for mounting 8 — module anchor roma switch plate on switch mounting tray. wire manager rehau made from rau pvc 1309 / 7558 ( black color ) . 17 ar file cabinet with 4 drawer width: 470mm, height: 1320mm, depth: 620mm , rigid knockdown construction, material: top, side & drawer frontmade from0.7mm thk **crca, drawer inside cover, side back side made from0.6mmthk **crca, back, bottom, drawer bottommade from 0.5mmthk **crca, **crcasteel confirming to is 513, grade d, label holder snap on type plastic label holder on drawer fronts, locking & anti tipping arrangement centralized lockingwith camlock& having antitipping arrangement to ensure that when one , drawer is opened for use, it does not allow other drawers to be opened, finish epoxy polyester powder coated to the thickness of 50 microns ( + / 10 ) . 18 ar fire proof cabinet shall be designed to protect the contents ( paper media documents ) against the fire hazard.shell: the external shell of the cabinet shall be of steel of minimum 2 mm thick and internal shell of steel of 1.6 mm thick, both conforming to is 513. further fortified by suitable in situ insulating fire resistant barriers to meet the required protection. the overall protection to the contents shall be minimum 70 mm on all six sides. door: the external door of the cabinet shall be of steel of minimum 2 mm thick conforming is 513 and further fortified with hard plate over the lock for burglary protection and in situ insulating fire resistant barrier material to meet required fire protection.  bolt work: the door shall be secured by four way locking mechanism / bolt work with minimum 8 moving shooting bolts of 20 mm diameter. door & body fitment: the door fits in the cabinet having tongue and groove construction that stops hot gases and high temperature to pass through and withstand temperature up to 1010 deg.c. locking: the frrc shall be equipped with a dual control high precision key lock of minimum six levers. the lock body shall be of zinc alloy and the levers in the lock shall be of brass conforming to is 410. there shall not be any dummy lever in the lock. the storage capacity shall be minimum 650 liters with minimum usable internal sizes in mm as 1620 ( h ) x 670 ( w ) x 599 ( d ) .the cabinet shall be provided with minimum four nos. adjustable shelves. 19 ar office chair with seat / back assembly: the cushioned seat assembly consists of seat base moulded in glass filled poly amide, moulded polyurethane foam & upholstered with high stretch knitted polyester fabric. the cushioned back assembly consists of back inner moulded in polypropylene in situ moulded with polyurethane foam & upholstered with high stretch knitted polyester fabric. back size : 45.5 cm. ( / 1 / ) x 53.0 cm. ( h ) seat size : 48.5 cm. ( w ) x 49.0 cm. ( d ) high resilience ( hr ) polyurethane foam: the hr polyurethane foam used in seat and back cushion is moulded in density min 48 kg / m3, and hardness load 15 ± 2 kgf as per is:7888 for 25% compression. tilt mechanism, spines & spine connector: the seat and back are firmly connected to the base frame and are cantilevered in such a way that it gives a multi dimensional movement possibility just with a simple lean on the sides or back, without need for complex manual adjustments. the cantilevered seat offers impact cushioning while sitting and synchronises with the back movement during posture changes. the s shaped spines moulded in high strength glass filled poly amide and the spine connector moulded in glass filled poly amide form the back spine structure involved in multi dimensional recline motion. the variable tilt angle recline motion can be adjusted with 3 position tilt limit feature which should be inbuilt in seat base and the tension ( return force ) should be user weight dependent. adjustable armrests: the assembly consists of armrest housing sliding over the armrest structure, both moulded in glass filled poly amide: the height adjustment feature should be button operated having adjustment of 6.6±0.5cm. the armrest top should be made up of integral skin pu moulded over plastic inner moulded in glass filled poly amide. pneumatic height adjustment: the seating height can be adjusted with a pneumatic gas lift having an adjustment stroke of 9.2 ± 0.3 cm pedestal assembly: the pedestal should be injection moulded in glass filled poly amide and fitted with 5 nos. twin wheel castors. the pedestal should be 66.0±0.5 cm. pitch centre diameter and 76.0±1.0 cm. with castors twin wheel castors :5 nos. twin wheel castos are injection moulded in poly amide having 5.0 ± 0.1 cm wheel diamter assembled to the pedestal. 20 ar hod table of size 1500 x 750 x 743 understructure: the understructure is in prelam panels, made with plt boards.drawer storage units with different combinations to support tops, made with 18mmplt boards of different colours. modesty and back panels, made with 18mm plt boards. the pedestals / storages are fitted with necessary locks plt board tops ( straight edges ) : wenge and savannah maple plt board used for making tops. pvc membrane tops ( with profiles ) : 21 ar job display board with dimensions ( 1200x900x150 ) mm board having 9 mm ply 22 ar tool display board ( 1200x900x150 ) mm board having 9 mm ply 23 ar chemistry lab table of size 4130mm x 1540mm x 900mm with pp drop sink of size 560 x 355, single tap deck mounted 8 swing goose neck, ss peg board 550x420x55 with 25 pegs. two reagent shelves of width 1050 with glass shelf. c frames all cframes assemblies should be manufactured from standard hollow metal sections; confirming to i.s. code 7138:1973 ( indian standard specification for steel tubes for furniture ) and all sheet metal components should be of crca confirming to is code 513:1994. the suspended under bench welded units should be supported on heavy duty steel frames fully carrying the load of worktops. c frame should be constructed from a rectangular pipe with a cross section of 60mm x 30mm and should be 2 mm thick and should be without a vertical front leg to give a clean look. the c frame shall also have skirting at back bottom side. horizontal members should be made from rectangular pipes of 2mm thickness. 24 ar lab table of size 4130mm x 1540mm x 900mm frames all cframes assemblies should be manufactured from standard hollow metal sections; confirming to i.s. code 7138:1973 ( indian standard specification for steel tubes for furniture ) and all sheet metal components should be of crca confirming to is code 513:1994. the suspended under bench welded units should be supported on heavy duty steel frames fully carrying the load of worktops. c frame should be constructed from a rectangular pipe with a cross section of 60mm x 30mm and should be 2 mm thick and should be without a vertical front leg to give a clean look. the c frame shall also have skirting at back bottom side. horizontal members should be made from rectangular pipes of 2mm thickness. cross sectional dimensions of the pipe should be 60 x 30 x 2 mm. 25 ar locker unit with 4 door plu + lkr ( base ) with stand size 1830hx380wx450d, stackibilit the add on units can be stacked width wise to formbank of lockers having common side panel, locking cam lock with lock leveroption of hasp arrangement, material crca 0.6mmthickness, rigid knockdown construction, shelf uniformly distributed load capacity per each shelf level is 35 kg maximum, hat self 4 door model at the top, finish epoxy polyester powder coated to the thickness of 50 microns ( + / 10 ) .ventilation attractive punched pattern for ventilation 26 ar long table of size 1800 x 900 x 740 worktop 25 mm thick plb tops with 2mm thick pvc edge beading understructure c – frames legs 1.6 mm thick m.s c­frame supporting the top. legs dia. 38.1 x 1.6 mm thick m.s erw tube. 27 ar meeting table with 10 seater with wire manager of size 2400w * 1200d * 750h h top all tops are made from 25mm thick pre—laminated board with 2mm thick. pvc edge beading side panel all side panels are made from 25mm thick pre—laminated twin with 2mm thick pvc lipping of same color on sides and 0.8mm pvc lipping of matching color on the bottom curve, modesty these panels are made from 18mm thick pre laminated board with 0.8mm pvc lipping of matching color, access flap and switch mounting tray made from matt silver anodized aluminium extrusion and plastic moulded components to facilitate access of electrical / data voice. sockets from top, powder coated switch mounting tray made from 0.8mm and 1.2mm m.s sheet. switches to be mounted on tray as per requirement. provision for mounting 8 — module anchor roma switch plate on switch mounting tray. wire manager rehau made from rau pvc 1309 / 7558 ( black color ) 28 ar notice board with size 4 x 3 surface material woolen felt / fabric in various colours, core material 9 mm thick soft board, backing material 0.62 mm to 0.82mm thick laminate sheet with extra melamine surface mix colour or 0.16 to 0.25 mm thick isi mark gp sheet, aluminium frame anodized 5 microns extruded aluminium section designation 63400 as per is:1285 2002 16 mm thickness 29 ar reception table double arch with dl top of size 2410 x 1065 x 725 worksurface, 1035 counter, d l top top clean matt pu finish 18mm thick inside radius 700.0 mm outside radius – 1350.0 mm depth – 650 mm glass frosted glass 10mm thick diamond cut finishing on edges inside radius – 1202.5mm outside radius – 1402.5mm depth – 200mm, modesty panel ms perforated sheet below worksurface : 0.8 mm ( thick ) x 665.0 mm ( height ) x 1345.0 mm ( flat length ) above worksurface : 0.8mm ( thick ) x 260 mm ( height ) x 1345.0 mm ( flat length ) , legs ms tube 1.6 mm thick diameter 50.8 mm height 604 mm. 30 ar non magnetic small white board 4 x 3 surface material 0.62 to 0.72 mm thick laminate sheet with extra melamine surface, core material 8 mm thick particle board, backing material 0.62 mm to 0.82mm thick laminate sheet with extra melamine surface mix colour, aluminium frame anodized 5 microns extruded aluminium section designation 63400 as per is:1285 2002 16 mm thickness. 31 ar steel almirah of size 1981 x 916 x 486 mm multi bend construction and inter locking design and full length over apping doors and sides. three way bolting mechanism. spot welding & co2 welding. anticorrosion treated components, oven baked powder coating process. material thickness 0.9mm.top, bottom, lh & rh sides and back material thickness= 0.9mm, removable rh & lh main door with stiffeners material thickness= 0.9mm, 4 adjustable shelves of thickness= 0.8mm 32 ar steel rack of size 6x36x18 with six shelves prime quality crc sheet conforming to is 513d / 10748 / 5986. the pitches of the slots at 19.05 mm, panel / shelves: 6 bnd bending process of 905l x 448d of load capacity 80 kgs. udl max per shelf. shelf material 0.8 mm thick ms sheet conforming to commercial quality cr 1, grade 340 of is 513, angle posts material and size rolled steel angle posts of 40 x 40 x 1.8 mm, m s sheet thickness of shelves and back ( minimum ) in mm 0.8, paint powder coated with lead free paint. 33 ar lab stool of circular type 30.0 + / 0.5 cm and made up of 0.1+ / 0.012 cm thk cr steel. it is welded to the understructure and black powder coated ( dft 40 60 microns ) . understructure assembly: the understructure is made of ms tube 2.2 + / 0.03 cm x 0.16+ / 0.0128 cm thk ms erw tube. lt is welded ti the ms fabricated circular seat assembly and black powder coated ( dft 40 60 microns ) . the understructure is provided with black pp injection moulded ferrules. 34 ar steel rack of size 2 6x36x18 with three shelves prime quality crc sheet conforming to is 513d / 10748 / 5986. the pitches of the slots at 19.05 mm, panel / shelves: 6 bnd bending process of 905l x 448d of load capacity 80 kgs. udl max per shelf. shelf material 0.8 mm thick ms sheet conforming to commercial quality cr 1, grade 340 of is 513, angle posts material and size rolled steel angle posts of 40 x 40 x 1.8 mm, m s sheet thickness of shelves and back ( minimum ) in mm 0.8, paint powder coated with lead free paint. 35 ar office table made of ms erw round tube dia 25.4 x 1.2mm thick with 18mm thick pre laminated top size 1199 x 590 x 735 mm with one side three drawer unit made of .5mm thick crca sheet mild steel, all steel components have powder coated paint fitted with lock. 36 ar wooden modular computer table: room size 10x6.5 square meter ( capacity 35 in each lab , total no. of labs 11 ) room size 09x07 square meter ( capacity 35 , total no. of labs 01 ) computer center : 17.85 x 9.75 square meter ( capacity 130 ) libarary computer lab: for 20 computer.computer lab table ( 750x600x1050 ) mm with keyboard tray. 37 ar office table made of ms erw round tube dia 25.4 x 1.2mm thick with 18 mm thick pre laminated top size 1365 x 680 x 735 ( approx. ) with both side drawer unit one side three drawers & another side two drawers made of .5mm thick crca sheet mild steel, all steel components have powder coated paint fitted with both side drawer lock 38 ar principal table main desk of size 1800 x 900 x 740, eru of size 1550 x 450 x 705 made up of top 25 mm thick plain particle board ( ppb ) clad with 0.6mm thick post formed laminate and 1mm thick backing laminate ( bdl ) . flat edge duly sealed with 2mm thick pvc beading., modesty 18mm thick plain particle board ( ppb ) clad with 1.0mm thick decorative laminate ( dl ) on both sides. edge sealed with 2mm thick pvc beading with 01 no. 3 drawers free standing pedestal. 39 ar office table with eru & pedestal of size 1350 x 750 x 750 mm + eru + pedestel main desk of size 1350 x 750 x 750 with eru of size 1200 x 450 x 750 & 01 no. 3 drawers pedestal: top panel made from 25 ±0.5 mm thk pre laminated boards as per is 12823 with 2 mm thick pvc beading on all sides. side panel the panel is made from 18 ±0.5 mm thk pre laminated boards as per is 12823 with 0.8 mm pvc beading on all sides. modestty 1 & 2 the panel is made from 18 ±0.5 mm thk pre laminated boards as per is 12823 with 0.8 mm thick pvc beading on all edges. the panel is made from 25 ±0.5 mm thk pre laminated boards as per is 12823 with 2 mm thick pvc beading on all sides, the panel is made from 18 ±0.5 mm thk pre laminated boards as per is 12823 with 0.8 mm pvc beading on all sides. the panel is made from 18 ±0, 5 mm thk pre laminated boards as per is 12823 with 0.8 mm thick pvc beading on all edges. pedestal wooden panel ( 1 box+ 1 filling ) back wooden panel is made from 18 ±0.5 mm thk pre laminated boards as per is 12823 with pvc beading on all sides. the panel is made from 9 ±0.5 mm thk pre laminated board. 40 ar steel table with stainless steel top of size 1180 x 750 x 750. worktop the top is in stainless steel brushed finish with plb insert for durability. easy to clean and maintain hygiene. side frames made from 30mm x 30mm x 1.5mm thick m.s powder coated tubes at base which are welded and are fixed to top with screws. the bottom ends are closed with plastic buffers. ms shade : s / g metallic dark grey ( nerocoat 9000626 ) , cross member made from 30mm x 30mm x 1.5mm thick m.s powder coated tube, which is welded and bolted to side frames. 