Hpcl Biofuels Limited - Bihar

43572499 supply of risansi make high flow pumps and its spares parts on door delivery basis at integrated hbl plant, lauriya , supply of spares for pump model no: rcch 4150 laabn jzs, cap 25 tph, head 60 mwc as per below specifications: , ss rotor , shaft , coupling rod , stuffing box , head pin , pin , centre head , rubber stator , boot seal , circlip lock , bush , shaft head , sleeve , seal ring , sleeve ring , circlip , tie rod , supply of spares for pump model no: rcch 6160 l aabn, cap 35 tph, head 60 mwc as per below specifications: , ss rotor , shaft , coupling rod , stuffing box , head pin , pin , centre head , rubber stator , boot seal , circlip lock , bush , shaft head , sleeve , seal ring , sleeve ring , circlip , tie rod , supply of spares for pump model no: pslh 6185 aabn, cap 30 m³/hr., head 30 mwc as per below specifications: , ss rotor , shaft , coupling rod , stuffing box , head pin , pin , rubber stator , boot seal , circlip lock , bush , shaft head , sleeve , seal ring , sleeve ring , circlip , tie rod , supply of spares for pump model no: rtoh 6185 aabn, cap 30 tph, head 30 mwc as per below specifications: , ss rotor , shaft , coupling rod , stuffing box , head pin , pin , rubber stator , boot seal , circlip lock , bush , shaft head , sleeve , seal ring , sleeve ring , circlip , tie rod , supply of spares for pump model no: rtoh 8190 aabn, cap 40 m³/hr., head 30 mwc as per below specifications: , ss rotor , shaft , coupling rod , stuffing box , head pin , pin , rubber stator , boot seal , circlip lock , bush , shaft head , sleeve , seal ring , sleeve ring , circlip , tie rod , supply of spares for pump model no: rah 82100 aabn, cap 50 m³/hr., head 30 mwc as per below specifications: , ss rotor , shaft , coupling rod , stuffing box , head pin , pin , rubber stator , boot seal , circlip lock , shaft head , sleeve , seal ring , sleeve ring , circlip , tie rod , supply of spares for pump model no: rsoh 6185 aabn, cap 50 tph., head 30 mwc as per below specifications: , ss rotor , shaft , coupling rod , stuffing box , head pin , pin , rubber stator , boot seal , circlip lock , bush , shaft head , sleeve , seal ring , sleeve ring , circlip , tie rod , supply of new pump, make “risansi” as per below specifications: , risansi make pump with accessories (base plate, pump pulley, motor pulley, foundation & grouting, bolts, v belts + motor unit (make: abb/bbl/cgl). specification of pump: model –rtoh1220 bbbn msa, head: (mwc) – 80 100, capacity (lph) 220, type of pump screw pump, liquid magma floc, material of construction (body ss 304, shaft ss 304, rotor ss 410 ht hcp, stator nitrile, sealing type ril, single mechanical seal internally mounted to be coolded by liquid spring loaded tc vs tc vitom, pump details (suction size 1 bsp) delivery size: 1bsp,pump speed: 240 rpm, pump stage: double stage, drive system specification: motor type: ie2/ip55/class f/tefc, drive motor make: abb/bbl/cgl, drive motor speed: 960 rpm, drive motor rating 0.75 /1 hp, motor mounting foot mounted, drive systems v belt, power supply 415v/3ph/50hz starter type: dol. note: starter out of scope. , risansi make pump with accessories (base plate, pump pulley, motor pulley, foundation & grouting, bolts, v belts + motor unit (make: abb/bbl/cgl). specification of pump: model –rtoh6180 abbn msa, head: (mwc) – 60 mwc, capacity –(m³/hour) 40, type of pump screw pump, liquid molasses, material of construction (body ci is210 fg260, shaft ss 410 ht, rotor ss 410 ht hcp, stator nitrile, sealing type gland packing. pump details (suction size 6 is6392 table 17), delivery size: 6is6392 table 17), pump speed: 400 rpm, drive system specification: motor type: ie2/ip55/class f/tefc, drive motor make: abb/bbl/cgl, drive motor speed: 1450 rpm, drive motor rating 20 kw, motor mounting foot mounted, drive systems v belt, power supply 415v/3ph/50hz, starter type: dol. note: starter out of scope....

