Northeast Frontier Railway - Bihar

45072182 bids are invited for custom bid for services hiring of one tata or similar vehicle of minimum 10 t capacity including driver and khalasi and all other consumable including diesel oil as per scope of work for transportation of cw material for njp , custom bid for services running charges of truck including cost of fuel and lubricant as well as other consumable total quantity :...

Ministry Of Power - Bihar

45039386 bids are invited for procurement of consumables for ntpc nabinagar m1147991733 rust cleaner aerosol ind mtl 500ml , m1147991734 ec cleaner aerosol ind 500ml , m1147991736 cont cleaner aerosol industrial , m1147991737 antiseize lubricant paste or semi solid , m1147991735 rust remover and distn liq ind mtl , m1147200320 lubricant 1kg can white petroleum jelly total quantity : 600162...

Eastern Railways - Bihar

44487225 supply of lubricant for pressing in of wheelslubricant for pressing in of wheels,lubricant for pressing in of wheels on axle in 1 kg pack, 1)nalco 3295 ofm/ s.nalco india ltd.kolkata or 2)arca mounting paste of m/s.fag bearings indi ltd.new delhi. [ warranty period: 30 months after the date of delivery ] ]...

Bharat Heavy Electricals Limited - Bihar

44471770 tender for design, engineering, manufacture, fabrication, assembly, inspection / testing, painting including maintenance tools & tackles, fill of lubricants & consumables alongwith spares for erection, commissioning spares as required, mandatory spares forwarding, proper packing, shipment and delivery at site ,unloading, handling, transportation & storage at site, in site transportation, assembly, erection & commissioning, final painting at site, minor civil work, trial run at site and carrying out performance guarantee / functional / demonstration tests at site (as applicable), training of ntpc/bhel personnel of hvac system for fgd project 2x660 mw ntpc barh stpp stage ii (fgd system package)...

East Central Railway - Bihar

44457983 supply of set of lubricant/oil itemsset of lubricant/oil items,set of lubricant/oil items for vande bharat as per annexure a, make medha. [ warranty period: 30 months after the date of delivery ] ]...

Border Security Force - Bihar

44373784 bids are invited for lubricants engine oil 15w40 , gear oil hp 90 , mgo maruti gypsy , coolant , 4 t oil bullet , 4 t racer tvs apache , brake fluid dot 4 , mahindra and mahindra ultra engine oil bolero bs 6 , mahindra and mahindra feo engine oil scorpion , grease ep 2 , 4 t 15w 50 gear oil tvs apache , def oil ad blue , def oil mahindra total quantity : 1167...

Bharat Heavy Electricals Limited - Bihar

44293468 design supply erection and commissioning of hvac system barh ii , totalprice for “supply part including mandatory spares and services comprising of design (i.e. preparation and submission of drawing /documents including “as built” drawings and o&m manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendors & sub vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables along with spares for erection, start up and commissioning as required, forwarding, proper packing, shipment and delivery at site, unloading, handling, transportation & storage at site, in site transportation, assembly, erection & commissioning, final painting at site, minor civil work, trial run at siteand carrying out performance guarantee / functional / demonstration tests at site (as applicable), training of ntpc/bhels o&m staff and handover in flawless condition of the package to the end customer complete with all accessories for the total scope defined as per bhel nit & tender technical specification (pe ts 443 (571 13000 a) a002) as specified above, amendment & agreements till placement of order. (refer tender doc for details)...

Eastern Railways - Bihar

44286510 supply of p 80 rubber lubricant emulsionp 80 rubber lubricant emulsion,p 80 rubber lubricant emulsion for lubrication of bogie rubber bushes of hhp locomotives to dlw drg no.8251651 and to dlw part no.17270650 supplied in 1 litre container. [ warranty period: 30 months after t he date of delivery ]...

Ministry Of Railways - Bihar

43958155 bids are invited for supply of various items track based lubricator (electronic type) electronic track based lubricators for gauge face lubrication. (rdsq approved) the lubrication system specially designed to apply lubricants on curves under different environment & traffic conditions on indian railway, toe load measuring electronic device, battery operated champering kit, brush cutter, make honda, wire rope size 16 x 19 for l,c gate total quantity : 1...

Bharat Heavy Electricals Limited - Bihar

43784000 tender for design, engineering, manufacture, fabrication, assembly, inspection / testing, painting including maintenance tools & tackles, fill of lubricants & consumables alongwith spares for erection, commissioning spares as required, mandatory spares forwarding, proper packing, shipment and delivery at site ,unloading, handling, transportation & storage at site, in site transportation, assembly, erection & commissioning, final painting at site, minor civil work, trial run at site and carrying out performance guarantee / functional / demonstration tests at site (as applicable), training of ntpc/bhel personnel of hvac system for fgd project 3x660 mw ntpc barh stpp stage i (fgd system package)...

Bharat Heavy Electricals Limited - Bihar

43777679 supply and installation of hvac system for fgd project 3x660 mw ntpc barh stpp stage i , totalprice for “supply part including mandatory spares and services comprising of design (i.e. preparation and submission of drawing /documents including “as built” drawings and o&m manuals), engineering, manufacture, fabrication, assembly, inspection / testing at vendors & sub vendor’s works, painting, maintenance tools & tackles, fill of lubricants & consumables along with spares for erection, start up and commissioning as required, forwarding, proper packing, shipment and delivery at site, unloading, handling, transportation & storage at site, in site transportation, assembly, erection & commissioning, final painting at site, minor civil work, trial run at siteand carrying out performance guarantee / functional / demonstration tests at site (as applicable), training of ntpc/bhels o&m staff and handover in flawless condition of the package to the end customer complete with all accessories for the total scope defined as per bhel nit & tender technical specification (pe ts 442 (571 13000 a) a002) as specified above, amendment & agreements till placement of order. (refer tender doc for details)...

Prisons and Correctional Services Department - Bihar

43594218 selection of agency for supply of raw materials for printing press industries in various jails 1 paper 43cm x 69 cm 2 paper 46cm x 58.5 cm 3 ruling paper 41cm x 64 cm 4 paper 50cm x 75 cm 5 paper 58.5 cm x 91 cm 6 flyleaf board plastic coted 71cm x 56 cm (yellow, red, green, khakhi, orange, blue, white, sky blue, gray, pink) 7 flyleaf board simple 71cm x 56 cm (yellow, red, green, khakhi, orange, blue, white, sky blue, gray, pink) 8 ledger paper 43 cm x 69 cm 70 gsm 9 colored paper (yellow/red/blue/green) 46cm x 58.5 cm 10 cardboard paper 11 laser tracing paper a4 12 laser tracing paper a3 (legal) 13 royal blue ink 14 magenta ink 15 black ink(offset press machine) 16 red ink(offset press machine) 17 yellow ink (offset press machine) 18 green ink (offset press machine) 19 blue ink(offset press machine) 20 natural gum arabic solution for ps plates 21 ink tack reducer 22 fountain solution concentrate 23 copper sulphate commercial grade 24 silicon grease 25 image remover fluid for ps plate 26 plate cleaner 27 press wash 28 density booster 29 powder developer concentrate for analog positive plates 30 engine lubricant oil (mobil) 31 uv ctp + ve plate (analog positive plates) long run 32 viscose sponge 33 stulen sheet (fine) 34 dumping cloth for offset machine roller size 200 35 dumping socks 36 stiching steel wire 20 nos. 37 4 ply blanket 38 under blanket 39 rubber shocker for offset machine 40 synthetic adhesive 41 book binder sewing needle 42 nylon thread for register binding 43 binding cloth 44 cardboard (pakki kut) 45 marble paper 46 bopp transperent self adhesive tape 1/2 width 47 bopp transperent self adhesive tape 48 mm width 48 packing repeat for pet strap 49 cutting machine beat 50 numbering machine 51 brush card 52 repeat for flyleaf 53 plastic coated packing wrapper sheet 54 packing corrogated box for a4 bundles 55 cartoon strap 56 lamination plastic sheet roll 57 adhesive for lamination machine ...

Eastern Coal Fields Ltd - Bihar

43535589 welding, cutting, cleaning, de scaling of lubricants, removal of debris arising out of dust accumulation, handling of ropes, cables, drag chains, hoist chains & consumables of 7820 dragline for 6 (six) months....

Eastern Railways - Bihar

43523886 supply of lubricant for pressing in of wheelslubricant for pressing in of wheels,lubricant for pressing in of wheels on axle in 1 kg pack, 1)nalco 3295 ofm/ s.nalco india ltd.kolkata or 2)arca mounting paste of m/s.fag bearings indi ltd.new delhi. [ warranty period: 30 months after the date of delivery ]...

Indian Army - Bihar

43463005 bids are invited for dental material inj lignocaine hcl 2percent without adrenaline vial of 30 ml , lignocaine hcl 2 percent with adrenaline 1 is to 80000 30 ml vial , cavity liner calcium hydroxide based self cure radiopaque two paste system tube of not less than 10 gm , root canal preparation gel edta , desensitizing tooth paste stannous fluoride or pottasium nitrate or sodium monoflorophoshate 50 gm , chorohexidine mouthwash 0.2 percent bott of 100ml , calcium hydroxide based root canal sealer , antiseptic oral pain relieving topical gel , lubricant for dental use , lidocaine arosal spray , gutta percha solvent 10 to 20 ml bottle , gauze absorbent folded two and half cm and 100 mtr , pad cotton wool absorbant dental box of 100 , dental cotton rolls , gum paint for dental use total quantity : 2817...