41 ar teaching platform with the dimensions of length 6 ft x breadth 4 ft x height 1.5 ft with 19 mm plywood on top, shall be rectangular hallow box shape without legs. 42 ar teaching platform with the dimensions of length 12 ft x breadth 6 ft x height 1.5 ft with 19 mm plywood on top, shall be rectangular hallow box shape without legs. 43 ar wooden podium with dimensions: 45 h x 20 w x 15 d to 50 h x 25 w x 20 d presenter side height: 40 to 45 shelves: 20 h x 20 w x 10 d to 25 h x 25 w x 12 d product weight: 50 to 55 lbs. shipping weight: 65 to 70 lbs. material: scratch resistant high pressure laminate. the top of the table shall be provided 19 mm ost. the table shall be neatly finished and polished. 44 ar seminar chair with understructures could be revolving or fixed type as per need. option of hinge type and retractable desk let. desklet 100% voc free powder coating knock down design reducing transportation emissions designed for long life 45 ar office table of size 900 x 590 x 750 made of ms erw square tube 18 mm x 25mm x 1.2mm thick with pre laminated top size 1199 x 590 x 750 mm thick with single side one drawers, drawer unit made of .5mm thick ms crca sheet, all steel components have powder coated paint 46 ar non magnetic long white board 8 x 4 size and surface material 0.62 to 0.72 mm thick laminate sheet with extra melamine surface, core material 8 mm thick particle board, backing material 0.62 mm to 0.82mm thick laminate sheet with extra melamine surface mix colour, aluminium frame anodized 5 microns extruded aluminium section designation 63400 as per is:1285 2002 16 mm thickness. 47 ar double sided book rack with the dimensions width 900mm, height: 1850mm, depth: 600mm, rigid knockdown construction. construction, material crca0.8mmthickness, finish epoxypolyester powder coated to the thickness of 50 microns ( + / 10 ) .number of adjustable shelf: five adjustable shelves on one side ( total 12 loading levels ) . uniformlydistributed load capacity per each shelf is 80 kgmaximum. label holder & range indicator label holder & range indicator on eachmain unit for inserting labels. 48 ar single sided book rack with the dimensions width 900mm, height: 1850mm, depth: 316mm, rigid knockdown construction, material crca 0.8 mm thickness, finish: epoxypolyester powder coated to the thickness of 50 microns ( + / 10 ) ., number of adjustable shelf five adjustable shelves. ( total 6 loading levels ) . uniformlydistributed load capacity per each shelf is 80 kg maximum, label holder & range indicator label holder & range indicator on eachmain unit for inserting labels. 49 ar magazine rack with overall dimensions of all steel periodical display rack shall be 900mm ( w ) x450mm ( d ) x1830mm ( h ) . rigid knockdown construction , panels shall be made from crca 0.6 mm thick and front frame shall be made from crca 0.8 mm thick . crca d grade as per is 513 . there shall be 5 level racks , display tray shall be suitable for fullscape size magazines, periodicals, aesthetically appealing metal tray at an angle for easy viewing . receding facility to access the storage behind . sliding on plastic rollers . behind storage shelving each of 5 level has a behind storage shelf . uniformly distributed load capacity per each shelf is 40 kg . leveler shall be screw type with hex plastic base and finish shall be epoxy polyester powder coated to the thickness of 50 microns. 50 ar almirah with glass door size 916mm ( w ) x 486mm ( d ) x 1980mm # ( h ) # excluding leveler, construction & material • welded construction, • 0.7mm thk ( ±0.07mm ) crca* for shelf, • 0.8mm thk ( ±0.08mm ) high yield strength crca** for doors and back, • 0.9mm thk ( ±0.08mm ) crca* for all other components, crca ‘d’ grade as per is:513, crca ‘d’ grade high yield strength as per is:513, locking & handle • brass handle with • two way locking mechanism with shooting bolt, shelves • height wise adjustable shelf mounting • uniformly distributed load capacity per each full shelf is 40 kg maximum, • 4nos. of adjustable full shelf, • box file a4 size ( 85wx345hx285d ) can be stored vertically on three shelves and the clear space above fourth shelf is 240mm, • m10 screw type leveler with hex plastic base, finish • epoxy powder coated to the thickness of 50 microns ( + 10 ) . 51 ar dual desk is specially designed for rugged use with overall dimentions of l1054 x w980 x h760 mm and all edges are fillet. the desk is made of pressed formed ms crca section & crca tube fitted with pre laminated particle board top, seat & back with injection molded ppcp edge. hanger for water bottle and bag. space for keeping pen, pencil and scale. the overall appearance of the product shall be as per photograph. top injection molded ppcp edge. size : 1054x450x18 mm thk. particle board. seat injection molded ppcp edge. seat height : 450 mm , seat size : 1054x304x18 mm thk. particle board. back injection molded ppcp edge. back size : 1054x154x18 mm thk. particle board. shelf shelf 0.8 mm thk. crca sheet. bullnose front edge with stiffner 1 mm thk crca. modesty modesty 0.8 mm thk. crca sheet. slot perforated. tie members horizontal tie members 25x25x1.2 mm thk. crca pipe. footrest footrest pressed formed crca section 1.5 mm thk. side frame side frame c section pressed formed 1 mm thk.crca sheet welded with 25x50x1.2 mm thk tube. and back rest pipe ø25 x 1.2 mm thk. top end rounded. cap & levellers all pipe caps are curved ppcp material. finish all steel components are epoxy powder coated followed by seven tanks anti corrosion treatment of surface. 52 ar dressing table of size 460w x 486d x 1710h mm , mirror w x h: 362 mm x 1156 mm dressing table comes with a long mirror, two storage drawers, and a stool. available in wenge color, the dresser is crafted from good quality mdf wood, making it sturdy and lasting. the shelves of this stylish dressing table can be used to keep items like perfume bottles, hair products, and medicines, for that clutter free look. the stool, also wenge color with an orange colored cushion, offers comfortable seating, while the full length mirror is perfect to dress up, and check your overall ensemble. 53 ar steel almirah with mirror of size 900w x 507d x 1950h mm rafted from prime steel, your slimline cupboard will be resistant to corrosion and peststhis cupboard comes with 2 easily adjustable shelvesthe hanging rod inside the cupboard ensures ample space for your daily wear, suits, sarees and / or dressesknock down construction makes shifting and handling of slimline easieravailable with over head unit option to maximize vertical space usage you can also choose to have a mirror with slimlinestylish snap shut flush handle enhances slimline’s aesthetics. 54 ar auditorium chair seat / back assembly: the seat and back are made up of 1.2±0.1 cm. thick hot pressed plywood measured as per qa method described in ocp qlta p14 18 and upholstered with fabric and moulded polyurethane foam. the back is, flexing type.back size 47.0 cm. ( w ) x 51.0 cm. ( h ) , seat size 47.0 cm. ( w ) x 47.0 cm. ( d ) . 2. high resilience ( hr ) polyurethane foam: the hr polyurethane foam is moulded with density = 45±2 kg / m3 and hardness load 16 ± 2 kgf as per is:7888 for 25% compression.3. armrests :the one piece armrests are made of black integral skin polyurethane foam with 50 70 shore hardness and reinforced with m.s. insert. the armrests are scratch and weather resistant.5. understructure assembly: it is made of dia. 2.54±0.03cm. x 0.2±0.016cm. thk. m.s.e.r.w. tube with connecting strips made of 0.5 ± 0.05 cm. thk. hr steel welded to it for holding the seat. the assembly is powder coated ( dft 40 60 microns ) .the auditorium chair is designed to get mounted / grouted on floors with flooring specification as mentioned in flooring pre requisite godrej doc no: stg 129368.overall width 57.0, depth 57.0, height 86.0, seat height 44.0 cm....