Indian Oil Corporation Limited - Bihar

43013373 procurement of twin screw pump cartrides assembly of tushaco make at iocl barauni refinery , list of item ( s ) / work ( s ) as per tender documents , pump cart. assy., tdah 135 / 075, tushaco , pump cart. assy., tdah 210 / 102, tushaco , pump cart. assy., tdah 118 / 058, tushaco , pump cart. assy., tdah 118 / 040, tushaco , comp.pump, tushaco, model snh 120 er 54...

Indian Oil Corporation Limited - Bihar

42535117 procurement of twin screw pump cartrides assembly of tushaco make at iocl barauni refinery , list of item(s) / work(s) as per tender documents , pump cart. assy.,tdah 135/075,tushaco , pump cart. assy.,tdah 210/102,tushaco , pump cart. assy.,tdah 118/058,tushaco , pump cart. assy.,tdah 118/040,tushaco , comp.pump,tushaco,model snh 120 er 54...

Hindustan Urvarak and Rasayan Limited - Bihar

34042525 annual rate contract for mechanical maintenance ( rotary equipments ) at hurl barauni pm of centrifugal pump 2 pm of cent pump upto 5 kw 3 pm of cent pump >5 to 18.5 kw 4 pm of cent pump >18.5 to 55 kw 5 pm of cent pump >55 to 110 kw 6 pm of cent pump >110 to 220 kw 7 pm of cent pump >220 to 550 kw 8 pm of cent pump >550 to 1100 kw 9 pm of cent pump >1100 to 1800 kw 10 pm of cent pump >1800 to 3000 kw 11 pm of reciprocating / metering / diaphragm pump 12 pm of recip pump upto 5 kw 13 pm of recip pump >5 to 18.5kw 14 pm of recip pump 118 kw 15 pm of screw, gear pump ( sor 95 97 ) 16 pm of screw / gear pump upto 5 kw 17 pm of screw / gear pump >5 to 18.5kw 18 pm of screw / gear pump >18.5kw to 55 kw 19 pm of cooling tower fan ( sor 242 247 ) 20 pm of ct fans 21 alignment of ct gb with motor 22 replacement of ct gear box 23 shaft replacement of ct 24 hubs / blades repacement of ct 25 blade angle checking / setting 26 ct sump screen cleaning 27 pm of fin fan cooler 28 pm of fin fan cooler upto 30 kw 29 pm of tank mixer / agitators 30 pm of agitators upto 5 kw 31 pm of agitators above 5 kw upto 18.5 kw 32 pm of lobe type blower 33 pm of lobe blower upto 7.5 kw 34 pm of lobe blower >7.5 kw upto 22.5 kw 35 pm of lobe blower >22.5 kw upto 45 kw 36 pm of lobe blower >45 kw upto 100 kw 37 pm of lobe blower >100 kw upto 290 kw 38 pm of centrifugal fan / blower 39 pm of fans / blowers upto 5 kw 40 pm of fans / blowers >5 to 18.5 kw 41 pm of fans / blowers>18.5 to 55 kw 42 pm of fans / blowers>55 to 110 kw 43 pm of fans / blowers >110 to 220kw 44 pm of fans / blowers >220 to 550 kw 45 pm of fans / blowers >550 to 1100 kw 46 pm of fans / blowers >1100 to 1800 kw 47 pm of oil centrifuge 48 pm of oil cent. upto 30 kw 49 centrifuge mode change water to sediments and vice versa 50 pm of diesel engine 51 pm of diesel engine 450 kw 52 pm of diesel engine 2.5 mw 53 pm of rotary scrapper 54 pm of rotary scrapper 16.1 kw 55 pm of rotary scrapper grease pump 0.5 kw 56 pm of bucket support system 57 pm of rotary mechanism for bss 