National Thermal Power Corporation Limited - Bihar

43351587 bids are invited for custom bid for services 200131813 biennial contract for mechanical maintenance of chp system equipment ntpc kanti, 10.10. ( fhcpl00bd800 ) coupling ( <> ) replacement coupling replacement. for measurement purpose any one of the following will be treated as one unit. replacement of fluid coupling ‘or’ conveyor drive brake drum ‘or’ gear box cooling fan or flexible coupling a ) shifting of new / repaired fluid coupling / brake drum / cooling fan / flexible coupling at site. b ) decoupling of fluid coupling / dismantling of thruster brakes ( if required ) and shifting of motor to the required place. c ) removal of fluid coupling / brake drum / cooling fan / flexible coupling from motor / gear box. d ) mounting of new / repaired fluid coupling / brake drum / cooling fan / flexible coupling, placement of motor and oil filling in coupling if required. e ) coupling of the drive and system normalization after the alignment. f ) trial run and defect rectification, if any fluid coupling dis mounted after dismantling then assembling of coupling after defective part replacement is in the scope of the contractor without any extra claim. g ) shifting of old fluid coupling / brake drum / cooling fan at chp workshop or as per direction of engr in charge. h ) if brake drum, cooling fan and flexible coupling replaced at a time, no extra payment will be made. it will also be applicable for removal & remounting of couplings. i ) cutting / welding required for the job comes under contractor’s scope. 10.20 ) . ( fhiid00bd800 ) impact idlers ( <> ) repl. idlers repl. / screw take up tightening and loosening / idler frame repl. / scrapper repl. / deck plate repl. replacement of rollers / idlers: [ for payment purpose replacement of total no. of rollers / idlers in one frame carrying / return will be treated as one unit. ] a ) replacement of any rollers / idlers in chp comes under this. b ) shifting of new / repaired rollers / idlers at site and fixing at required place. c ) shifting of old / damaged rollers / idlers to chp workshop / chp scrap yard. d ) if more than one rollers / idlers are replaced in same frame simultaneously, it will be treated as one unit. ‘or’ for measurement purpose any one of the following will be treated as one unit. screw take up loosening and tightening: a ) it includes all screw take ups in chp conveyors. b ) loosening of screw take up as per requirement and retightening it as per direction. or replacement of idler frame: a ) replacement of any idler frame in chp comes under this. b ) shifting of new / repaired idler frame at site and fixing at required place. c ) shifting of old / damaged idler frame to chp workshop / chp scrap yard. d ) if idlers are also replaced during frame replacement, no extra payment will be made. e ) cutting / welding required for the job comes under contractor’s scope. ‘or‘ scrapper replacement: a ) removal of worn out rubber, making new rubber from old conveyor belt / rubber sheet, as per requirement. b ) fixing of rubber in scraper and reinstallation on the conveyor. c ) cutting / welding required for the job comes under contractor’s scope. ‘or‘ replacement of deck plate ( 01. no ) : a ) removal of existing plate after removing the idlers & frames as required. b ) shifting of new deck plate ( including wooden one ) at site & fixing it. c ) normalization of the system. d ) cutting / welding required for the job comes under contractor’s scope. 10.30 ) . ( fhg / b58bd800 ) gear boxes ( hold back ) repl ( 6 hrs ) gear box hold back replacement / fluid coupling oil replacement / decoupling and coupling of gear coupling / thruster replacement / thruster overhauling gear box hold back replacement: a ) replacement of hold back of any conveyor gear box in chp comes under this. b ) shifting of new / repaired hold back from chp store / central store / central workshop to site. c ) removal of old hold back from gear box and fixing of new hold back. d ) trial run and defect rectification, if any. e ) shifting of old hold back to chp workshop. for payment purpose one g box hold back repl. will be treated as one unit. ‘or’ fluid coupling oil replacement: a ) oil replacement of any fluid coupling in chp comes under this. b ) removal of coupling guard, opening of fusible plug / filling plug and draining of oil in a can & shifting it to chp scrap yard. c ) shifting of oil at site & filling in the fluid coupling up to specified angle. d ) fitting the fusible plug / filling plug, fixing of coupling guard. for payment purpose two fluid coupling oil replacements will be treated as one unit. ‘or‘ decoupling and coupling of gear coupling ( after greasing ) : a ) this covers all gear couplings being used in chp. for payment purpose decoupling and coupling of gear coupling of one gear coupling will be treated as one unit. ‘or thruster replacement: a ) replacement of any thruster ( except stacker rail clamp ) in chp comes under this. b ) shifting of new / repaired thruster at site. c ) removal old thruster and fixing of new one, stroke adjustment as per requirement. d ) shifting of old thruster to chp workshop. e ) trial run and defect rectification if any for payment purpose one thruster repl. will be treated as one unit. ‘or’ thruster overhauling: a ) this covers for any thruster being used in chp b ) dismantling of thruster as per direction of area engr. c ) replacement of damaged part as per direction & reassembling. d ) oil filling and testing for smooth operation. for payment purpose one thruster overhauling will be treated as one unit. 10.40 ) . ( fhp / c12bd800 ) pulley / coupling ( nde brg ) repl servicing of fluid coupling / replacement of conveyor non drive end bearing / plumber block for measurement purpose any one of them will be treated as separate unit. servicing of fluid coupling: a ) this covers any fluid coupling being used in chp. b ) dismantling of fluid coupling as per direction. c ) replacement of defective parts of fluid coupling as per direction and re assembling. d ) testing of oil leakage by filling oil. defect rectification, if any. ‘or’ replacement of conveyor non drive end bearing / plumber block: a ) it includes any bearing / plumber block of any pulley including gtu / bend / snub / drive pulley of any conveyor in chp. b ) belt clamping, take up lifting & lowering will be in the scope of this contract. c ) shifting of new bearing / plumber block at site. d ) opening and removal of plumber block / bearing form the pulley. e ) mounting of new bearing on the pulley and fixing of plumber block and greasing bearings. f ) if required bearing of non drive pulley will also be replaced. g ) system normalization. trial run and defect rectification, if any. h ) if plumber block is replaced at the time of bearing replacement, no extra payment will be made. 10.50 ) . ( fhcht51bd800 ) chutes ( skirt rubber ) repl skirt rubber replacement / shifting of oil / lubricant drums skirt rubber replacement: a ) replacement of rubber of any skirt comes under this, if skirt is damaged. b ) opening of skirt rubber clamp and removing of worn out rubber. c ) making the new skirt rubber, from old conveyor belt / skirt rubber sheet, as per requirement. d ) fixing of new rubber in frame & mounting it on the skirt and trial run for leakage arresting. e ) for measurement purpose, for measurement purpose one metre or part will be taken as one unit. ‘or’ shifting of oil / lubricant drums from central stores or any other place inside plant to chp store and vice versa: a ) it includes shifting of filled oil / grease drums from central stores or any other place inside plant to chp store and vice versa. b ) shifting of one drum will be taken as one unit. c ) transportation arrangement is to be arranged by the contractor. 10.60 ) . fhp / c52bd800: conv pulleys ( <> ) ( non drive ) repl conv pulleys ( non drive ) repl / replacement of take up pulley / replacement of conveyor pulley bearing / plumber block ( drive end ) / gear coupling replacement ( one pair ) a ) replacement of all non drive pulley including snub pulley, bend pulley, tail pulley and tail snub pulley comes under this. b ) shifting of new / repaired pulley from chp store / central store / central workshop to site. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) removal old pulley, bearings and plumber block from the old pulley. e ) mounting of bearings and plumber blocks, on the new pulley. f ) placement of new pulley on position and alignment with the system. g ) system normalization trial run and defect rectification, if any. h ) shifting of old pulley to chp workshop / central workshop. ‘or’ replacement of take up pulley: a ) replacement of take up pulley of any conveyor comes under this. b ) shifting of new repaired pulley at site. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) cutting the conveyor belt at the required place if required and removal of old pulley from foundation. e ) removal of bearings / plumber blocks of pulley. f ) mounting of bearings and plumber blocks on the new pulley. g ) lifting of new pulley and mounting it on the foundation. h ) pulling of conveyor belt and belt joint will not be in the scope of this contract. i ) system normalization, trial run & defect rectification, if any. j ) shifting of old / damaged pulley to chp / central workshop. ‘or’ replacement of conveyor pulley bearing / plumber block ( drive end ) : a ) decoupling of gear box and shifting it to the required place. b ) removal of low speed side coupling half. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) drive pulley lifting and removal of plumber block / bearings. e ) shifting of new bearing / plumber block and mounting it on the pulley. greasing of bearing. f ) system normalization, placement of gear box and alignment. g ) trial run and defect rectification, if any. h ) if plumber block is replaced at the time of bearing replacement, no extra payment will be made. ‘or’ gear coupling replacement ( one pair ) : a ) replacement of any gear coupling of any conveyor belt comes under this. b ) shifting of new / repaired gear coupling at site. c ) removal of coupling guards, decoupling of gear box from both high speed side and slow speed side. shifting of motor and gear box at required place and removal of gear coupling after dismantling of thruster brake, if required. d ) mounting of new gear coupling, placement of gear box at foundation. e ) normalization of system after alignment, for alignment. f ) trial run and defect rectification, if any. g ) shifting of old gear coupling to chp workshop. h ) cutting / welding required for the job comes under contractor’s scope. 10.70 ) . ( fhcnp00bd800 ) conv pulleys ( <> ) repl replacement of drive pulley: a ) replacement of drive pulley of any conveyor in chp ( except coal / sampler ) comes under this. b ) shifting of new / repaired pulley from central store / chp store / central workshop to site. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) decoupling the gear coupling and removal of drive pulley after opening and removal of discharge hood. e ) removal of gear coupling, bearing & plumber blocks. f ) mounting of gear coupling, bearings and plumber blocks on the new pulley. g ) placement of new pulley on position & alignment of the pulley with gear box to the satisfaction of engr. in charge. h ) system normalization trial run & defect rectification, if any. i ) shifting of old pulley to chp workshop / central workshop 10.80 ) . ( fhpcc53bd800 ) crushers ( hammers ) repl replacement of full set hammers replacement of full hammers: a ) weighing of new hammers, weight balancing and shifting them to the site after internal inspection of crusher. b ) removal of hammers from the crusher and replacement of new hammers as per direction of area engineer or his representative. c ) shifting of old hammers to chp scrap yard. d ) any cutting / welding required will be in scope of contractor. 10.90. ( fhscc11bd001 ) cr hammer attend breakdown repl. of hammers in two opposite rows for measurement purpose any one of the following will be treated as separate unit. repl. of hammers in two opposite rows: a ) weighing of new hammers, weight balancing and shifting them to the site after internal inspection of crusher. b ) removal of broken / worn out hammers from the crusher and replacement of new hammers as per direction of area engineer or his representative. c ) shifting of old hammers to chp scrap yard. d ) any cutting / welding required will be in scope of contractor. 10.100 ( fhgzf17bd800 ) grizzly feeders ( shaft assly. ) repl replacement of g.f. shaft / replacement of crusher kick off plate replacement of g.f. shaft ( one no. of shaft ) : a ) removal of guards, universal coupling / cardoon shaft & counter weight. b ) removal of bearings and bearing housings at d.e. & nde c ) shifting of new g.f. shaft to site. d ) removal of old shaft and fixing of new shaft. e ) mounting of bearing housings on the new shaft / replacement of bearing housing if required. f ) remounting of counter weight, universal coupling and their guards. g ) greasing, trial run and defect rectification, if any. h ) shifting of old / damaged g.f. shaft to chp workshop / chp scrap yard. ‘or’ replacement of crusher kick off plate: a ) shifting of kick off plate at site from central store / site store. b ) removal of crusher top cover / side liners if required. c ) opening of kick off plate bolts and removal of frame fill piece. d ) fixing of new frame fill piece, tightening of bolts up to required torque / welding if required. e ) normalization of system. trial run and defect rectification. f ) shifting of old frame fill piece to chp scrap yard or as per direction. 10.110. ( fhvbf00bd000 ) vibro feeders ( <> ) attend defect vibro feeders attend defect / tightening of breaker plate bolt for measurement purpose any one of the following will be treated as separate unit. ( 1 ) . remove the worn out / broken tray from the position. ( 2 ) . replace the same with the new tray / repaired tray with new / same tie rod / tie rope assembly and do proper alignment. ( 3 ) any other minor work like patch work in chute and adjustment in hopper / chute to maintain the freeness of tray with chute etc as per direction of eic. 4 ) take trial after adjusting the tray. 5 ) declination angle adjustment of the as per the direction of eic. 6 ) unbalanced weight adjustment work as per the direction of eic. 7 ) replacement of vibro feeder pedestal spring ‘or’ tightening of breaker plate bolt after welding of head: a ) welding of head of one breaker plate bolt as per requirement. b ) tightness checking of bolt and locking of nuts. c ) any cutting / welding required will be in the scope of the contractor. d ) for measurement purpose tightening of bolt of one breaker plate will be treated as one unit. e ) for welding of heads of breaker plate bolts, e7018 1 electrodes will be supplied by kbunl free of cost. 10.120. ( fhscc17bd800 ) crushers ( rotor assly ) repl crushers ( rotor assly ) repl for measurement purpose any one of the following will be treated as separate unit. replacement of crusher rotor: a ) shifting of new rotor from central store / any other store to crusher floor b ) decoupling of slow speed coupling and removal of pin bush. c ) removal of crusher cover, front side housing, tramp iron tray, plumber block bolts, side liners, hood, chute etc. d ) removal of all hammers and suspension bars. e ) lifting up the rotor and placement at a safe place. f ) removal of coupling half and bearings from rotor. g ) lower the new rotor into position after mounting of bearings, plumber blocks and coupling half. box up in reverse order. h ) check and correct misalignment of slow speed side. i ) balancing of hammers & mounting ( replace full set of hammers if required ) , system normalization, trial run and defect rectification, if any. j ) shifting of old rotor to chp scrap yard. k ) replacement of defective side liners, repairing of ‘v’ shaped deflector plate and other plates if required, also to be done without any extra financial implication. l ) any cutting / welding required for this job will be in the scope of contractor. m ) for welding of heads of liner bolts, breaker plate bolts, screen plate bolts e7018 1 electrodes will be supplied by kbunl free of cost. ‘or’ replacement of g.f. deck side walls ( 01 set =02nos ) : a ) shifting of 02 no. deck side walls from kbunl stores to site. b ) dismantling of bearing housings, bypass chute, side skirt, shaft tubes, spring units, removal of damaged deck side walls after proper supporting of skirts & decks. c ) fixing of new deck side walls & re installation of all dismantled parts. d ) removal of all supports. system normalization, trial run & defect rectification, if any. e ) shifting of damaged deck side walls to chp scrap yard. f ) if only 01no ( one ) g f deck side wall is replaced, 50% payment will be made. b ) cutting / welding required for the job comes under contractor’s scope. 