Indo Tibetan Border Police - Bihar

40731622 bids are invited for wiper blade 20 eanch tata 1212 and 1613 truck , tail light assy led light type tata 1212 and 1613 truck , tail light glass tata 1212 truck , part no 257433255102 king pin upper tata 1212 4x4 truck , part no 3403321306 king pin lower tata 1212 4x4 truck , part no 257433253104 king pin bearing tata 1212 4x4 truck , king pin thrust washer tata 1212 4x4 truck , part no 72 52 12 oil seal gear box gb5 60 rear tata 1212 and 1613 4x4 truck , part no 257354249910 horn 24 volt minda tata 1212 and 1613 truck , fuel strainer tata 1212 4x4 truck , fuel strainer tata 1613 4x4 truck , diesel main pipe tata 1613 truck , tappet cover packing tata 1212 truck , filter plate tata 1613 truck , brake pipe front tata 1613 truck , brake pipe rear tata 1613 truck , part no 278609130197 air filter tata 1512 bus , starter switch old model tata 1212 truck , judgment rot tata 1212 truck , t monogram tata 1212 truck , rear view mirror tata 1212 truck , part no 278054506909 combination switch tata 1212 truck , part no 219454209951 speedo meter assy tata 1613 truck , hub check nut front and rear tata 1212 truck , hub check nut front and rear tata 1613 truck , solenoid switch 24 volt tata 1212 truck , brake actuator front tata 1212 truck , part no 275243700107 brake actuator rear tata 1212 truck , tempreture sending unit tata 1212 truck , tempreture sending unit tata 1613 truck , part no 278620999828 thermostat valve assy tata 1212 truck , thermostat valve assy tata 1613 truck , door glass tata 1212 rear and left , part no 207572500112 window glass corner tata 1613 truck , air dryer tata 1613 truck , part no 261854440159 ead light assy tata 1212 truck , part no 278620990220 water pump tata 1212 truck , part no 284841110104 center bearing with rubber 1512 bus , mud guard front 1212 tata truck , mud flap front tata 1212 truck , mud flap rear tata 1512 bus , fan belt v type tata truck , tensioner belt tata 1613 truck , tensioner assy tata 1613 truck , part no 350572030111 door lock right tata 1613 truck , part no 350572030110 door lock left tata 1212 truck , part no 3502723300113 door open handle inner tata , door opener handle outer , part no 252507120138 feed pump assy tata 1613 truck , part no 278607990134 feed pump assy tata 1212 truck , brake pipe front tata 1212 and 1613 truck , brake pipe rear tata 1212 and 1613 truck , brake automatic slack adjuster front right and left tata 1212 and 1613 truck , brake automatic slack adjuster rear right and left tata 1212 and 1613 truck , rear brake spring set tata 1212 and 1613 truck , trim pad with butan tata 1212 and 1613 truck , clutch cylinder tata 1212 truck , sleeve cylinder tata 1212 truck , clutch cylinder tata 1613 truck , sleeve cylinder tata 1613 truck , indicator assy front ashok leyland 1616 truck , door open handle outer ashok leyland 1616 truck , door open hadnle inner ashok leyland 1616 truck , diesel pipe pump to filter ashok leyland 1616 truck , u j cross ashok leyland 1616 truck , door lock right hand and left hand ashok leyland 1616 truck , shackle pin front ashok leyland 1616 truck , shackle pin rear ashok leyland 1616 truck , felxable pipe ashok leyland 1616 truck , feed pump assy ashok leyland 1616 truck , body light assy ashok leyland 1616 truck , body cabin light ashok leyland 1616 truck , side mirror left hand and right hand ashok leyland 1616 truck , mud flap front ashok leyland 1616 truck , mud flap rear ashok leyland 1616 truck , center bearing with rubber ashok leyland 1616 truck , head light assy ashok leyland 1616 truck , brake light assy ashok leyland 1616 truck , air duel valve ashok leyland 1616 truck , window glass back side tata 410 ambulance , door glass tata 407 truck , u j cross tata 407 truck , head light assy tata 407 truck , shocker rear tata 407 truck , shocker front tata 407 truck , silencer rubber tata 407 truck , silencer packing tata 407 truck , wheel cylinder tata 407 truck , master cylinder tata 407 truck , fen belt tata 407 truck , clutch cylinder tata 407 truck , vacuum booster tata 407 truck , bonnet cable tata 407 truck , trim pad tata 407 truck , accelerator pedal with sensor tata 407 truck , indicator glass tata 407 truck , indicator assy tata 407 truck , filter plate tata 407 truck , flexible pipe tata 407 truck , door glass machince right hand sml t 3500 , door glass machine left hand sml t 3500 , clutch plate sml t 3500 , pressure plate sml t 3500 , release bearing sml t 3500 , filter plate assy sml t 3500 , wiper blade sml t 3500 , side mirror sml t 3500 , accelerator cable sml t 3500 , gear lever cable sml t 3500 , radiator cap sml t 3500 , head light assy sml t 3500 , combination switch sml t 3500 , door lock sml t 3500 , back light assy led type sml t 3500 , back light glass sml t 3500 , back light switch sml t 3500 , master cylinder sml t 3500 , clutch sleeve cylinder sml t 3500 , water pump smo t 3500 , reserve tank water sml t 3500 , head light relay sml t 3500 , front axle oil seal sml t 3500 , v belt sml t 3500 , relay 12 volt sml t 3500 , hose pipe set sml t 3500 , complete panel board sml t 3500 , battery cable positive ve sml t 3500 , battery cable negative ve sml t 3500 , bearing front inner sml t 3500 , bearing front outer sml t 3500 , buffer pad rear sml t 3500 , wipper linkage sml t 3500 , door opener handle inner sml t 3500 , door opener handle outer sml t 3500 , suspension bush kit maruti gypsy , shackle pin maruti gypsy , shackle bolt maruti gypsy , ignition key maruti gypsy , disc pad maruti gypsy , brake shoe maruti gypsy , horn 12 volt maruti gypsy , yoke and teeth maruti gypsy , fuel pump maruti gypsy , accelerator cable maruti gypsy , clutch cable maruti gypsy , bonnet cable maruti gypsy , fuse 40 amp maruti gypsy , fuse 10 15 20 amp maruti gypsy , steering cross maruti gypsy , hand brake lever maruti gypsy , hand brake cable maruti gypspy , brake master cylinder maruti gypsy , shocker front maruti gypsy , shocker rear maruti gypsy , throttle body with sensor maruti gypsy , spark plug maruti gypsy , ignition coil maruti gypsy , wheel cylinder front maruti gypsy , brake pipe maruti gypsy , fuel cut relay maruti gypsy , bearing hub inner front maruti gypsy , bearing hub outer rear maruti gypsy , check nut lock patti maruti gypsy , leaf spring assy front maruti gypsy , leaf spring assy rear maruti gypsy , center bolt maruti gypsy , tail light assy maruti gypsy , parking light assy front maruti gypsy , side mirror left hand and right hand maruti gypsy , regulator assy maruti gypsy , propeller shaft complete mahindra and mahindra scorpio , rear brake light mahindra and mahindra scorpio , gear box mounting mahindra and mahindra scorpio , v belt mahindra and mahindra scorpio , relay mahindra and mahindra scorpio , fuse 40 amp mahindra and mahindra scorpio , fuse 5 10 15 20 amp mahindra and mahindra scorpio , universal joint mahindra and mahindra scorpio , rotor brake front mahindra and mahindra scorpio , disc pad mahindra and mahindra scorpio , flexible pipe filter to pump mahindra and mahindra bolero , rear brake shoe set mahindra and mahindra bolero , wheel cylinder rear mahindra and mahindra bolero , brake master cylinder assy mahindra and mahindra bolero , clutch cylinder mahindra and mahindra bolero , chain spoket set bullet motor cycle , chain spoket bullet motor cycle , spark plug bullet motor cycle , safety guard bullet motor cycle , head light bulb bullet motor cycle , back light assy bullet motor cycle , side stand complete assy bullet m cyle total quantity : 776...