4.75 kw 58 pm of hoisting mechanism for bss 0.37 kw 59 pm of steam turbine 60 pm of steam turb 30 kw 61 pm of steam turb 55 kw 62 pm of steam turb 90 kw 63 pm of steam turb 730 kw 64 pm of steam turb 1218 kw 65 pm of steam turb 1451 kw 66 pm of steam turb 1573 kw 67 pm of steam turb 1602 kw 68 pm of steam turb 1844 kw 69 pm of gear box 70 pm of gear box upto 5 kw 71 pm of gear box >5 to 18.5kw 72 pm of gear box >18.5 to 55kw 73 pm of gear box 5015 kw ( b 10 p 1001a / b ) 74 pm of gear box 3430 kw ( b 41 pk 0001 gb 1 & 0002 gb 1 ) 75 pm of gear box 1850 kw ( b56 p 0501d ) , act 76 pm of gear box 1220 kw ( b55 p 0501c ) , uct 77 pm of gear box 1600 kw ( b10 7001b ) , bfw ammonia 78 pm of gear box 1600 kw ( b 10 k 2001 / 2002 ) , id / fd fan 79 pm of gear box 204 kw ( b 55 f 0501a f ) , uct ct fan 80 pm of gear box 278 kw ( b 56 f 0501a i ) , act ct fan 81 pm of vertical submersible pump 82 pm of vert submers pump upto 10 kw 83 pm of vert submers pump >10 to 20 kw 84 pm of vert submers pump >20 to 45 kw 85 pm of vert submers pump >45 to 90 kw 86 pm of vert submers pump >90 to 160 kw 87 pm of reciprocating compressors 88 pm of recip compr upto 45 kw 89 pm of recip compr upto >45 to 110kw 90 pm of recip compr >110.kw to 460kw 91 pm of centrifugal compressors 92 pm of centr compr 540 to 700 kw 93 pm of screw compressors 94 p.m of screw comp 42 kw 95 p.m of screw comp 229 kw 96 pm of expansion turbine 97 pm of expansion turbine. 98 pm of eot 99 decoupling & coupling 100 duplg & cuplg upto 5 kw 101 duplg & cuplg >5 to 18.5kw 102 duplg & cuplg >18.5 to 55kw 103 duplg & cuplg >55 to 110kw 104 duplg & cuplg >110 to 220kw 105 duplg & cuplg >220 to 550 kw 106 duplg & cuplg >550 to 1100 kw 107 duplg & cuplg >1100 to 1800 kw 108 duplg & cuplg >1800 to 3000 kw 109 alignment 110 cold align upto 5 kw 111 cold align >5 to 18.5kw 112 cold align >18.5 to 55kw 113 cold align >55 to 110kw 114 cold align >110 to 220kw 115 cold align >220 to 550 kw 116 cold align >550 to 1100 kw 117 cold align >1100 to 1800 kw 118 cold align >1800 to 3000 kw 119 coupling hub removal & installation ( driver / driven ) 120 cuplg hub rem ( dvr / dvn ) upto 5 kw 121 cuplg hub rem ( dvr / dvn ) >5 to 18.5kw 122 cuplg hub rem ( dvr / dvn ) >18.5 to 55kw 123 cuplg hub rem ( dvr / dvn ) >55 to 110kw 124 cuplg hub rem ( dvr / dvn ) >110 to 220kw 125 cuplg hub rem ( dvr / dvn ) >220 to 550 kw 126 cuplg hub rem ( dvr / dvn ) >550 to 1100 kw 127 cuplg hub rem ( dvr / dvn ) >1100 to 1800 kw 128 gland packing job 129 gland & pkng >5 to 18.5kw 130 gland & pkng >18.5 to 55kw 131 gland & pkng >55 to 110kw 132 gland & pkng >110 to 220kw 133 gland & pkng >220 to 550 kw 134 gland & pkng >550 to 1100 kw 135 gland & pkng >1100 to 1800 kw 136 pulley removal ( drive / driven ) pulley removal for fin fans / tank mixers / cooling tower fans / compressors ( drive eqpt ) . 