10.130. ( fhpcc52bd800 ) crushers ( screen plate ) repl crushers ( screen plate ) repl / breaker plate / kick off plate / replacement of crusher d.e. bearing / plumber block for measurement purpose any one of the following will be treated as separate unit. replacement of crusher screen plate / breaker plate / kick off plate : a ) shifting of screen plate / breaker plate / kick off plate at site from central store / site store. b ) removal of crusher top cover. c ) opening of screen plate / breaker plate / kick off plate bolts and removal of the same. d ) fixing of new screen plate / breaker plate / kick off plate , tightening of bolts up to required torque / welding if required. this includes fixing of site make screen plates also. e ) normalization of system. trial run and defect rectification. f ) shifting of old screen plate / breaker plate / kick off plate to scrap yard or as per direction. g ) if both upper & lower screen plates are replaced simultaneously, it will be treated as one unit. i ) all allied activity related with screen plate replacement, including cutting / welding or preparation of jig fixtures comes under contractor’s scope. ‘or’ replacement of crusher d.e. bearing / plumber block : a ) shifting of new bearing / plumber block at site. b ) decoupling of gear box from slow speed side and high speed side. c ) removal of flexible coupling half. e ) opening of shaft seal covers on both sides. f ) loosening of both side plumber block bolts and its top cover. g ) removal of top cover of crusher. h ) removal of side liners above the end discs on both sides. i ) lifting of rotor and removal of plumber block and bearing ( de ) . j ) mounting of new bearing correctly and adjusting the clearance to the specified value. k ) placement of plumber block and lowering of rotor. l ) boxing up in reverse order. m ) mounting of coupling, placement of g / b. alignment of rotor with gear box. n ) system normalization and trial run and defect rectification, if any. o ) shifting of old bearing / plumber block to chp scrap yard. p ) cutting / welding required for the job comes under contractor’s scope. q ) if bearing and plumber block are replaced simultaneously no extra payment shall be made, if will be treated as one unit. 10.140. ( fhttr00bd000 ) travelling tripper ( <> ) attend defect travelling tripper rail structure supporting beam bolts tightening / miscellaneous jobs related to travelling tripper for measurement purpose any one of the following will be treated as separate unit. travelling tripper rail structure supporting beam bolts tightening: a ) it includes tightening all bolts of travelling tripper rail supporting beam, structural member, coupling bolts of tripper. or miscellaneous jobs related to travelling tripper such as scrapper adjustment, skirt fixing, eh brakes inspection and adjustment etc. 10.150. ( fhttr22gn808 ) travelling tripper ( tripper wheel ) realignment re railment of trippers : a ) dismantling of tripper bracings / str., as required. b ) lifting of tripper by mechanical means and placing it on the tripper rails. c ) re assembling of all supporting str. as per direction and system normalization. d ) trial run and defect rectification, if any. e ) any cutting / welding required for this job will be in the contractor’s scope. 10.160. ( fhttr00oh001 ) travelling tripper ( <> ) oh overhauling of tripper hand brake / manual brake / ilms pulley bearing flange replacement / flap gate flange bearing replacement / crusher hammer pin replacement for measurement purpose any one of them will be treated as separate unit. overhauling of tripper hand brake / manual brake: a ) removal of damaged hand brake from position. b ) rectification / strengthening of fixing base plate / replacement of shoe etc. c ) refixing of hand brakes by welding / bolting. check for alignment / fouling with rails. e ) system trial run. defects rectification, if any, after trial run. ‘or’ ilms pulley bearing flange replacement ( nde ) a ) shifting of new bearing at site. b ) preparation of jig / fixtures for supporting the ilms. c ) removal of bearing / bearing flange. d ) system normalisation. trial run and defect rectification, if any. e ) if bearing flange is replaced while bearing replacement, it will be treated as one unit. f ) cutting / welding required for the job comes under contractor’s scope. ‘or’ flap gate flange bearing replacement: a ) removal of operating lever / counter weight lever. b ) shifting of new bearing at site. c ) removal of old bearing and mounting of new bearing and greasing. refitting of lever. d ) shifting of old bearing at chp scrap yard. e ) any cutting / welding work will be in the scope of the contractor. ‘or’ crusher hammer pin replacement : a ) opening of access door. opening of shaft seal / removal of pin retainer bolts. b ) shifting of new hammer pin at site, after weighing. c ) removal of damaged hammer pin and replacement with new one. replacement of the same on opposite side also. d ) crusher box up, trial run and defect rectification, if any. 10.170. ( fhttr00bd801 ) travelling tripper ( <> ) repair tripper rail joint welding. removal of old welding & welding as per requirement. welding electrode e7018 1 will be supplied by kbunl free of cost. for measurement purpose one centimeter will be treated one no. for payment purpose 01 cm will be treated as 01 no 10.180. ( fhilm56bd800 ) ilms / obms ( pulley brg ) repl ilms pulley bearing / bearing flange replacement ( de ) / flap gate actuator replacement / replacement of flap gate trunnion bracket for measurement purpose any one of them will be treated as separate unit. ilms pulley bearing / bearing flange replacement ( de ) : a ) shifting of new bearing at site. b ) preparation of jig / fixture for supporting the ilms. c ) removal of drive motor and gear box. removal of bearing / bearing flange. d ) fixing of new flanged bearing and mounting it on the pulley shaft. e ) assembling of the drive, alignment and system normalization. f ) trial run and defect rectification, if any. g ) if bearing flange is replaced while bearing replacement, it will be treated as one unit. h ) cutting / welding required for the job comes under contractor’s scope. ‘or’ flap gate actuator replacement: a ) shifting of new / repaired actuator at site. b ) removal of old actuator and fixing of new actuator. c ) shifting of old actuator to chp workshop. d ) operation checking of flap gate and defect rectification, if any. e ) overhauling of the replaced actuator. or replacement of flap gate trunnion bracket : a ) shifting of new / repaired trunnion bracket at site. b ) removal of old trunnion bracket and fixing of new trunnion bracket. c ) operation checking of flap gate and defect rectification if any d ) shifting of old trunnion bracket to chp workshop. 10.190. ( fhg / b54bd800 ) gear box ( gear replacement ) full set of gear box internals replacement: a ) it includes replacement of full set of internals of any gear box of any drive in c.h.p. b ) shifting of new / repaired gear box internal from chp store / central store / central workshop. c ) decoupling of gear box from h.s. & low speed side & shifting of motor and removal of fluid coupling, if required. d ) dismantling of gear box top cover, end covers etc and removal of its internals and removal of slow speed side coupling half. e ) mounting of coupling half / bearing on shaft and assembling of shafts in the gear box and checking for proper matching. f ) box up of gear box, placement on foundation & placement of motor, replacement of defective oil seals, if required and oil filling up to the mark. g ) system normalization after alignment. h ) if removal & mounting of fluid coupling / flexible coupling half is required, payment will be done as per sl. no. 01 i ) trial run and defect rectification, if any. j ) shifting of old gear box internals to chp workshop / central work / scrap yard. k ) any cutting / welding work will be in the scope of the contractor. 10.200. ( fhg / b51bd800 ) gear boxes ( i / p shaft ) repl replacement of gear box input shaft / shaft bearings / oil seals / complete gear box / replacement of output shaft for measurement purpose any one of them will be treated as separate unit. replacement of gear box input shaft / shaft bearings / oil seals / complete gear box: a ) replacement of input shaft / shaft bearing / oil seals of any gear box in chp comes under this. b ) shifting of shaft / shaft bearings / oil seals from central store / chp store / central store to site. c ) decoupling of input shaft from motor and shifting of motor to the required place. d ) removal of fluid coupling or brake drum / oil seals after dismantling of thruster brake, if required. e ) opening of gear box top cover etc and removal of the input shaft, oil seals, removal of bearings etc from the shaft. f ) mounting of bearings and hub on the input shaft, replacement of oil seals if required. g ) fixing of input shaft and also to be checked for proper matching with intermediate shaft. h ) box up of gear box in reverse order. i ) mounting of fluid coupling, & motor placement. j ) alignment k ) system normalization, trial run and defect rectification, if any. l ) cutting / welding required for the job comes under contractor’s scope. m ) shifting of old damaged shaft to chp scrap yard / central workshop. n ) if shaft, oil seals and bearings are replaced simultaneously, it will be counted as one unit only. or replacement of output shaft / shaft bearing / oil seals: a ) replacement of output shaft / shaft bearings / oil seals of any drive in c.h.p. comes under this. b ) shifting of new / repaired shaft / shaft bearings / oil seals at site and removal of coupling half c ) decoupling of gear box on slow speed side, removal of gear box top cover & end cover. d ) removal of output shaft / bearings / oil seals etc. e ) internal inspection & mounting of bearings and coupling half on the output shaft. f ) placement of the output shaft. g.box box up, and system normalization. replacement of defective oil seals, if required. g ) trial run and defect rectification, if any. h ) cutting / welding required for the job comes under contractor’s scope. i ) shifting of old damaged shaft / bearings to central workshop. / chp scrap yard j ) if shaft , oil seals and bearings are replaced simultaneously , it will be counted as one unit only. 10.210. ( fhg / b12bd800 ) gear boxes ( 10 50ltrs ) repl replacement of gear box oil : ( oil qty. < 50 ltrs. ) any of the following work is covered under this item. for measurement purpose any one of them will be treated as separate unit. replacement of gear box oil : ( oil qty. < 50 ltrs. ) a ) replacement of oil of any gear box comes under this having oil capacity more than 10 ltrs.. b ) shifting of oil / oil drums from chp store to the site. c ) draining of oil in a can and shifting it to chp scrap yard. d ) filling of oil in the gear box after flushing. normalisation of the system. or de coupling, coupling and alignment of ilms motor. 10.220. ( fhg / b13bd800 ) gear boxes ( 50 100 ltrs ) repl replacement of gear box oil : ( oil qty.> 50 ltrs. ) / replacement of cable reeling drum gear box for measurement purpose any one of them will be treated as separate unit. replacement of gear box oil : ( oil qty.> 50 ltrs. ) a ) replacement of oil of any gear box comes under this . b ) shifting of oil / oil drums from chp store to the site. c ) draining of oil in a can and shifting it to chp scrap yard. d ) filling of oil in the gear box after flushing. e ) normalisation of the system. ‘or’ replacement of cable reeling drum gear box : a ) replacement of crd gear box of travelling tripper comes under this .shifting of new / repaired gear box at site. b ) removal of motor after decoupling of coupling. removal of crd drum if required. c ) removal of gear box and removal of coupling half. d ) mounting of coupling half in new gear box. e ) placement of new gear box in position re assembling of motor. f ) trial run and defect rectification. 10.230. ( fhg / b00gn152 ) gear boxes ( <> ) decpl / cpl / algn alignment of lt drive ( for motor 15 kw to 200kw ) / overhauling of gear box ( below 30 kw ) / ilms gear box replacement for measurement purpose any one of them will be treated as separate unit. alignment of lt drive ( for motor 15 kw to 200kw ) : a ) if coupling pin bush replacement is required, no extra payment will be done. b ) it includes all related activity for the alignment. c ) for payment purpose, if both slow speed ( with dial gauge ) and high speed alignment is done, it will be treated as separate unit. d ) cutting / welding required for the job comes under contractor’s scope. ‘or’ overhauling of gear box ( below 30 kw ) : a ) opening of gear box. replacement of defective / worn out / damaged parts. b ) re assembling of gear box and oil filling. ‘or’ ilms gear box replacement: a ) shifting of new / repaired gear box at site. b ) decoupling and removal of motor. decoupling and removal of gear box. c ) mounting of new gear box, re assembling of motor and alignment. d ) coupling of motor, trial run and defect rectification, if any. e ) shifting of old gear box at chp / central workshop. 10.240. ( fhttr14bd800 ) travelling tripper ( lt gearbox ) repl replacement of travelling tripper travel drive gear box / alignment of ht drive ( for motor above 200 kw ) for measurement purpose any one of them will be treated as separate unit. replacement of travelling tripper travel drive gear box : a ) shifting of new / repaired gear box at site. b ) dismantling of old gear box / motor and fixing of new gear box & motor. c ) dismantling of thruster brake & refixing. d ) alignment of the drive and oil top up in new gear box after flushing. e ) normalization of the system and trial run to be taken. defect rectification, if any. f ) shifting of all materials to chp store / chp scrap yard. g ) cutting / welding required for the job comes under contractor’s scope. ‘or’ alignment of ht drive ( for motor above 200 kw ) : a ) if coupling pin bush replacement is required, no extra payment will be done. b ) it includes all related activity for the alignment ( slow speed or high speed ) . c ) for payment purpose, if both slow speed ( with dial gauge ) and high speed alignment is done, it will be treated as separate unit. d ) cutting / welding required for the job comes under contractor’s scope. 10.250. ( fhg / b00bd000 ) gear boxes ( <> ) attend defect gear box gauge glass replacement / replacement of sump pump spider of love joy coupling for measurement purpose any one of the following will be treated as separate unit. a ) gear box gauge glass replacement: b ) shifting of new / repaired gauge glass at site. c ) removal of old gauge glass after isolation and mounting of new one. d ) oil leakage job of gear box ‘ or ‘ replacement of sump pump spider of love joy coupling : a ) no payment will be made for spider of love joy coupling replacement if it is done while pump overhauling. 10.260. ( fhmat14gn863 ) matl ( misc ) shifting transportation of materials: a ) it includes transportation of any kind of material from central store or any other place inside plant to chp store or vice versa, as per direction. b ) for measurement purpose materials upto 50kg or part there off will be taken as one unit. 10.270. chp em bkdn mtc st 1 ( fhmat11gn162 ) matl ( scrap ) disposal transportation of misc. scrap: a ) it covers transportation of misc. scrap from chp area to other place inside the plant as per direction. b ) for measurement purpose transportation of one ton scrap will be taken as one unit. all arrangement for loading, unloading and transportation including supply of tractor is in contractor’s scope. 