Eastern Railways - Bihar

40686176 supply of flap door chainless cotter for boxn / boxnhl wagon to rdso drg.no.wd 23018 s 02, item no.9, alt. no.1. [ warranty period: 30 months after the date of delivery ] ...

Eastern Railways - Bihar

40627143 supply of flap door arrangement in assembled condition for bcna / bcnahs wagon as per rdso drg. no. wd 90030 s 66, alt .10, item no. 3, 13, 14, 15 & 16 ( in assembled condition ) . [ warranty period: 30 months after the date of delivery ] dy.cmm / jamalpur, er bihar 240.00 set...

Ministry Of Power - Bihar

40499042 bids are invited for custom bid for services consolidated mechanical maintenance contract for chp stage 1 and 2 for two years at ntpc barh 10 maint. of crusher and misc. equip s#1 10.0001 paddle fdrs (<>) 02w chks 10.0002 paddle fdrs (<>) 04w chks 10.0003 ilms/cbms(<>) 04w chks 10.0004 grizzly feeders (<>) 02w chks 10.0005 grizzly feeders (<>) 04w chks 10.0006 sec.crushers (<>) daily chks 10.0007 sec.crushers (<>) 02w chks 10.0008 sec.crushers (<>) 04w chks 10.0009 belt feeders (<>) 02w chks 10.001 belt feeders (<>) 04w chks 10.0011 travelling tripper (<>) 04w chks 10.0012 belt conv (>1400mm wd) 02w chks 10.0013 rack pinnion gate (<>) 04w chks 10.0014 flap gates (<>) 04w chks 10.0015 belt conv (>1400mm wd) checking 10.0016 belt conv (>1400mm wd) 04w chks 10.0017 deptt <> man.dep usw 10.0018 misc works (<>) analysis 10.0019 gear boxes (gears) serv 10.002 fluid cplg (pst) serv 10.0021 duct(<>) cleaning 10.0022 misc works (<>) welding 10.0023 misc works (<>) cutting 10.0024 fluid cplg (pst) repl 10.0025 conv pulleys (<>) rpl brg 10.0026 fluid cplg (<>) oil filling 10.0027 idler frame (<>) repl 10.0028 pulley/cplg (non drive) repl 10.0029 sec.crushers (screen plate) repl 10.003 sec.crushers (hammer) attend breakdown 10.0031 sec.crushers (hammer) repl 10.0032 sec.crushers (bkr plate) repl 10.0033 sec.crushers (nde brg) repl 10.0034 motorized actuators (<>) repl 10.0035 pulley/cplg(dia>6 12) repl 10.0036 misc works (<>) attend defect 10.0037 travelling tripper (railclamp) attend br 10.0038 travelling tripper (lt gearbox) repl 10.0039 gear boxes (oil seal) repl 10.004 conv scrappers (<>) attend breakdown 10.0041 chutes(<>) repair 10.0042 grizzly feeders(<>) attend defect 10.0043 coupling (<>) aligning 10.0044 flap gates(<>) attend defect 10.0045 misc works (<>) reclamation 10.0046 deptt <> man.dep sw 20 maint. of crusher and misc. equip s#2 20.0001 paddle fdrs (<>) 02w chks 20.0002 paddle fdrs (<>) 04w chks 20.0003 ilms/cbms(<>) 04w chks 20.0004 rack pinnion gate (<>) 04w chks 20.0005 grizzly feeders (<>) 02w chks 20.0006 grizzly feeders (<>) 04w chks 20.0007 sec.crushers (<>) 02w chks 20.0008 sec.crushers (<>) 04w chks 20.0009 belt feeders (<>) 02w chks 20.001 belt feeders (<>) 04w chks 20.0011 travelling tripper (<>) 04w chks 20.0012 belt conv (>1400mm wd) 02w chks 20.0013 belt conv (>1400mm wd) 04w chks 20.0014 flap gates (<>) 04w chks 20.0015 sec.crushers (<>) daily chks 20.0016 belt conv (>1400mm wd) checking 20.0017 deptt <> manpower gang(adl) 20.0018 deptt <> man.dep sw 20.0019 deptt <> man.dep usw 20.002 gear boxes (gears) serv 20.0021 fluid cplg (pst) serv 20.0022 duct(<>) cleaning 20.0023 misc works (<>) welding 20.0024 misc works (<>) cutting 20.0025 fluid cplg (pst) repl 20.0026 conv pulleys (<>) rpl brg 20.0027 fluid cplg (<>) oil filling 20.0028 idler frame (<>) repl 20.0029 pulley/cplg (non drive) repl 20.003 sec.crushers (screen plate) repl 20.0031 sec.crushers (hammer) attend breakdown 20.0032 sec.crushers (hammer) repl 20.0033 sec.crushers (bkr plate) repl 20.0034 sec.crushers (nde brg) repl 20.0035 motorized actuators (<>) repl 20.0036 pulley/cplg(dia>6 12) repl 20.0037 misc works (<>) attend defect 20.0038 travelling tripper (railclamp) attend br 20.0039 travelling tripper (lt gearbox) repl 20.004 gear boxes (oil seal) repl 20.0041 conv scrappers (<>) attend breakdown 20.0042 chutes(<>) repair 20.0043 grizzly feeders(<>) attend defect 20.0044 coupling (<>) aligning 20.0045 misc works (<>) reclamation 30 maint. of stacker reclaimer 30.0001 belt feeders (<>) 04w chks 30.0002 flap gates (<>) 04w chks 30.0003 belt conv (>1400mm wd) checking 30.0004 belt conv (>1400mm wd) 04w chks 30.0005 stacker/reclaimer (<>) 02w chks 30.0006 stacker/reclaimer (<>) 04w chks 30.0007 gear boxes (gears) serv 30.0008 fluid cplg (pst) serv 30.0009 misc works (<>) welding 30.001 misc works (<>) cutting 30.0011 chute liner(<>) repl 30.0012 fluid cplg (pst) repl 30.0013 conv pulleys (<>) rpl brg 30.0014 fluid cplg (<>) oil filling 30.0015 idler frame (<>) repl 30.0016 impact idlers(<>) repl 30.0017 pulley/cplg (non drive) repl 30.0018 misc works (<>) attend defect 30.0019 travelling tripper (railclamp) attend br 30.002 stacker/reclaimer (luff cyl) repl 30.0021 stacker/reclaimer (slew g.box) repl 30.0022 travelling tripper (lt gearbox) repl 30.0023 gear boxes (oil seal) repl 30.0024 conv scrappers (<>) attend breakdown 30.0025 chutes(<>) repair 30.0026 coupling (<>) aligning 30.0027 stacker/reclaimer (hose) attend breakdow 30.0028 gear cplg (<>) attend breakdown 30.0029 conv decks(<>) repair 30.003 stacker/reclaimer (storm lock) oh 30.0031 lub oil system (<>) centrifuging 30.0032 stacker/reclaimer (<>) lubrication 30.0033 fluid cplg (oil cooler) cleaning 30.0034 pcrd/ccrd (<>) decpl/cpl/algn 30.0035 stacker/reclaimer (luff cyl) rpl m seal 30.0036 lub oil system (pump) oh 30.0037 stacker/reclaimer (bucket) repl 30.0038 stacker/reclaimer (hyd sys) repair 30.0039 flap gates (<>) repair 30.004 pcrd/ccrd (<>) attend defect 40 maint. of wagon tippler 40.0001 belt conv (1000 1400mm wd 02w chks 40.0002 belt conv (1000 1400mm wd 04w chks 40.0003 belt conv (1000 1400mm wd 12w chks 40.0004 wagon tipplers (<>) 01w chks 40.0005 wagon tipplers (<>) 04w chks 40.0006 wagon tipplers(<>) 24w chks 40.0007 side arm/beetle chge (<>) 01w chks 40.0008 side arm/beetle chge (<>) 04w chks 40.0009 side arm/beetle chger(<>) 24w chks 40.001 apron fdr (<>) 01w chks 40.0011 apron fdr (<>) 04w chks 40.0012 apron fdr (<>) 24w chks 40.0013 flap gates (<>) 04w chks 40.0014 wagon tipplers (<>) cleaning 40.0015 fluid cplg (pst) oh 40.0016 fluid cplg (oil cooler) cleaning 40.0017 misc works (<>) attend defect 40.0018 coupling (<>) repl 40.0019 impact idlers(<>) repl 40.002 pulley/cplg (nde brg) repl 40.0021 chutes (skirtrubber) repl 40.0022 conv pulleys (<>) rpl brg 40.0023 conv pulleys(<>) repl 40.0024 wagon tipplers (hyd equp) attend breakdo 40.0025 gear boxes (i/p shaft) repl 40.0026 wagon tipplers (hyd cylinder) repl 40.0027 apron fdr (<>) attend defect 40.0028 side arm/beetle chge (<>) rpl m seal 40.0029 wagon tipplers (pinion shaft) repl 40.003 wagon tipplers (spur gear) repl 40.0031 wagon tipplers (support bracket) repl 40.0032 wagon tipplers (beam) repl 40.0033 fluid cplg (pst) repl 40.0034 side arm/beetle chge (<>) attend breakdo 40.0035 wagon tipplers (pulley/bush) repl 40.0036 misc works (<>) cutting 40.0037 misc works (<>) welding 40.0038 ms piping (nb65) laying 40.0039 fluid cplg (<>) oil filling 40.004 gear boxes (oil) top up 40.0041 wagon tipplers (<>) b 50 maint.of fire fighting ,de/ds,water line 50.0001 lp valves (deluge vv) 04w chks 50.0002 lp valves (deluge vv) repair 50.0003 lp valves (dia<=6) serv 50.0004 lp valves (dia>6 12) serv 50.0005 lp valves(dia<=6) repl 50.0006 lp valves(dia>6 12) repl 50.0007 lp valves(dia>12) attend defect 50.0008 lp valves (gland) attend defect 50.0009 lp valves (gland) repl 50.001 vert pp (<>) oh 50.0011 vert pp (<>) 04w chks 50.0012 vert pp (<>) attend defect 50.0013 lp water pump(dia>6 12) 04w chks 50.0014 lp water pump(dia>6 12) oh 50.0015 lp water pump(dia<=6) oh 50.0016 lp water pump (gland) repl 50.0017 lp water pump (<>) attend defect 50.0018 lp water pump (<>) aligning 50.0019 gi pipe (>1<=2) repl 50.002 ms piping (dia<=6) repl 50.0021 ms piping (dia>6 12) repl 50.0022 ms piping (dia>12) repl 50.0023 bends/laterals (dia<=6) fabrication 50.0024 bends/laterals (dia>6 12) fabrication 50.0025 misc works (<>) fabrication 50.0026 u/ground lines (dia<=6) attend defect o 50.0027 u/ground lines (dia>6 12) attend defec 50.0028 u/ground lines (dia>12) attend defect o 50.0029 ms piping (dia<=6) attend defect online 50.003 ms piping (dia>6 12) attend defect onl 50.0031 ms piping (dia>12) attend defect online 50.0032 ms piping (dia<=6) laying 50.0033 ms piping (dia>6 12) laying 50.0034 ds/de system(<>) attend defect 50.0035 ds/de system (<>) 04w chks 50.0036 ds/de system (sprnklr) attend breakdown 50.0037 ds/de system (<>) 16w chks 50.0038 ds/de system (<>) repl 50.0039 duct (<>) repair 50.004 strainer (<>) cleaning 50.0041 fire sys (hyd vv handwheel) attend defec 50.0042 fire sys (hydrant valve) repl 50.0043 fire sys (hydrant valve) attend defect 50.0044 fire sys (female cplg) attend defect 50.0045 fire sys (water monitor) attend defect 50.0046 fire sys (alarm gang bell) repair 50.0047 fire sys (qrtz bulb&nozzle) attend defec 50.0048 fire sys (muls spry sys) 12w chks 50.0049 fire sys (muls spry sys) attend defect 50.005 misc works (<>) attend defect 50.0051 misc works (<>) attend breakdown 60 o&m of hmv 60.0001 dozer d 155 man.dep hsw 60.0002 payloader (bl 1420) opn/mtc 60.0003 dozer d 155 01w chks 60.0004 dozer d 155 04w chks 60.0005 dozer d 155 12w chks 60.0006 dozer d 155 24w chks 60.0007 payloader (<>) 02w chks 60.0008 payloader (<>) 04w chks 60.0009 payloader (tyre) repair 60.001 misc works (<>) cutting 60.0011 misc works (<>) welding 60.0012 payloader (<>) cleaning 60.0013 payloader (bl 1420) attend defect 60.0014 dozer (hyd pump) oil filling 60.0015 crane (>15 30 mt) man.dep engr 60.0016 crane (>15 30 mt) 08w chks 70 maint.of pac system 70.0001 deptt <> opn/mtc 70.0002 pkg ac (accessories) repair 70.0003 refrigerant (r 22) matl supply 70.0004 pkg ac (fan/blade) mat supply 70.0005 pkg ac (filter) mat supply 70.0006 pkg ac (<=15 11tr) mat supply 70.0007 pkg ac (<=10 06tr) mat supply 70.0008 pkg ac (<=15 11tr) matl supply 70.0009 pkg ac (accessories) mat supply 80 pmjjsby & pmjjby reimbursement 80.0001 pmjjsby & pmjjby reimbursement...