137 pulley rem drv / drvn >5 to 18.5kw 138 pulley rem drv / drvn >18.5 to 55kw 139 pulley rem drv / drvn >55 to 110kw 140 pulley rem drv / drvn >110 to 220kw 141 belt replacement job 142 belt repl upto 18.5kw 143 belt repl >18.5 to 55kw 144 belt repl >55 to 110kw 145 lifting and shifting of driver / driven 146 lftg&sftg of dvr / drvn >5 to 18.5kw 147 lftg&sftg of dvr / drvn >18.5 to 55kw 148 lftg&sftg of dvr / drvn >55 to 110kw 149 lftg&sftg of dvr / drvn >110 to 220kw 150 lftg&sftg of dvr / drvn >220 to 550 kw 151 lftg&sftg of dvr / drvn >550 to 1100 kw 152 lftg&sftg of dvr / drvn >1100 to 1800 kw 153 lftg&sftg of dvr / drvn >1800 to 3000 kw 154 centrifugal pump single stagereplacement of casing gasket 155 casing gskt repl single stg >5 to 18.5kw 156 casing gskt repl single stg >18.5 to 55kw 157 casing gskt repl single stg >55 to 110kw 158 casing gskt repl single stg >110 to 220kw 159 centrifugal pump single stagemechanical seal replacement. 160 m / seal repl single stg >5 to 18.5kw 161 m / seal repl single stg >18.5 to 55kw 162 m / seal repl single stg >55 to 110kw 163 m / seal repl single stg >110 to 220kw 164 centrifugal pump single stagecomplete ovehauling 165 o / h sngl stg cent.pump >5 to 18.5kw 166 o / h sngl stg cent.pump >18.5 to 55kw 167 o / h sngl stg cent.pump >55 to 110kw 168 o / h sngl stg cent.pump >110 to 220kw 169 cent. pump single / multi stage between brg ( h ) de / nde bearing replacement. 170 de / nde brg repl multi stg >5 to 18.5kw 171 de / nde brg repl multi stg >18.5 to 55kw 172 de / nde brg repl multi stg >55 to 110kw 173 de / nde brg repl multi stg >110 to 220kw 174 de / nde brg repl multi stg >220 to 550 kw 175 de / nde brg repl multi stg >550 to 1100kw 176 de / nde brg repl multi stg >1100 to 1800 kw 177 de / nde brg repl multi stg>1800 to 3000 kw 178 cent. pump single / multi stage between brg ( h ) de / nde mechanical seal replacement. 179 de / nde m / seal repl mlt stg >5 to 18.5kw 180 de / nde m / seal repl mlt stg >18.5 to 55kw 181 de / nde m / seal repl mlt stg >55 to 110kw 182 de / nde m / seal repl mlt stg >110 to 220kw 183 de / nde m / seal repl mlt stg >220 to 550 kw 184 de / nde m / seal repl mlt stg>550 to 1100kw 185 de / nde m / seal repl mlt stg >1100 to 1800 kw 186 de / nde m / seal repl mlt stg>1800 to 3000 kw 187 centrifugal pump multi stage between brg ( h ) complete ovehauling 188 o / h of cp mlt stg ( h ) >18.5 to 55kw 189 o / h of cp mlt stg ( h ) >55 to 110kw 190 o / h of cp mlt stg ( h ) >110 to 220kw 191 o / h of cp mlt stg ( h ) >220 to 550 kw 192 o / h of cp mlt stg ( h ) >550 to 1100 kw 193 o / h of cp mlt stg ( h ) >1100 to 1800 kw 194 centrifugal pump single stage vertical mechanical seal replacement. 195 m / seal repl of sngl stg ( v ) >5 to 18.5kw 196 m / seal repl of sngl stg ( v ) >18.5 to 55kw 197 m / seal repl of sngl stg ( v ) >55 to 110kw 198 centri pump single stage vertical bearing replacement. 