10.280. ( fhmsw00gn250 ) fabrication erection ( <> ) lighter section miscellaneous steel fabrication work in c.h.p. ( lighter section ) : a ) fabrication of ladder , platform and other miscellaneous work in chp and mgr area ( from wagon tippler to bunker floor and mgr gates ) at different elevations and different location comes under this . b ) transportation of steel from kbunl stores to work site . c ) fabrication work is to be done as per given drawing or as per direction of area engineer and placement of the same at the required place or as per direction. d ) new fabricated work is to be painted with one coat of primer paint of kbunl approved brand. paint to be provided by the contractor. e ) payment will be done on per ton basis. f ) it will be applicable for steel sheets upto 3.15mm. g ) removal of old plate / structure from location and shifting to chp scrap yard will be in the scope of the contractor. 10.290. ( fhcht00bd801 ) chutes ( <> ) repair coal leakage arresting by patch work : a ) arresting of coal dust leakage from any chute / duct in chp comes under this. b ) leakage arresting includes fabrication of required patch from ms plate ( up to 20mm thick ) and welding of the same at required place or as per direction of area engineer. c ) trial run for leakage arresting if any. d ) for measurement purpose payment will be made on per unit basis and 300 mm*300 mm will be treated as one number. 10.300. ( fhcht00gn250 ) ( fabrication +erection ) miscellaneous steel fabrication work in c.h.p. ( heavy section ) .: a ) fabrication of ladder, platform and other miscellaneous work in chp and mgr area ( from track hopper to bunker floor and mgr gates ) at different elevations and different location comes under this . b ) transportation of steel from kbunl stores to work site . c ) fabrication work is to be done as per given drawing or as per direction of area engineer and placement of the same at the required place or as per direction. d ) new fabricated work is to be painted with one coat of primer paint of kbunl approved brand. paint to be provided by the contractor. e ) payment will be done on per ton basis. f ) removal of old plate / structure from location and shifting to chp scrap yard will be in the scope of contractor. 10.310. ( fhdep00gn602 ) deptt <> man.dep sw manpower supply sw manpower supply for other miscellaneous work ( as per direction of engr in charge ) . necessary t&ps required for supply job will be provided by contractor ( as per t&ps list ) . sw ( fitter / rigger / welder ) 10.320. ( fhdep00gn600 ) deptt <> man.dep usw manpower supply usw manpower supply for other miscellaneous work ( as per direction of engr in charge ) . necessary t&ps required for supply job will be provided by contractor ( as per t&ps list ) usw ( helper ) 10.330. ( fhscc13gn250 ) crushers ( bkr plate ) fabrication crushers ( bkr plate ) fabrication / deck plate fabrication of vs assembly making breaker plate for crusher ( one full set consisting of four piece small / 02pc big size ) a ) marking of breaker plate as per drawing and instruction of area engineer. b ) cutting of breaker plate. c ) transportation of breaker plates from chp steel yard to central workshop for drilling. d ) transportation of breaker plates from central workshop to chp crusher house / store area after drilling. drilling of holes will not be in the scope of the agency. payment will be made as ( 04 nos = 01 unit ) or a ) fabrication of deck plates of vibrating screen 10.340. conv pulleys ( <> ) brg inspection: fhcnp00bd799 conv. pulley ( <> ) brg inspection bearing inspection for conveyor pulley / crusher / bearings of wheels of mobile equipment’s stacker , travelling tripper bearing inspection a ) inspection of bearings ( both end ) of any conveyor pulley in chp. b ) supply of all t&ps and manpower will be in the scope of the agency. c ) all related jobs for bearing inspection will be in the scope of the agency. d ) greasing of bearings after inspection to be done by the agency. 10.350. ( fhbcn02pm002 ) belt conveyor 02 w checks belt conveyor 02 w checks 1. any conveyor in chp is covered under this item. 2. check all idlers for free rotation. 3. replace defective idlers / idlers frame / guide rollers, 4. adjust / replace the skirt rubber, scrapper rubber & dust curtains. 5. check the belts for any sway, train as required. 6. check the thruster oil level, top up if required .adjust the thruster brake. 7. check the gear box & fluid coupling oil level / leakage, top up if required. clean the gear box breather. 8. check the belt joints for any ply separation, check the belt for any damage, cut mark etc.& report. 9. check pulley bearing for overheating, noise etc. check the temp. of gear box. check oil pressure if gauge is provided. 10. check that take up travel is free; there is no deformation in its guide. 11. tighten all foundation bolts of motor, gear box, pulley, plumber block etc. 12. any cutting / welding / tacking of idler with frame is in the scope of contractor. 10.360. ( fhbcn02pm004 ) belt conveyor 04 w checks belt conveyor 04 w checks 1. any conveyor in chp is covered under this item. 2. repeat items 2, 3, 4, 5, 6, 7, 8, 11&12 of job sl.no. – 35 3. check tightness of fan bolts & foundation bolts of drive & pulley. 4. check for any leakage from the seals of gear box fluid coupling and report. 5. check the play in pin & bush coupling and report if bushes are damaged. 6. inspect pulley lagging for wear / damage & report. 7. check the pulley for any crack; tighten the locking assembly bolts by torque wrench unto adequate torque. 8. check that there is no deformation in take up guide. 10.370. ( fhbcn02pm012 ) : belt conveyor 12 w checks belt conveyor 12 w checks 1. any conveyor in chp is covered under this item. 2. repeat all items of sl. no. –36. 3. check oil level of fluid coupling, top up if required. 4. grease pulley bearings & gear coupling & take up guides. 5. check proper functioning of thruster brakes adjust, if required. 10.380. ( fhilm00pm002 ) : ilms 02 w checks ilms 02 w checks 1. any in line magnetic separator in chp is covered under this item. 2. inspect belt for any damage. check belt sway / belt tension, adjust, if required. 3. check gear box oil level, top up, if required. check tightness all foundation bolts. 4. adjust / replace the skirt rubber. 10.390. ( fhilm00pm004 ) ilms 04 w checks ilms 04 w checks 1. any in line magnetic separator in chp is covered under this item. 2. repeat all items of job sl.no. – 38 3. grease all bearings of plumber blocks. grease the screw take up. 10.400. ( fhgzf00pm002 ) : grizzly feeder 02 w checks grizzly feeder 02 w checks 1. any grizzly feeder in crusher house is covered under this item. 2. check tightness of the foundation bolts of motor, grizzly feeder bearing housing, seal cover and any other. 3. ch. tightness tray fixing bolts, chute fixing bolts, counter weight, fixing bolts. 4. check coal leakage from gf, adjust / replace rubber dust seals. 5. clean the deck and check the welding . 6. check welding of liners. 7. check the condition of spring & reports. 8. clean the bypass chute. inspect the deck sidewalls for any crack & report. 9. any cutting / welding required is in the scope of contractor. 10.410. ( fhgzf00pm004 ) : grizzly feeder 04 w checks grizzly feeder 04 w checks 1. any grizzly feeder in crusher house is covered under this item. 2. repeat all items of job sl.no. – 40 3. grease all bearings. check condition of universal joints & propeller shaft. 10.420. ( fhpcc00pm002 ) : crushers ( <> ) 02w chks crushers 02w chks 1. any crusher in crusher house is covered under this item. 2. check the condition of hammers and report. 3. ch. gear box oil levels, top up, if required. clean the air breather / replace the gauge glass if required. remove foreign materials from tramp iron box. 4. check for any coal leakage from manholes, inspection holes etc. & arrest the leakage. 5. check tightness of all cage fixing bolts, housing bolts etc. 6. check breaker plate, shaft disc key , screen plate, frame fill piece, v shaped deflector plate, screen plate arm, liners, screw jack ( cage adjuster ) , screen clamp bar for wear and report. check the tightness of bolts and weld the bolts, if required. 7. check tightness of all bolts & nuts of gear box fan, plumber blocks & foundation bolts. 8. clean the pressure equaliser line. 9. any cutting / welding required is in the scope of contractor. 10.430. ( fhpcc00pm004 ) : crushers ( <> ) 04w chks crushers 04w chks 1. any crusher in crusher house is covered under this item. 2. repeat all items of job sl.no. – 42 3. grease nde & de bearing of crusher, cage adjusting device. 4. check fluid coupling oil level, top up, if required. ( to be done after three months ) 5. inspect breaker plate holding plate and report. 10.440 ) . ( fhttr00pm002 ) : traveling tripper 02 w checks traveling tripper 02 w checks 1. any traveling tripper in chp is covered under this item. 2. check all idlers of the tripper for free rotation / abnormal noise. 3. replace the defective idlers / idler frames. place fallen idlers. 4. check oil level / oil leakage of travel drive gear box, crd gear box and thruster, top up, if required. check / adjust tightness of thrustor brake shoe. 5. check and adjust tripper hand brake / rail cleaner. 6. check tightness of all foundation bolts of motor, gear pulley etc 7. check flap gate actuator is operating freely & closing properly. 10.450 ) . ( fhttr00pm004 ) : traveling tripper 04 w checks traveling tripper 04 w checks 1. any traveling tripper in chp is covered under this item. 2. repeat items 3, 4, 5 , 6 & 7 of job sl.no. – 44 3. check gear box air breather for clogging, clean, if required. 4. check pin bush for coupling and report for replacement, if required. 5. check tripper rail welding joints. check tightness of rail supporting structure bolts at joint, if welding is broken. 10.460 ) . ( fhs / r00pm002 ) : stacker 02 w checks stacker 02 w checks a ) boom conveyor: 1. check all idlers for free rotation, replace defective idlers / idler frame. 2. check / adjust / replace skirt rubber, scrapper rubber, dust curtains. 3. check the belt for any sway, train, if required. 4. check the oil level, top up if required. clean the air breather. 5. check free movement of thrusters, clean dust etc. from moving zone. b ) intermediate conveyor : 1. check all idlers for free rotation, replace defective idlers. 2. check / adjust / replace skirt rubber, scrapper rubber, dust curtains. 3. check the belt for any sway, train, if required. 4. check the oil level, top up if required. clean the air breather. 5. check free movement of thrusters, clean dust etc. from moving zone. c ) pcrd / ccrd 1. check proper functioning of pcrd / ccrd, rectify if required. 2. check tightness of chain, sprocket, and foundation bolts etc. 3. check oil level of angle gear box, top up, if required. 10.470 ) . ( fhs / r00pm004 ) stacker 04 w checks stacker 04 w checks a ) boom conveyor : 1. check and adjust / replace the rubber strip of scrappers / skirt rubber. 2. check the oil level of gear box, top up, if required. clean the air breather, if required. 3. check for any leakage from the seals of gear box, fluid coupling. 4. check the play in pin bush coupling, report for replacement, if required. 5. inspect pulley lagging for wear / damage. 6. tighten all foundation bolts of motor, gear box, pulley. 7. check the screw take up travel is free and there is no deformation in its guides. check the belt tension, tighten, if required. 8. check functioning of thrusters / thrustor brakes, rectify as required. b ) intermediate conveyor : 1. check and adjust / replace the rubber strip of scrapper / skirt rubber. 2. check oil level of gear box, top up, if required. clean the air breather. 3. check for any leakage from the gear box, fluid coupling. 4. check the play in pin push coupling, report for replacement, if required. 5. check pulley lagging for wear / damage. 6. tighten all foundation bolts of motor, gear box, pulley. 7. check that screw take up guide travel is free and there is no deformation in its guide. check belt tension, tighten, if required. 8. check functioning of thrustors / thrustor brakes, rectify as required. c ) pcrd / ccrd 1. check the freeness of cable rollers. 2. check & adjust cable and cable guide. 3. check the angle gear box oil level, top up, if required. 4. check tightness of foundation bolts, chain, sprocket etc. 5. grease all plumber block bearings. 6. check tightness of chain, sprocket and foundation bolts etc. 10.480 ) . ( fhfpg00pm004 ) flap gate 04 w checks flap gate 04 w checks 1. any flap gate in chp is covered under this item. 2. check oil level in the actuator gear box, top up, if required. 3. grease both side bearing of flap gate and actuator. 4. check actuator is operating freely & closing properly both sides. 5. check tightness of foundation bolts. 6. check for any wear of the flap gate surface & report. 7.check for any possible coal passing through flap gate. 8. any cutting / welding required is in the scope of contractor. 10.490 ) . ( fhrpg00pm004 ) rake & pinion gate 04 w checks rake & pinion gate 04 w checks 1. any rake & pinion gate in crusher house is covered under this item. 2. oil top up in the rpg’s both gear boxes, if required. 3. check freeness of chain sprocket wheel. 4. greasing of all the bearings. 5. check tightness of all the foundation bolts. 6. check rack & pinion gate assembly for freeness. 10.500 ) . ( fhpit03pm004 ) sump pumps 04 w checks sump pumps 04 w checks 1. for measurement purpose one pump of t / h sump pumps / lwtp vertical pump will be taken as one unit. 2. greasing of pumps bearings. 3. check the rubber spider of the coupling, replace, if required. 4. check the play in pump motor coupling, adjust, if required. 5. check tightness of foundation bolts. 6. check leakage from pipe joints & valve gland. 7. check freeness of nr valve and gate valve. 10.510 ) . ( fhdes00pm004 ) : de / ds system 04 w chks. de / ds system 04 w chks / water line checking / general checking and defect rectification of ventilation system / general checking of de system any of the following work is covered under this item. for measurement purpose any one of the following will be treated as separate unit. general checking and defect rectification of dust suppression system in tps, stacker, crusher house & wagon tippler area . pump: a ) greasing all bearings of the pump. b ) replacement / tighten the gland packing of the pump as required. c ) check any water leakage and report. check pin bush coupling condition, replace if required. d ) check tightening of all foundation bolt. or water line checking: a ) clean the pump suction strainer ( pot strainer ) & y strainer. b ) attend water leakage if any , including from hose pipe. c ) check the spray nozzle condition and report. or general checking and defect rectification of ventilation system. a ) greasing of all bearings. b ) check v belt condition, replacement and alignment if requiared. c ) check tightness of all foundation bolt. d ) rotate the fan impeller by hand and report if any abnormality is observed. e ) check the stud nut tightness of impeller. or general checking of de system. a ) greasing of all bearings. check v belt condition, replacement and alignment if required. b ) check tightness of all foundation bolt. c ) rotate the fan impeller by hand and report if any abnormality is observed. d ) check the stud nut tightness of impeller. e ) cleaning of rotary lock feeder unit and its discharge pipe. 10.520 ) . ( fhmsl01bd800 ) — de / ds / service water line & fire line defect attend replacement of pipe line , replacement of gate valve / nrv / laying of pipe line replacement of pipe line , replacement of gate valve / nrv a ) ds / de / service water line in chp / fire water b ) shifting of new pipe line at site and replacement of old pipe line. c ) any cutting welding required for the job comes under this. d ) while replacement necessary flange, gasket, fittings are also to be changed, if required. e ) shifting of old pipe line to chp scrap yard. trial run and defect rectification. f ) for measurement purpose a segment of 01 mtr length or part there of will be treated as one unit for pipe line up to 65 nb . g ) for measurement purpose a segment of 01 mtr length or part there of will be treated as 1.2 unit for pipe line 80 nb and above . or laying of pipe line a ) it covers laying of pipe line ( with fittings ) in ds / de / service water line in chp / fire water. b ) shifting of new pipe line at site. c ) while laying of pipe line necessary flange, gasket, fittings are also to be provided, if required. any cutting welding required for the job comes under this. e ) trial run and defect rectification. g ) application of 2 coats of red oxide primer paint on the pipe, red oxide primer paint is in the partys scope. h ) for measurement purpose a segment of 2mtr length or part there of will be treated as one unit for pipe up to 65nb. i ) for measurement purpose a segment of 2 mtr length or part there of will be treated as 1.15 unit. for pipe 80nb and above. 