National Thermal Power Corporation Limited - Bihar

40375985 flap gate materials for tp 9 and mobile tripper 10a b for procurement of flap gate materials for tp 9 and mobile tripper 10a b forerection of coal conveyor systems of chp stage i unit 3 ntpc barh , flap assy,gen 836,precision , actuator,ele,linear,625mm,p5/5000kg , mounting plate,precision process , pin,precision process,actuator , arm assy,gen 837/836/838/839+,precision => limited...

Eastern Railways - Bihar

40181943 supply of supply & fitment of showcase for bearingsupply & fitment of showcase for bearing,supply & fitment of showcase for bearing museum underneath shoe rake with flap door. size 8 feet x 1.5 feet x 5 feet as per drawing attached. a) supply and fitment frame: material mild steel 15 mm thick angle plate (b) waterproof compressed plywood of 10mm thickness to be used as it is to be kept in open area, (c) 6mm toughened glass to be used, (d) tube light fitting arrangement to be provided, (e) glass to be fitted with aluminium framing, (f) vertical side to be opened with lower end, (g) each door to be tied with 03 hinged and lock. (h) handle to be provided in each door, each door to be fitted with 03 hinges, 1 handle and locking arrangement [ warranty period: 30 months after the date of delivery ] => limited...

Indian Army - Bihar

40108658 bids are invited for airframe spares of zen air microlight aircraft 1 cowling cover nut cowling dzus fasteners 16 by 2 2 landing gear nose nose gear strut assy 3 steering rod right 4 steering rod left 5 wheel drum 1 set 6 landing gear rear 7 interior door handle 8 exterior door handle 9 nose wheel axel without axle spacers 75l151 10 main wheel axel and cotter pin and large nut 11 control cable and control rods 12 flap control bearing 13 nose gear bungee 14 brake shoe set set of 04 nos 15 cushion pad 16 wind shiled sheet 1 point 6 mm shadik 17 engine control cable for chock and throttle 18 engine mounting rubber set of six 19 fuel tank with filler cap and lever sensor 20 engine mounting bracket bolt allen key 21 radiator mounting bush 22 jubilee clip set of 10 23 hose clamps half dia set of two 24 bmc port side set of two 25 teflon bush nose stud 26 fairview brake line total quantity : 37...

Border Security Force - Bihar

39995624 bids are invited for spare part mse axel front 4x4 u j cross bolero 4x4 2016 model , front hub bearing outer bolero 4x4 2016 model , front hub bearing inner bolero 4x4 2016 model , hub oil seal outer front bolero 4x4 2016 model , hub oil seal inner front bolero 4x4 2016 model , rear wheel oil seal bolero 4x4 2016 model , front check nut with lock bolero 4x4 2016 model , front hub oil seal both side tata 407 bs4 2015 model , rear hub oil seal both side tata 407 bs4 2015 model , wiper blade tata 407 bs4 2015 model , rear mudguard flap 18 inch x 12 inch rubber , king pin bearing tata 407 bs4 2015 model , tie ro end assy total quantity : 28...