199 brg repl sngl stg ( v ) >5 to 18.5kw 200 brg repl sngl stg ( v ) >18.5 to 55kw 201 brg repl sngl stg ( v ) >55 to 110kw 202 centrifugal pump single stage vertical complete overhauling 203 o / h of sngl stg ( v ) >5 to 18.5kw 204 o / h of sngl stg ( v ) >18.5 to 55kw 205 o / h of sngl stg ( v ) >55 to 110kw 206 centrifugal pump multi stage ( v ) bearing replacement 207 brg repl mlt stg ( v ) >5 to 18.55kw 208 brg repl mlt stg ( v ) >18.5 to 55kw 209 brg repl mlt stg ( v ) >55 to 110kw 210 centrifugal pump multi stage ( v ) mechanical seal replacement 211 m / seal repl mlt stg ( v ) >5 to 18.5kw 212 m / seal repl mlt stg ( v ) >18.5 to 55kw 213 m / seal repl mlt stg ( v ) >55 to 110kw 214 centrifugal pump multi stage ( v ) complete overhauling 215 o / h of mlt stg ( v ) >5 to 18.5kw 216 o / h of mlt stg ( v ) >18.5 to 55kw 217 o / h of mlt stg ( v ) >55 to 110kw 218 centrifugal pump sundyne.mechanical seal replacement g.b side and pump side 219 seal leak attending sundyne 55 kw 220 centrifugal pump sundyne.overhauling 221 o / h of sundyne pump 55 kw 222 screw pump tripple screwcover gasket replacement job. 223 cvr gskt repl tri screw upto 5.5 kw 224 cvr gskt repl tri screw >5.5 to 18.5kw 225 cvr gskt repl tri screw >18.5 to 55kw 226 cvr gskt repl tri screw >55 to 90kw 227 screw pump tripple screwde bearing replacement. 228 de brg repl tri screw upto 5.5 kw 229 de brg repl tri screw >5.5 to 18.5kw 230 de brg repl tri screw >18.5 to 55kw 231 de brg repl tri screw >55 to 90kw 232 screw pump tripple screwnde bearing replacement jobs. 233 nde brg repl tri screw upto 5.5 kw 234 nde brg repl tri screw >5.5 to 18.5kw 235 nde brg repl tri screw >18.5 to 55kw 236 nde brg repl tri screw >55 to 90kw 237 screw pump tripple screwmechanical seal replacement 238 m / seal repl tri screw upto 5.5 kw 239 m / seal repl tri screw >5.5 to 18.5kw 240 m / seal repl tri screw >18.5 to 55kw 241 m / seal repl tri screw >55 to 90kw 242 screw pump tripple screwoverhauling 243 o / h of tri screw upto 5.5 kw 244 o / h of tri screw >5.5 to 18.5kw 245 o / h of tri screw >18.5 to 55kw 246 o / h of tri screw >55 to 90kw 247 gear pump external gearoil seal / bearing replacement 248 brg / oilseal repl ex gear pump upto 5 kw 249 brg / oilseal repl ex gear pump>5 to18.5kw 250 gear pump external gearoverhauling 251 o / h ex gear pump upto 5 kw 252 o / h ex gear pump >5 to 18.5kw 253 diaphragm pumpsuction / discharge valve related job 254 suc / dis vlv job diaph pump upto 5.5 kw 255 diaphragm pumpdiaphragm replacement 256 diaph repl of diaph pump upto 5.5 kw 257 diaphragm pumpoverhauling 258 o / h of diaph pump upto 5.5 kw 259 plunger pumpsuction / discharge valve related job 260 suc / dis vlv repl plngr pump 7.5 kw 261 suc / dis vlv repl plngr pump 18.5 kw 262 suc / dis vlv repl plngr pump 110 kw 263 plunger pumpcylinder & plunger assembly. 