10.530 ) . ( fhlpp01bd000 ) ds pump gland packing rep. or adj. / ds pump coupling pin bush rep. / ds / de pump / fan bearing greasing / servicing of solenoid valves in ds line ‘or‘ replacement of v bells ( full set ) / rep.of vent. fan air filter / dust suppression system nozzles nipple fixing / cleaning of spray nozzles in dust suppression system any of the following work is covered under this item. for measurement purpose any one of the following will be treated as separate unit. ds pump gland packing replacement / adjustment: a ) replacement / adjustment of the gland packing of the pump for arresting water leakage. ( one side or both side as required ) . trial run and adjustment of the glands. or ds pump coupling pin bush replacement : replacement of full set of pin bush will be taken as one unit. or cleaning of y strainer in ds line : removal of the y strainers from the system, cleaning it upto the satisfaction and re fitting at original position. or servicing of valves in ds line: a ) dismantling of solenoid v / v, replacement / repairing of defective parts and reassembling. or replacement of v bells ( full set ) : a ) removal of fan belt guard. removal of damaged v belts. shifting of new v belts and fixing on the v pulley. alignment of the pulleys. trial run and defect rectification. or replacement of ventilation fan air filter ( 01 no = 01 unit ) : a ) removal of air filter from system. b ) shifting of new / repaired air filter and installation. c ) drying of the filter and fixing back to its original location. d ) rectification of minor repair is for the filters if required, or greasing of fan / pump bearings ( both bearing ) or dust suppression system nozzles nipple fixing a ) nipple to be fabricated from ½ inch, medium duty pipe, length of nipple will be 3 to 4 inches. b ) removal of damaged nipple & fixing of new . c ) fixing of spray nozzle on the nipple. or cleaning of spray nozzles in dust suppression system : a ) removal of spray nozzles from the dust suppression system. dismantling of nozzles , cleaning and re fixing it at original position. b ) for payment purpose 05 nos. of nozzles or part thereof will be treated as one unit. 10.540 ) . ( fhdes01bd800 ) replacement of fire sprinklers / replacement of fire hydrant valve / repairing of fire hydrant valve any of the following work is covered under this item. for measurement purpose any one of the following will be treated as separate unit. replacement of fire sprinklers : a ) isolation of the sprinkler line from water side if required. removal of damaged sprinkler and fixing of new one. charging of the line with water and leakage arresting if any. or replacement of fire hydrant valve: a ) replacement of any fire hydrant valve in chp is covered under this. b ) shifting of new / repaired fire hydrant valve to site and replacement of the defective valve. c ) shifting of damaged fire hydrant valve to chp workshop. or repairing of fire hydrant valve: a ) dismantling of fire hydrant valve, replacement of defective parts and re assembling. b ) spares will be provided by kbunl free of cost. however, for rubber washer, it is to be cut from rubber sheet, supplied. 10.550 ) . ( fhmsl01bd000 ) water leakage arresting from pipe line / flange ( above ground ) leakage arresting includes welding / gasket replacement / pipe fitting replacement, if any. 10.560 ) . ( fhmsl01bd801 ) / ms piping ( dia<=6 ) repair water leakage arresting from pipe line / flange ( under ground ) a ) leakage arresting includes welding / gasket replacement / pipe fitting replacement, if any. b ) dewatering of the pit, if required. dewatering pump will be provided by kbunl free of cost, if available. c ) proper cleaning of pipe surface for welding at leakage area & leakage arresting through patch work or as per direction of area engr. d ) if more than one leakage is found in one digging, it will be treated as one unit. e ) underground pipes are at 1.5m depth ( approx. ) . f ) application of wrapping & coating on pipes / patches etc. all materials in the partys scope. . 10.570 ) . ( fhdep00gn624 ) ( deptt <> manpower gang ( adl ) ) maintenance jobs per shift ( shift maintenance ) : 1. contractor has to deploy 02 ( 1 welder + 1 fitter ) , and 2 helper and one rigger for chp mechanical maintenance in shift as and when asked by eic. 2. they will be deployed for emergent type of job which are mentioned below: 3.oil topping up in gear box / fluid coupling 4. removal & fixing of coupling guards 5. opening & closing of front & back doors of crushers. 6. assistance in changing of flap gate during path selection. 7. v belt replacement if required 8. adjustment / replacement of skirt rubber 9. belt scrapper replacement / adjustment 10. patching of chute puncture 11. belt training if required 12. removal / replacement of idlers if required 13. any job assigned by eic. 10.580 ) . misc. maint. work ( code: fhmsw00bd000 ) misc. maint. work defect liability period: 01 month. a ) .cat a ( completion period 04 hrs. ) 01. belt weight, counter weight adjustment 02 key preparing / key way repair 03 hydraulic jack repair. 04 canopy cover making & fixing. 05 back plate removal & fixing. 06 inspection door removal & fixing. 07. hold back removal & fixing. 08. wiper replacement & fixing. 09. pcrd / ccrd guide roller repair replacement ( per roller ) . 10. chute chocking removal. 11. limit switch / striker fixing / sr striker fixing . 12. oil topping / oil replacement ( 01 to 50 liters ) 13. removal of hold back engagement bolt ( per conveyor ) 14. cutting set / welding m / c. shifting / material shifting 15. breather plug and gauge glass cleaning / fixing ( per gearbox ) . 16. walk way step repair & fixing 17. hs coupling bolt and bush replacement ( per coupling ) . 18. fcu oil adjustment ( per fcu ) . 19. suspension bar locking per bar. 20. coupling bolt locking through welding per bolt ( ls ) . 21. inspection cover fixing. ( per chute ) 22. crusher door sealing per crusher. 23. bearing checking / greasing ( per bearing ) . 24. r.p.g opening and closing. 25. fixing / removal of zss. 26. coupling & decoupling of equipment’s. 27. pcrd / ccrd cable positioning. 28. rail fish plate bolt replacement. 29. take up wire rope greasing / lubricating compound. 30. flap gate actuator arm pin removal & fixing. 31. hose / pipe clamp fixing 32. bolt fixing in chute bolt hole. 33. belt training / belt swaying to be aligned. 34. o ring rubber chord to be provided in input / output shaft of gear box. 35. vs ‘v’ belt set replacement & alignment. 36. fastening of belt by belt fastener ( 02 fastener for 1no.cat a ) 37. vs upper deck and lower deck repairing 38. misc. belt related jobs 10.590 ) . misc. maint. work ( code: fhmsw00bd001 ) misc. maint. work defect liability period: 01 month. a ) .cat b ( completion period 06 hrs. ) 01. gear box / conveyor ls coupling bolt removal & fixing 02. winch m / c shifting & welding at location. 03. sealing belt tensioning ( per conveyor ) / bunker sealing ( per unit ) 04. hold back replacement. 05. l.s. coupling bolt replacement ( per bolt ) 06. crusher cooler servicing. 07. chute flange joint leakage sealing / arresting by welding. 08. inspection cover replacement. 09. crusher rotor locknut tightening. / cr. bearing lock nut tightening. ( per crusher ) 10. v.s. hinge bush block replacement. 11. tripper / sr crack & broken wheel repairing. 12 fcu multi disc replacement. 13. foreign material removal. 14. r.p.g gear box replacement. 15. elect. brake shoe / manual brake adjustment / repairing. 16. gear box inspection cover removal for internal inspection 17.welding of rail / conveyor short support / stringer post / ladder repair. 18. grill repairing. 19. fg shaft bolt replacement. 20. repair of rail crack by welding. 21. shaft repairing ( welding / grinding ) . 22. chute block switch positioning and repairing. 23. pcrd / ccrd hanger repairing of sr / mt etc. 24. motor / gear / tail pulley / head pulley etc canopy or guard / cover preparing & fixing 25. key way making. 26. key making for coupling. 10.600. code: fhwgt00pm002 02 weekly checks of wagon tippler ( completion period 08 hours ) a. checking / repairing of ls & hs coupling bolts. b. checking / repairing of gear box oil level. c. checking / repairing of structures ( ballast container , way bridge, rail table, etc. ) d. checking / repairing of pinions. e. checking / repairing of connecting shafts. f. checking / repairing of power lever. g. checking / repairing of spill plates &rollers. h. checking / repairing of civil foundations. i. checking / repairing of all plummer blocks. j. checking / repairing of bull gears. k. checking / repairing of splice joints of structures. l. checking / repairing of otls switch etc. m. checking / repairing / installation of brake shoes. n. greasing of bearings by grease gun. o. checking & repairing of load shell & weigh bridge. p. spill plate roller & bracket checking / repairing. 10.610 ) code: fhwgt00pm004 04 weekly checks of wagon tippler ( completion period 10 hours ) a. checking / repairing / replacement of ls & hs coupling bolts. b. checking / repairing of gear box oil level. c. checking / repairing of structures ( ballast container , way bridge, rail table, etc. ) d. checking / repairing of pinions. e. checking / repairing of connecting shafts. f. checking / repairing of pall lever. g. checking / repairing of spill plates &rollers. h. checking / repairing of civil foundations. i. checking / repairing of all plummer blocks. j. checking / repairing of bull gears. k. checking / repairing of splice joints of structures. l. checking / repairing of otls, cam switch etc. m. checking / repairing of brake shoes. n. greasing of bearings by grease gun. o. providing of servo coat 140 on pinion & bull gear. p. all points of 02 weekly checks. 10.620 ) code: fhwgt00pm012 12 weekly checks of wagon tippler ( completion period 10 hours ) a. checking / repairing / replacement of ls & hs coupling bolts. b. checking of gear box oil condition / replacement if required. c. checking / repairing / replacement ( partly ) if required. ( ballast container , way bridge, rail table, etc. ) d. checking of bearing clearances of pinions & replacement if required. e. checking / repairing / alignment of connecting shafts. f. checking / repairing / adjustment of pawl lever. g. checking / repairing / replacement of spill plates & rollers. h. checking / repairing of civil foundations. i. checking / repairing of all plumber blocks. j. checking / repairing / replacement of bull gears ( partially ) if required. k. checking / repairing of splice joints of structures. l. checking / repairing of otls, cam switch etc. m. checking / repairing of brake shoes. n. greasing of bearings by grease gun. o. all points of 02 weekly & 04 weekly checks. 10.630 ) . code: fhwgt00gn402 inspection of wagon tippler / calibration ( completion period 04 hours ) a. checking of ls & hs coupling bolts. b. checking of gear box oil level. c. checking of structures ( ballast container , way bridge rail table, etc. ) d. checking of pinions. e. checking of connecting shafts. f. checking of pawl lever. g. checking of spill plates & rollers. h. checking of civil foundations. i. checking of all plummer blocks. j. checking of bull gears. k. checking of splice joints of structures. l. checking of otls, cam switch etc. m. checking of brake shoes. n. checking of top stop clamps and side supports & rubber o. checking of photo sensor for operation. p. weigh bridge & load shell checking 10.640 . ( fhscc00gn402 ) crushers / vibrating screen ( <> ) inspection ( a ) . remove top cover of the secondary crusher to facilitate internal inspection & cleaning. ( b ) . replace missing / loose / broken fasteners of the breaker plate / cage screen / kick off plate / tramp iron tray / end disc liner etc. ( c ) . refix the same after work is over. or ( a ) .check the condition of support springs and do the necessary adjustment / replacement. ( b ) . check and rectify the defect in the tray and its structural members. ( c ) . check receiving and discharge chute liners and report. rectify minor repair in the coffin box. ( d ) . replace the worn out skirt rubber / dust curtain. ( e ) . any other minor work has to be carried out as per direction of eic. 10.650 fheoh00oh000 ( elec hoists ( <> ) serv ) a ) . placing the hoist at suitable position for maintenance and arrange proper approach for maintenance ( b ) . opening the housing drum cover of hoist. ( c ) . checking of gears / gear box internals. repair / replace as required. clean and grease all the gears ( d ) . checking, cleaning & lubricating the bearings. replace the bearings, if reqd. ( e ) . checking the rope drum & repair / replace the parts as required. lubricate the parts needing lubrication. ( f ) . checking the rope for any defect and broken strands, replace the rope if required. clean, lubricate the rope. ( g ) . checking the load hook block assembly. clean & grease the parts. attend the defect. also check the hook for any cracks / deformation. ( h ) . cleaning and greasing guide ring and retaining ring to ensure rotation / reeling. ( i ) . checking of all the bolts, nuts and tension bar ensuring proper tightness and good condition. ( j ) . check the travel wheel and its mechanism and repair / replace as required. ( k ) . take trial of hoist on both the ends. ensure proper mechanical stopper. also check the hoist operation by lowering / raising as per limit. ( l ) . ensure proper braking of hoist on no load as well on load both. ( m ) . checking of hoist for any other defect and rectify the same. 10.660 ( fhsai00gn869 ) self algn idlr ( <> ) servicing ( servicing of trainer idler / repair of carrying / return / impact idlers ) completion time 02 hours. defect liability period 03 months. for payment purpose repair of one idler or one self adjustable frame will be considered as one unit. ( i ) servicing of trainer idler ( a ) removal of self aligning troughing trainer & return side trainer complete assembly from its position. ( b ) over haul the pivot bearing & bush by cleaning the old grease with solvent / cleaning agent, and then regrease the bush / bearing. if required, replace the bearing. ( c ) separate cloth to be used for removing the old grease, and wiping off the solvent from the bearing to avoid contamination. ( d ) optimum grease to be used such that the pivot bush / bearing is properly lubricated. grease shall not be wasted by overfilling in the housing. ( e ) re fix the complete frame back in its position, and properly tighten the bolts. if the bolts are damaged, or missing, then new bolts are to be fixed so that the frame is properly secured. ( f ) grease, bush / bearing & fasteners shall be provided by ntpc. rest all the materials & tools for cleaning to be provided by the contractor. ( g ) after complete servicing of the self adjusting idlers, clean the deposited coal on the surface of remaining rollers by soft hammering and poking. ( h ) if required, rollers are to be removed from the frames for cleaning, coal to be cleaned from the frame slots, and near bearing housing & then fixed back. ( i ) if required, also check the rollers of the assembly for their freeness, and if jammed or damaged, rollers shall be replaced. payment for roller replacement shall be made separately. ( ii ) repair of carrying / return / impact idlers ( a ) . shift damaged rollers from site or wherever dumped to work location. ( b ) . dismantle roller internals like seals, bearings, and shaft etc. ( c ) . clean roller internal properly. ( d ) . select roller shells in good condition. ( e ) . repair damaged shaft by cutting / welding / grinding. ( f ) . assembly of roller with new / good condition bearings, seals, bushes and circlips and check freeness. ( g ) . apply one coat of red oxide primer over the roller surface and put serial number on the same. total quantity :...