Kendriya Vidyalaya Sangathan - Bihar

39880329 bids are invited for dustless chalk , dusters , paper pin , a4 size papers , glustick , colour paper flap , box file cover , file binder , white cello tape , tissue paper , zebra paper pin , stapler , pen , marker pen , chart papers , drawing pin , phenyl liquid , room freshener , bleaching powder , fast card , cleaning gloves , wiper , dusting clothes , wipe clothes total quantity : 321...

Eastern Railways - Bihar

39821234 supply of swing door with flap door arrangement in assembled condition for bcn wagon consisting of 35 items as per annexure attached. [ warranty period: 30 months after the date of delivery ] ...

Eastern Railways - Bihar

39773535 supply of flap door chainless cotter for boxn / boxnhl wagon to rdso drg.no.wd 23018 s 02, item no. 9, alt. no.1. [ warranty period: 30 months after the date of delivery ] ...

Eastern Railways - Bihar

39533620 supply of flap door chainless cotter rivet to rdsos drg no wd 90007 s 1, item no 2, alt.no.20 [ warranty period: 30 months after the date of delivery ] => limited...

Eastern Railways - Bihar

39526892 supply of locking bolt for flap door ( boxn wagon ) to rdsos drg no wd 90007 s / 1, item no 15 ( fifteen ) , alt no 20. [ warranty period: 30 months after the date of delivery ] ...

Border Security Force - Bihar

39394858 bids are invited for boq bid seat protection cover set of 7 , floor mating lamination , foot mate complete set of 5 , revolving light led type 12v , command light 12v , lt wire 6 mm , pull push switch , flasher unit 12v , mudguard flap set of 4 , side step lh rh set of 2 , siren 12 v hooter , window glass lemination , hand rest , all glass chrome , cabin light , rain visor set of 4 , steering grip , digital watch total quantity : 31...

Eastern Railways - Bihar

39391595 supply of flap door chainless cotter for boxnhl wagon as per rdso drg. no. wd 23018 s 02, item no. 9 [ warranty period: 30 months after the date of delivery ] ...

Ministry Of Power - Bihar

39341986 bids are invited for procurement of mdv flap with bolt for coal mill xrp 803 ( q3 ) total quantity : 120...

Eastern Railways - Bihar

39274368 supply of flap door complete for boxnhl wagon in assembled condition ( one set consisting of 11 items ) to rdso drg. no. wd 23018 s 02, alt.no.1. as per annexure attached. [ warranty period: 30 months after the date of delivery ] ...

National Thermal Power Corporation Limited - Bihar

39163979 procurement of bankim make spares of swing check valves nrv and globevalve for ash handling system in ntpc nabinagar. , bonnet, ci, bankim, glb vv, 150nb, pn16 , disc, 3, bankim, valve, 150nb, pn10 , gland, 4, bankim, valve, 150nb, pn10 , hand wheel, 5, bankim, globe valve , stem, 6, bankim, valve, 150nb, pn10 , body seat ring, 7, bankim, valve , disc nut, 9, bankim, valve , back seat bush, 14, bankim, valve , bonnet, ci, bankim, glb vv, 300nb, pn10 , hand wheel, ci, bankim, glb vv, 300nb, pn10 , body seat ring, brnz, bankim, glb vv, 300nb , disk facing rng, brnz, bankim, glb vv, 300nb , disk nut, brnz, bankim, glb vv, 300nb, pn10 , back seat bush, brnz, bankim, glb vv, 300nb , hinge brckt, ci, bankim, cv, 150nb, pn10 , flap facng rng, brnz, bankim, cv, 150nb, pn10 , hinge pin, ss, bankim, cv, 150nb, pn10 , body seat ring, 9, bankim, valve , flap, 3, bankim, valve, nrv 200 , hinge bracket, 4, bankim, valve, nrv 200 , body seat ring, 5, bankim, valve , flap facing ring, 6, bankim, valve , hinge pin, 7, bankim, valve , flap, z018, bankim, valve , hinge bracket, 4, bankim, valve , body seat ring, 5, bankim, valve , flap seat ring, 6, bankim, valve , hinge pin, 7, bankim, valve , flap, 3, bankim, valve, 350nb , hinge bracket, 4, bankim, valve , body seat ring, brnz, bankim, cv, 350nb, pn10 , flap facng rng, brnz, bankim, cv, 350nb, pn10 , hinge pin, 7, bankim, valve , flap, bankim, valve, 400nb, pn16 , hinge bracket, 4, bankim, valve , body seat ring, 5, bankim, valve , flap seat ring, 6, bankim, valve , hinge pin, 7, bankim, valve => limited...

Tata Memorial Center - Bihar

39011025 tender for immobilization devices and mould room accessories. a immobilization 1. universal low density carbon fibre base plate for 3 sets ( 2 for fixation with immobilization accessories for head & la.1 for ct neck, breast & thorax and abdomen / pelvis for both sim ) adult and pediatric patients including the storage ( to include facility for prone breast immobilisation also in addition to supine pediatric head support in pe foam ( model 8 pocl ) breast immobilisation ) & also including ( low density head support with lateral flap model a, low density head support with lateral flap model b, low density head support with lateral flap model c, & with lateral necks flaps ) universal low density carbon fibre base plate for fixation with immobilization accessories for srs & srt with couch extension thermoplastic materials: please provide the technical 2 sets b thermoplastic mould ( for various sites ) information with specifications ( to provide fda / ce certifications and discosures ) precut h&n ( clamp / pins / fixations ) please specify precut head [ clamp / pins / fixations ) please specity 50 precut pelvic ( clamp / pins / fixations ) please specify precut pediatric ( clamp / pins / fixations ) please specify 25 10 precut h & n, head for srs & srt ( clamp / pins / fixations ) please specity vacum cushion bag ( full body ) pediatric 10 vacum cushion bag ( full body ) adult c comprehensive electron block mould system ( including styrofoam cutter ) electron foam cutter 1 no., electron foams 10 nos low melting alloy 25 kg, alloy melter 1 & all other essential accessories required for the operation 20 1 set d heat gun e vacuum cushion standard set ( 1 ) . vacuum station pump with gauge ( n 1 ) and storage set ( n=3 ) heat gun with temperature and flow control. make: bosch / black & decker / steinel / dewalt vacuum station pump with gauge ( n 1 ) . and storage set ( n=3 ) f 3 shoulder retractors g body calipers h ct marker dots i bar indexers jbolus of different thickness ( qty. 2 each ) ( preferably gel ) of different sizes 40cmx45cmx1cm; 40cmx45cmx0.5cm 3 1 set ( 100 nos. ) 3 pairs 2 set ( total = 2x2 = 4 ) k strong scissors l water bath with adequate thermostat. stainless steel outer body for use with all sizes of thermoplastic material. electronically controlled and digitally adjustable to ensure the desired temperature. warranty: 2 years and free amc for 8 years...