Hindustan Petroleum Corporation Limited - Bihar

43237621 bids are invited for custom bid for services assistance in office work mail and courier services , custom bid for services assistance in operation , custom bid for services assistance in ethanol handling services , custom bid for services assistance in ldo and bitumen handling services , custom bid for services assistance in ms hsd tank farm operation , custom bid for services assistance in gantry operations , custom bid for services assistance in tlf pump house operations , custom bid for services assistance in tt calibration operations , custom bid for services assistance in maintenance operations , custom bid for services assistance in fire pump house operations , custom bid for services assistance in ethanol ph tank farm operations , custom bid for services assistance in sampling and quality assurances , custom bid for services assistance in locking and sealing services , custom bid for services assistance in twd ph operation , custom bid for services housekeeping and gardening services , custom bid for services lubricant loading and unloading services , custom bid for services grass cutting services , custom bid for services tractor hiring services , custom bid for services hydra and jcb hiring services , custom bid for services depot emergency vehicle driver services , custom bid for services delivering monthly samples to hpcl barauni lab , custom bid for services tea coffee lemon tea green tea supply total quantity :...

Prisons and Correctional Services Department - Bihar

43092480 selection of agency for supply of raw materials for printing press industries in various jails 1 paper 43cm x 69 cm 2 paper 46cm x 58.5 cm 3 ruling paper 41cm x 64 cm 4 paper 50cm x 75 cm 5 paper 58.5 cm x 91 cm 6 flyleaf board plastic coted 71cm x 56 cm ( yellow, red, green, khakhi, orange, blue, white, sky blue, gray, pink ) 7 flyleaf board simple 71cm x 56 cm ( yellow, red, green, khakhi, orange, blue, white, sky blue, gray, pink ) 8 ledger paper 43 cm x 69 cm 70 gsm 9 colored paper ( yellow / red / blue / green ) 46cm x 58.5 cm 10 cardboard paper 11 laser tracing paper a4 12 laser tracing paper a3 ( legal ) 13 royal blue ink 14 magenta ink 15 black ink ( offset press machine ) 16 red ink ( offset press machine ) 17 yellow ink ( offset press machine ) 18 green ink ( offset press machine ) 19 blue ink ( offset press machine ) 20 natural gum arabic solution for ps plates 21 ink tack reducer 22 fountain solution concentrate 23 copper sulphate commercial grade 24 silicon grease 25 image remover fluid for ps plate 26 plate cleaner 27 press wash 28 density booster 29 powder developer concentrate for analog positive plates 30 engine lubricant oil ( mobil ) 31 uv ctp + ve plate ( analog positive plates ) long run 32 viscose sponge 33 stulen sheet ( fine ) 34 dumping cloth for offset machine roller size 200 35 dumping socks 36 stiching steel wire 20 nos. 37 4 ply blanket 38 under blanket 39 rubber shocker for offset machine 40 synthetic adhesive 41 book binder sewing needle 42 nylon thread for register binding 43 binding cloth 44 cardboard ( pakki kut ) 45 marble paper 46 bopp transperent self adhesive tape 1 / 2 width 47 bopp transperent self adhesive tape 48 mm width 48 packing repeat for pet strap 49 cutting machine beat 50 numbering machine 51 brush card 52 repeat for flyleaf 53 plastic coated packing wrapper sheet 54 packing corrogated box for a4 bundles 55 cartoon strap 56 lamination plastic sheet roll 57 adhesive for lamination machine...

Bihar Industrial Area Development Authority - Bihar

43043456 supply, installation, testing and commissioning of different machines for setting up primary processing centre ( ppc ) at industrial area donar, darbhanga. • 3000 mt onion cold store • 2mt / hr. sorting, grading, washing and packing • material handling high stage compressor for cold store 2 cyclone type oil separator flanged connections with companion flanges and oil drain valve. 3 abb / siemensmake75hp, 4‐pole , ie2, ip55, class finsulation , ambient 50°c, imb3 mount, tefc sq.cage induction motor suitable for electric supply of 3phx415vx 50hz, ac supply with slide rails for compressor. 4 l&t / equiv make star delta starter for the above motors. 5 high stage compressor for cold store 6 cyclone type oil separator flanged connections with companion flanges and oil drain valve. 7 abb / siemensmake40hp, 4‐pole, ie2, ip55, class finsulation, ambient50°c, imb3 mount, tefc sq.cage induction motor suitable for electric supply of 3phx415vx50hz, ac supply with slide rails for compressor 8 l&t / equiv make star delta starter for the above motors. 9 ammonia receiver of size 20” dia. x 16’ long constructed withliquid inlet and outlet valves, safety valve, charging valve, drain valve, purgevalve, pressuregaugeandgaugeglasswithvalves. 10 lp receiver for cold store ammonia low pressure receiver 42”dia x 12’ long constructed with liquid inlet & outlet valves, safety valve, gauge glass with valves, pressure gauge with valve saddle supports, and pump out connection with valve. also incorporating all the nozzles and valves for easy connection with acu’s and suction ‐discharged lines 11 hermetically sealed liquid ammonia pump for ammonia recirculation with motor and accessories comprising of suction strainer, suction and discharge valves, check valve. 12 set of danfoss / manik make controls for liquid re‐circulation system comprising of: electronic float switch : 03 nos.pressure differential controller : 02 nos. differential pressure regulating valve : 01 no. liquid line solenoid valve : 01no. frost‐free gauge glass : 01no. 13 wall mounted / ceiling suspended frigid coil air cooling unit complete with ss tubes & al finned cooling coil. total gi enclosur e, drain pan, axial flow fan with motor, water defrost arrangement etc. cold store1–2 14 set of danfoss / manik make controls for coil: liquid line solenoid valve digital temp. indicator cum controller 15 ms‘c’class refrigerant pipes, pipe fittings and ammonia valves to inter connect above equipment in the system comprising of suction, discharge, liquid and oil lines as per pid and based on compact plant layout. 16 g.i ‘b’ class pipes, pipefitting and valves for condenser make up water, cylinder head cooling defrost and drain line piping as per pid and basedon assumption that condenser shall be placed at a distance have not morethan10m from the plant room 17 puf insulation for accumulators / vessel, suction line, liquid lines and wetre turn lines with fixing material bitumen / cprx compound and aluminum cladding of 26g within battery limit. 18 structural material for pipe installation and plat form piping support to befabricated and installed at site with steel channel and steel angle distance between the supports to be approx. 5 meters, with variance depend on the building condition. 19 mcc panel will be cubical type switch board with bus bar, incoming acb, indicating lamps, push buttons, switches, fuses, voltmeters, voltmeter switch, am meters, am meters switch and starter for a ) compressors motor, b ) condenser fan motor & pump, c ) cooling coil fan motor, 20 power & control cabling with cable tray for complete refrigeration plant. 21 manual gas purger with safety valve for purgingnon‐condensable gases from the system. 22 first charge of ammonia gas and lubricant compressor oil. 23 installation, testing & commissioning of the complete refrigeration plant and putting in operation. our scopeis as follows: ‐ erection of the equipment as perour layout with proper operation and alignment ‐ connecting various equipment’s with pipelines, fittings, controls and instruments ‐ painting of equipment & piping ‐ pressure testing, charging of gas and commissioning of the plant. 25 all electrical fixtures include all switches and lighting as required complete facility for cold storage and packhouse. 26 dock leveller of platform with hinged lip made of profile and anti slip steel. pairs of superbumpers with heavy steel support. hydraulicpower pack suitable for p load of 40 tones asdefined by en 1398. 27 stacking arrangement a lot of ms material for ms structure for floor loading in each room made from ms square pipes, ms ‘i’ beam, ms ‘c’ channel, ms angle, ms plate and other ms material b lot of labor job for ms structure for floor loading in each room made from ms square pipes, ms ‘i’ beam, ms ‘c’ channel, ms angle, ms plate and other ms material which is fabricated at site will all consumables like electric rod and gas with labor job for painting. all ms material, redoxide and color which is required will be supplied by vendor c wooden batten required for wooden flooring with accessories like strip and nails including installation. d wooden planks required for staircase inside the cold room with fixing material e color and primer material for steel structure 1.0 supply of puf insulated composite wall and ceiling panels 1.1 100 mm thick puf panel for wall and ceiling in cold store 2.0 hinged door of size 1200 mm x 2100 mm x 80 mm thick 3.0 floor insulation with puf sheets in single layer. puf density will be 40 ± 2 kg / cum withvapour barrier i.e., tar‐felt, bitumen and polythene sheets 3.1 100 mm thick 4.0 panel fixing accessories comprising: 4.1 sealant, pop rivets and flashings, puf chemicals, aluminum tee only. 4.2 pvc strip curtains for doors 5.0 installation 5.1 installation of panels 5.2 installation of floor insulation 5.3 installation of hinged door sorting, grading, washing and packing bulk hopper , soil remover , water dumping tank , drum washer , by pass conveyor length : 3500 4000 mm width : 900 mm , polisher , feed elevator , drying section, sorting table , screen sizer with collection belt , oversize collection belt, single head weigher & bagger , electric control panel ( plc based ) , erection & commissioning charges supplier scope ( agrosaw , material handling equipment section a hdpe / pp crates stackable type 1 supply of heavy duty injection molded stackable plastic crates of virgin food grade material to withstand temperature from ( 30 ) degree centigrade to ( +70 ) degree centigrade. the dimensional tolerance shall be within ±10 mm. the crates shall be with flat bottom. the crates shall preferably with side perforation of external dimensions 595 mm ( l ) x 395 mm ( b ) x 155 mm ( h ) section b weighing scale 2. supply and testing of light duty single cell ss platform type weigh scale, column mounted indicator, weighing capacity 50 kg, least count 10 gm. platform size 600 mmx 500 mm. weigh scale shall be stamped from weight & measurement department ( for iqf section bag weighing ) section c hand pallet truck ( hpt ) 3. supply, testing and commissioning hand pallet trucks ( hpt ) : capacity ( kg ) : 2000 2500 pallet size:1000mmx1200mm , fork height= 200 mm load roller tandem wheel 80*70fork size 160*50 fork length= 1150 mm, forks width= 520mmoverall length 1540 mm , steering wheel= 200*50 1 thermal insulation 2 panel fixing accessories 3 doors 4 anti collision bollards 5 air curtain 6 compressor 7 vfd 8 compressor motor 9 cooling coil 10 evaporative condenser 11 primary pumps 12 secondary pumps 13 cooling tower 14 cooling tower pumps 15 ammonia pipeline 16 glycol / water pipeline 17 valve and control 18 humidifiers & humidifier controller 19 refrigerant piping & fitting 20 main lt panel / motor control center ( mcc ) 21 oil & refrigerant 22 control panel 23 cables 24 electrical power, chemical earthing, control cables, sensor cables, cable tray etc 25 electrical fixtures 26 plc controller 27 internal electrification 28 cold store / frozen cold store : led fittings with ip 67 grade 29 ante room & pack house areas 1200 mm long, 36 w led fitting 30 smoke detector 31 indoor / outdoor piping support and structural platforms and service pipe bridge 32 hand pallet truck ( hpt ) 33 hdpe / pp crates stackable type 34 weighing scale 36 dock leveller 38 pressure relief valve 40 plastic pallets...

Department of Prisons - Bihar

42981010 selection of agency for supply of raw materials for printing press industries in various jails paper 43cm x 69 cm paper 46cm x 58.5 cm ruling paper 41cm x 64 cm paper 50cm x 75 cm paper 58.5 cm x 91 cm flyleaf board plastic coted 71cm x 56 cm ( yellow, red, green, khakhi, orange, blue, white, sky blue, gray, pink ) flyleaf board simple 71cm x 56 cm ( yellow, red, green, khakhi, orange, blue, white, sky blue, gray, pink ) ledger paper 43 cm x 69 cm 70 gsm colored paper ( yellow / red / blue / green ) 46cm x 58.5 cm cardboard paper laser tracing paper a4 laser tracing paper a3 ( legal ) royal blue ink magenta ink black ink ( offset press machine ) red ink ( offset press machine ) yellow ink ( offset press machine ) green ink ( offset press machine ) blue ink ( offset press machine ) natural gum arabic solution for ps plates ink tack reducer fountain solution concentrate copper sulphate commercial grade silicon grease image remover fluid for ps plate plate cleaner press wash density booster powder developer concentrate for analog positive plates engine lubricant oil ( mobil ) uv ctp + ve plate ( analog positive plates ) long run viscose sponge stulen sheet ( fine ) dumping cloth for offset machine roller size 200 dumping socks stiching steel wire 20 nos. 4 ply blanket under blanket rubber shocker for offset machine synthetic adhesive book binder sewing needle nylon thread for register binding binding cloth cardboard ( pakki kut ) marble paper bopp transperent self adhesive tape 1 / 2 width bopp transperent self adhesive tape 48 mm width packing repeat for pet strap cutting machine beat numbering machine brush card repeat for flyleaf plastic coated packing wrapper sheet packing corrogated box for a4 bundles cartoon strap lamination plastic sheet roll adhesive for lamination machine...

Public Health Department. - Bihar

42777404 tender for deployment of repairing team for repairing of ordinary/special! slngur.total 671 nos. handpump and lmi •ll/imllltotal 66 nos. handpump including vehicle and fuel charges, mobile/lubricant etc. under rh. sub division, saharsa & saurbazar (blocks kahra, sattar katalya, nauhatta, saurbazar, patarghat & banma ltahari) in saharsa district for the year of 2023 24 (total 737 nos. handpump)...

Public Health Department. - Bihar

42777389 tender for deployment of repairing team for repairing of ordina ry/special/singur total 64 1 nos. handpump and im il/im illt ootal 46 nos. handpump including vehicle and fuel charges, mobile/lubricant etc. under rh. sub division, sonbarsa & simri bakhtiyarpur (blocks sonbarsa, salkhuha, simri bakthiyarpur & mahishi in saharsa district for the year of 2023 24 (total 687 nos. handpump) ...

Rail Wheel Plant - Bihar

42405782 supply of degreasers & rustdegreasers & rust,wd 40 (lubricants, degreasers & rust remover). package size 5 ltr. or equivalent in all respect. [ warranty period: 12 months after the date of delivery ] => limited...

Eastern Railways - Bihar

42208766 supply of lubricant for pressing in of wheelslubricant for pressing in of wheels,lubricant for pressing in of wheels on axle in 1 kg pack, 1)nalco 3295 ofm/s.nalco india ltd.kolkata or 2)arca mounting paste of m/s.fag bearings indi ltd.new delhi. [ warranty period: 30 months after the date of delivery ]...

Hpcl Biofuels Limited - Bihar

41987797 supply on door delivery basis of various grease and lubricant , supply of various grease & lubricant as per mentioned below: , omega 85 shear sensation plus all purpose high performance grease nlgi #2 ( for high temperature ) , kluber varilube pks2 ptfe & lithium base grease, , omega 38 crystal clear fg grease ( for oil seal & o rings ) , omega 904 industrial oil concentrate...

Ministry Of Railways - Bihar

41891354 bids are invited for gear lubricants, multipurpose (v2) as per is 1118 (q2) total quantity : 300...

Eastern Railways - Bihar

41880795 supply of procurement of cyprina ra greaseprocurement of cyprina ra grease, lubricant of traction motor armature sealed bearing ( ge / bhel make ) shell gadus rail s2 traction motor bearing grease of m / s shell india ltd. or servoplex tm3 of m / s ioc or balmerol multigrease tm3 of m / s balmer lawrie. [ warranty period: 30 months after the date of delivery ] ...

East Central Railway - Bihar

41681288 supply of silicon lubricant silicon oil ( base silicon fluid & composition polymethyl siloxane ) pack size aerosal can 400 ml ( avalubus s40 ) . material to be procured from approved vendors or their authorised dealer. [ warranty period: 30 months after the date of delivery ] ...

Power Grid Corporation Of India Limited - Bihar

40598663 bids are invited for drive mechanism without control panel for siemens make circuit breaker (q3) , o ring (12.5 mm and 14mm) and lubricants for siemens make circuit breaker (q3) total quantity : 2...

Eastern Coal Fields Ltd - Bihar

40471704 welding, cutting, cleaning, de scaling of lubricants, removal of debris arising out of dust accumulation, handling of ropes, cables, drag chains, hoist chains & consumables of 7820 dragline for 4 ( four ) months....

Rail Wheel Plant - Bihar

39922874 supply of sew make geared motorsew make geared motor,sew make geared motor no. rf77drn80mk4/be1hr/ase1/th/al input speed a(r/min) : 1435.0, calc. output speed a (r/min) : 8.6 total ratio(l) : 166.59, mounting position/lm : m2, shaft design :v, output torque (nm):610.0, service factor fb : 1.35 top coat : 7031 51370310, lubricant type : clp 220 brake : be1b, ambient temperature motor (degree c) : 20..40 brake rectifier : bg1.5, brake release : 002, rated current (a) : 2.3 brake torque (nm) : 10, brake voltage (v) : 400 [ warranty period: 30 months after the date of delivery ]...

Bharatiya Rail Bijlee Company Limited - Bihar

39725728 procurement of various grade lubricants of iocl make for onm at brbcl , gear oil,industrial,servo mesh sp320 , gear oil,compr,servo mesh sp460,iocl , gear oil,servo gear hp90,sae90 , hydraulic oil,compr,servo press100,iocl , li base grease,automotive,servo gem2 , li base grease,industrial,servo gem ep3 , oil,turbine,servo prime68 , oil,cyl,servo cyl c680,iso vg680 , gear oil,industrial,servo mesh sp680 , hydraulic oil,servo syshlp32 , oil,turbine,servo prime46,iso vg46,iocl , hydraulic oil,servo conval46 , hydraulic oil,servo sys220 , hydraulic oil,servo transc4,sae30 , hydraulic oil,servo syshlp68 , hydraulic oil,servo sys46,iso vg46 , oil,crankcase,servo super,sae20w40 , oil,servo pridexl,sae15w40 , hydraulic oil,servo ultrakb10,sae10w , lubricant,open gear,coat 140,iocl , engine oil,locomotive,servo rr606 , hydraulic oil,servo sys150,iocl , coolant,anti freeze,hindustan petrolium , li base grease,industrial,servo gem ep0 , gear oil,servo gear,saehp80w , engine oil,servo ultrakb30,sae30 , li base grease,industrial,servo gem ep3 , grease,servo gem3 , hydraulic oil,servo sys32 , oil,turbine,servo prime46t,iso vg46 , hydraulic oil,servo sys68...

East Central Railway - Bihar

39654984 supply of liplex t2 grease ( high performance specialist lubricant ) for pantograph servomotor, ( working temperature = 20 degree centigrade to +180 degree centigrade ) of balmerol / ioc / hp. product name : bl liplex t2 / moblux 2 p5 ( 10c ) . [ warranty period: 30 months after the date of delivery ] ...

Border Security Force - Bihar

39283215 bids are invited for lubricant mse mahindra maxmile synthetic f2 transmision oil 01 ltr pack , mahindra maxmile elite axel oil 01 ltr pack , mahindra maxmile ultra engine oil 01 ltr pack , mahindra maxmile feo engine oil 01 ltr pack , mahindra maxmile ultra cool pink 01 ltr pack , mahindra maxicare windshield washer 100 ml pack , mahindra maxiclean d e f adblue 10 ltrs pack , gulf force engine oil 10 w 30 ck4 05 ltrs pack , gulf force gear oil 80 w ll 01 ltrs pack , gulf force axel oil 85 w 140 01 ltrs pack , coolant servo 01 ltrs pack , engine oil 15w 40 servo 20 ltrs pack , gear oil hp 90 servo 20 ltrs pack , distle water 01 ltr pack total quantity : 375...

East Central Railway - Bihar

39246425 supply of c category filters, breathers and lubricants in hydraulic system. as per annexure a...

All India Institute Of Medical Sciences - Bihar

39190056 tender for replacement of ab switch 33 kv main receiving substation at aiims patna. slno description unit qty supplying of channel iron 75 mm x 40 mm x6 mm (7.14 kg per metre) pole top bracket/ cross arm for single 33 kv over head line conductor complete with 50 mm x 6mm flat iron clamps, bolts and nuts including drilling holes for insulator pins, bolts, nuts, washers etc and painting with primer and finish paint as required. 4 2 took 3 4 1 each supplying and erection of 33 kv pin insulator complete with large steel head g.i. pin, nuts, washers etc as required. set supplying 33 kv overheadline 800 ampere air brake switch (ab switch)(3 nos in each set) rate per set providing and painting with aluminium paint on g.i pole litre 5 supply of danger board each 2 6 copper earthing 80/3 pit as per norms of sbpdcl each 2 7 supplying of g.i earthing strip 25 x 3 mm 8 wolf connector 9 10 aluminium lugs 250 mm nut & bolt with washer lubricant for nut & bolt 11 12 installation & transportation kg 15 mtr 24 each 12 kg 5 kg 1 each 2...

East Central Railway - Bihar

38809397 supply of synthetic grease for anti roll bar bearing: high lub sw2 of carl bechem lubricants or synthox ( hs ns ) non staining high speed synthetic grease of m / s stanvac or sg 180 molygraph or similar. [ warranty period: 30 months after the date of delivery ] ...

East Central Railway - Bihar

38640650 supply of lubricants / coating for fiat bogies in packing of 5 litres as cortec vpci368n or molytec ep of m / s stanvac chemicals india ltd or similar. [ warranty period: 30 months after the date of delivery ] ...

Eastern Railways - Bihar

38621774 supply of gear lubricant, multipurpose ( extreme pressure gear oil ) to is : 1118 / 2019 ( 2nd revision ) , ( api gl 4 with 4 ball rig test only ) , gr. sae 90. [ warranty period: 30 months after the date of delivery ] ...

Ministry Of Railways - Bihar

38586534 bids are invited for custom bid for services hire charge for providing mini trucktata xenon pick up van diesel double seater along with driver for use of nf railway cw and tl ac at kir for performing journeys on railway duty over any placed of kir division for three y.. , custom bid for services running charges towards running of the vehicle for the distance run for use of nf railway mechanical department cw and tl ac including cost of fuel lubricants and all other consumables to be supplied by the contractor...

Ministry Of Power - Bihar

38550893 bids are invited for nabinagar mobil lubricants for fans 1 oil, brg, mobil shc639, iso vg1000 2 oil, brg, mobilgear 600xp320, exxon lub 3 oil, brg, mobil shc634, exxon lub 4 oil, brg, mobil glygoyle30, exxon lub 5 grease, mobilgrease28, nlgi 1.5, exxonmobil 6 grease, brg, mobil temp78 total quantity : 20664...

Ministry Of Railways - Bihar

38538029 bids are invited for custom bid for services hiring of one tata or similar vehicle of minimum 10 t capacity including driver and khalasi and all other consumable including diesel oil as per scope of work for transportation of c and w material for njp , custom bid for services running charges of truck including cost of fuel and lubricant...

Indian Army - Bihar

38457646 bids are invited for med store 1 calcium sodium alginate wound dressing 2 cavonil spray 3 macconkey agar plate ready to use 4 povidone iodine 5% ointment 250 gm jar 5 2 ply face mask 0, 01, 2, 3, 4 6 26 gauze needle ( ½ inch ) 7 60% v / v ethyl alcohol with benzalkonium chloride, glycerine, dimethicone cyclopentasiloxane, c12 15 alkyl lactate, propylene glycol, methylparaben, phenoxyethanol, stearyl alcohol, aminomethyl propanol, diazolidinyl urea with moisturizer, 1 ltr bott with dispenser 8 abdominal drain bag 9 abdominal drain set 28 10 abdominal drain set 32 11 abdominal binder size l, xl, xxl 12 abst betadine ( povidone iodine ) 13 abst cefotaxime 14 abst doxycycline 15 abst metronidazole 16 abst mupirocine 17 acetone commercial 18 acetone ( 1x500ml ) 19 acid hydrochloric ( 1x500ml ) 20 acyclovir 200mg tab 21 acyclovir cream 5% tube of 5g 22 acyclovir syp 400 mg / 5 ml 23 adhesiv incise drape 25x30 cm 24 adhesiv incise drape 50x45 cm 25 adhesiv incise drape 5x15 cm 26 adhesive plaster tape, 3 inches, box of 4, microfoam 27 adhesive plaster, micro porous tape, 1 inch, box of 12 28 adhesive plaster, micro porous tape, 2 inches, box of 6 29 adhesive plaster, micro porous tape, 3 inches, box of 4 30 adhesive plaster, zinc oxide, 2.5 cm x 1mtr 31 adult diapers m , l , xl , xxl 32 aero mask nebulizer ( pead ) 33 airway guedel all rubber / pvc , all size ( adult ) 34 airway guedel all rubber / pvc , all size ( infant ) 35 airway guedel all rubber / pvc , all size ( peadiatric ) 36 alcohol methyl 37 amoxicillin 750 mg +omeprazole 20 mg+ ornidazole 500 mg ( hp ) tab 38 amoxycillin 250mg cap 39 amoxycillin 875 mg + clavulanic acid 125 mg tab 40 amyl alcohol 41 anaesthesia face mask size 3 transparent, cushioned 42 anaesthesia face mask size 4 transparent, cushioned 43 anaesthesia face mask size 5 transparent, cushioned 44 anticaries fluoride rinse mouth wash with sodium fluoride acidulated phosphate bott of 300 500 ml 45 antimicrobial hand gel containing ethyl alcohol 60% + cyclomethicone c12 15 alkyl lactate + cetyl lactate + phenoxyethanol + stearyl alcohol with moisturizer 46 antiseptic mouth wash containing sodium fluoride & triclosan bott of 100 150ml 47 apparatus anaesthetic face mask ( anitistatic ) with air cushion ( transparent ) , size 2, medium and large 48 apparatus oxygen inhalation portable facemask disposable for 49 appendrofs tube ( 1x1000 ) 50 aquacel ag burn dressing 10 x10 cm 51 aquacel ag burn dressing 15x15 cm 52 aquacel ag burn dressing 23x30cm 53 aquacel ag burn gloves size 3 54 aquacel ag burn gloves size 4 55 aquacel ag burn gloves size 5 56 aquamin+ vitamin k2 + vitamin d3 tab 57 arm sling 58 aso titrate test kit rapid ( 1x25 test ) 59 baby identification tags ( pink and blue ) 60 bain circuit 61 bakri postportum balloon 62 bandage crepe 10 cm 63 bandage open wove uncompressed 10 cm x 6 mtr 64 bandage open woven for plaster of paris 10cmx5m 65 bandage, open woven compressed 2.5 cm x 4 mtr 66 bandage, plaster of paris 10 cm x 3 mtr 67 bandage, plaster of paris 15 cm x 3 mtr 68 barium sulphate suspension palatable non flocculating high density ( 200% w / v ) 69 beclomethasone dipropionate 200 mcg metered dose aerosol, containing 200 metered doses 70 beclomethasone dipropionate 50 mcg and levosalbutamol 50 mcg per metred dose in cfc free mdi 71 benzoyl peroxide ( 5.0%w / w ) tube of 20 gm gel 72 betamethasone dipropionate usp 0.05mg and gentamycin sulphate 1mg / gm, tube of 5gm 73 betaxolol eye drops 0.25 % 0.5% 5 ml 74 bimatoprost 0.03% bott of 3ml eye drop 75 bio chemical reaction ( sugar set ) ready to use 76 biofix / cytofix spray ( 1x125ml ) 77 bioscrub antiseptic solution for scrubing 78 biotin 5 mg tab 79 biotin with calcium pantothenate tab 80 bladder rectractor 81 blade for humby skin grafting ( knife & blade 82 blood agar plate ( ready to use ) 83 blood culture plates ( rtu ) 84 blood glucose test strip with name compan ( dr morpen gluco one ) 85 bp handle 86 brimonidine 0.02%+ timolol 0.5% eye drops bott of 5 ml 87 brimonidine tartrate 0.15% eye drops bott of 5 ml 88 bromhexine syp 5 ml containing 4 mg of bromhexine hcl, bottle of 100 ml 89 bromofenac 0.09% eye drops bott of 5 ml 90 c reactive protein ( kit for 50 tests ) 91 calamine powder 92 calcium ( 9 mg ) + calcium gluconate ( 50 mg ) inj for iv use, 10 ml injection 93 calcium chloride 0.025 ml for pitk 94 cannula iv with injection port and wings size 16g 95 cannula iv with injection port and wings size 18 g 96 cannula iv with injection port and wings size 20g 97 cannula iv with injection port and wings size 22g 98 cannula iv with injection port and wings size 24g 99 cap addyzoa 100 cap hydroxyurea 500mg 101 cap isotretinoin 20mg 102 cap itraconazole 100mg 103 cap lactare 1 mg 104 cap pancreatin microspheres 150mg and above, 105 cap pantaprazole40 mg+domperidone 10 mg ir+domperidone 20 sr 106 cap rabiprazole 20 mg+domperidone 10 mg ir+domperidone 20 sr 107 cap rifampicin 150mg 108 cap vit a 50000iu 109 cap / tab rifampicin 450 mg + isoniazid 300 mg com bination 110 cap / tab tramadol hcl 50 mg 111 cartridge for urine albumin ( sd biosensor ) 112 cartridge for b hcg 113 cartridge for hs crp ( sd biosensor 114 cartridge for ck mb ( sd biosensor ) 115 cartridge for d dimer ( sd biosensor ) 116 cartridge for hba1c ( sd biosensor ) 117 cartridge for hs crp ( sd biosensor ) 118 cartridge for pct ( sd biosensor ) 119 cartridge for t3 ( sd biosensor ) 120 cartridge for t4 ( sd biosensor ) 121 cartridge for tsh ( sd biosensor ) 122 cartridge for vitamin d ( sd biosensor ) 123 catheter foleys silicon 2 way size 10 fg 5 ml retention balloon 124 catheter foleys silicon 2 way size 12 fg 5 ml retention balloon 125 catheter foleys silicon 2 way size 20 fg 5 ml retention balloon 126 catheter foleys silicon 2 way size 22 fg 20 30 ml retention balloon 127 catheter mount 128 catheter suction endobronchial with terminal transparent non toxic pvc tubing, size fg 10, length 50 cm 129 catheter suction endobronchial with terminal transparent non toxic pvc tubing, size fg 12, length 50 cm 130 cefuroxime susp 125 mg / 5 ml bott of 30 ml 131 cell clean 132 cell pack ( sysmex pack of 20 ltr ) 133 cervical collar l 134 cervical collar m ( hard pheladelphiya ) 135 cervical collar xl 136 chest tube 137 chlordiazepoxide 5 mg + clidinium bromide 2.5 mg tabs 138 chlorhexidine mouth wash with 0.12% sugar, alcohol free, bottle of 450 500 ml in amber coloured bottle 139 chloroform ar ( 1x2.5l ) 140 chloroxylenol solution, potassium hydroxide 13.6g, chloroxylenol solution 50.5g, oleic acid 7.5ml, castor oil 63.0g, terpineal 100ml, ethanol ( 96% ) 200ml, purified water freshly boiled & cooled to produce 1000ml ( nomextn ( also acceptable ) chloroxylenol 4.5 to 5.5%, teripineal 2 to 10%, alcohol 13 to 20%, rwc not less than 3 ) 141 chloroxylenol solution, potassium hydroxide 13.6g, chloroxylenol solution 50.5g, oleic acid 7.5ml, castor oil 63.0g, terpineal 100ml, ethanol ( 96% ) 200ml, purified water freshly boiled & cooled to produce 1000ml ( nomextn ( also acceptable ) chloroxylenol 4.5 to 5.5%, teripineal 2 to 10%, alcohol 13 to 20%, rwc not less than 3 ) 142 chlorpromazine 25mg tab 143 chromic catgut size 1 / 0 rb 3 / 8 circle needle 144 cissus quadrangularis cyanocobalamin calcitrol calcium carbonate vitamin k27 methyl folate &zinc sulphate tablets 145 clavical brace 146 cled agar plate ready to use 147 clomipramine hcl 25mg tab 148 closed suction device 149 clotrimazole +clindamycin vaginal pessary 150 colostomy bag with skin barrier 151 compression elastic bandage for dvt, medium 152 cough sedative syp, each 5 ml containing chlorpheniramine maleate 2.5mg, guaiphenesin 100mg, noscapine 15mg, sodium citrate 60mg in flavoured base, bott of 100 m 153 cover glass ( 22x40 mm 154 covid rapid antigen igg&igm ( 1 x 25 ) 155 cream luliconazole 1 % tube of 15 gm 156 cream obstetric antiseptic containing dichloroxylenol 1%, terpineol 1%, phenol 0.25% in lubricant base 157 cvc tripple lumen 158 derifenacin 15 mg tab 159 derifenacin 7.5 mg tab 160 desensitising paste ( stannous fluoride / potassium nitrate / sodium monoflurophosphate ) tube of 40 55 ml or gm 161 developerfor x ray film to make 09 ltr 162 dextrose monohydrate for oral use in pack of 100 gm with or without vitamins and minerals 163 diclofenac diethylamine, menthyl salicylate , menthol and absolute alcohol topical solution ( non aqueous ) dynapar qps plus 164 diclofenac spray 165 diethyl ether solvent bott of 500 ml 166 dinoprostone gel 0.5mg ( in 3gm / 2.5ml gel ) / syringe 167 dipsposable appron 168 disecting forceps mcindoe 6 inc plain 169 dispo needle 24 g ( pack of 100 ) 170 disposable bed pan 171 disposable close circuit 172 disposable gown ( sterile ) 173 disposable karman cannula, size 10 mm 174 disposable karman cannula, size 4 mm 175 disposable karman cannula, size 5 mm 176 disposable karman cannula, size 6 mm 177 disposable karman cannula, size 7 mm 178 disposable karman cannula, size 8 mm 179 disposable karman cannula, size 9 mm 180 disposable lancet for finger prick, pkt of 100 181 disposable plastic endometrial biopsy pipelle 182 disposable plastic infusion set for plasma / blood ( presterilised, pyrogen free ) complete with airl ine and nylon filter alongwith air vent 183 disposable port 5 mm 184 disposable port 12 mm 185 disposable shoe cover 186 disposable swabstick 187 dissecting mat for tissue grossing 188 dolopar tab ( pcm+caffeine ) 189 dorzolamide 2% w / v + timolol 0.5% w / v eye drops, bott of 5ml dimple bottle 190 doxyfylline 400 tab 191 drabkins solution ( diluting solution for haemoglobin estimation by cyanmet haemoglobin method ) 192 dressing , first aid, unmedicated sterile pack 193 dressing medicated gauze paraffin, 10 cm x 10 cm, tin of 24 194 drotaverine hcl 1%, 20 mg / ml, 2 ml inj 195 ear drop beclomethasone + neomycin 196 ear drop para dichlorobenzene 2% w / v, benzocaine 2.7% w / v, chlorbutol 5%, turpentine oil 15% w / v, bott of 10 ml 197 ecg electrodes ( disposable ) 198 ecg paper 6018 t 199 elastic knee support 200 elbow support total quantity : 200...

East Central Railway - Bihar

38421210 supply of c category filters, breathers and lubricants in hydraulic system. as per annexure a [ warranty period: 30 months after the date of delivery ] ...

Rail Wheel Plant - Bihar

38227370 supply of sew make geared motor no. rf77drn80mk4 / be1hr / ase1 / th / al input speed a ( r / min ) : 1435.0, calc. output speed a ( r / min ) : 8.6 total ratio ( l ) : 166.59, mounting position / lm : m2, shaft design :v, output torque ( nm ) :610.0, service factor fb : 1.35 top coat : 7031 51370310, lubricant type : clp 220 brake : be1b, ambient temperature motor ( degree c ) : 20..40 brake rectifier : bg1.5, brake release : 002, rated current ( a ) : 2.3 brake torque ( nm ) : 10, brake voltage ( v ) : 400 [ warranty period: 30 months after the date of delivery ] ...