264 cyl / plngr assy job plngr pump 7.5 kw 265 cyl / plngr assy job plngr pump 18.5 kw 266 cyl / plngr assy job plngr pump 110 kw 267 plunger pumpo / h of fluid end 268 o / h of fluid end plngr pump 7.5 kw 269 o / h of fluid end plngr pump 18.5 kw 270 o / h of fluid end plngr pump 110 kw 271 plunger pumpo / h of power end 272 o / h of power end plngr pump 7.5 kw 273 o / h of power end plngr pump 18..5 kw 274 o / h of power end plngr pump 110 kw 275 centrifugal fans / blowers, id / fd fanbearing replacement job 276 brg repl fans / blowers upto 5 kw 277 brg repl fans / blowers >5 to 18.5 kw 278 brg repl fans / blowers>18.5 to 55 kw 279 brg repl fans / blowers>55 to 110 kw 280 brg repl fans / blowers >1100 to 1800 kw 281 centrifugal fans / blowers, id / fd fanoverhauling 282 o / h of fans / blowers upto 5 kw 283 o / h of fans / blowers >5 to 18.5 kw 284 o / h of fans / blowers>18.5 to 55 kw 285 o / h of fans / blowers>55 to 110 kw 286 o / h of fans / blowers >1100 to 1800 kw 287 centrifugal fans / blowers, id / fd fan 288 damp adjmt fans / blowers upto 5 kw 289 damp adjmt fans / blowers >5 to 18.5 kw 290 damp adjmt fans / blowers>18.5 to 55 kw 291 damp adjmt fans / blowers>55 to 110 kw 292 damp adjmt fans / blowers >1100 to 1800kw 293 fans for finned tube coolersfan blade angle change job: 294 blade angle chng fin fan upto 30 kw 295 fans for finned tube coolersreplacement of fan blades and / or hubs 296 blade / hub repl fin fan upto 30 kw 297 fans for finned tube coolersoverhauling 298 o / h of fin fan upto 30 kw 299 gear box oil seal leak attending. 300 g.b oil seal repl upto 5 kw 301 g.b oil seal repl >5 to 18.5kw 302 g.b oil seal repl >18.5 to 55kw 303 g.b oil seal repl >55 to 90kw 304 g.b oil seal repl >200 to 300 kw 305 g.b oil seal repl >1200 to 1850 kw 306 g.b oil seal repl above 1850 kw 307 gear boxbearing replacement. 308 g.b brg repl upto 5 kw 309 g.b brg repl >5 to 18.5kw 310 g.b brg repl >18.5 to 55kw 311 g.b brg repl >55 to 90kw 312 g.b brg repl repl >200 to 300 kw 313 g.b brg repl repl >1200 to 1850 kw 314 g.b brg repl repl above 1850 kw 315 gear boxbabbit bearings repair / replacement. 316 g.b babbit brg repl >200 to 300 kw 317 g.b babbit brg repl >1200 to 1850 kw 318 g.b babbit brg repl above 1850 kw 319 gear boxoverhauling 320 o / h of g.b. upto 5 kw 321 o / h of g.b. >5 to 18.5kw 322 o / h of g.b. >18.5 to 55kw 323 o / h of g.b. >55 to 90kw 324 o / h of g.b. >200 to 300 kw 325 o / h of g.b. >1200 to 1850 kw 326 o / h of g.b. above 1850 kw 327 gear box replacement 328 repl of g.b. upto 5 kw 329 repl of g.b. >5 to 18.5kw 330 repl of g.b. >18.5 to 55kw 331 repl of g.b. >55 to 90kw 332 repl of g.b. >200 to 300 kw 333 repl of g.b. >1200 to 1850 kw 334 repl of g.b. above 1850 kw 335 blower twin lobetiming gears replacement 336 tmng gear repl lobe blwr upto 7.5 kw 337 tmng gear repl lobe blwr>7.5 to 22.5 kw 338 tmng gear repl lobe blwr>22.5 to 45 kw 339 tmng gear repl lobe blwr>45 to 100 kw 340 tmng gear repl lobe blwr>100 to 290 kw 341 blower twin lobende bearing / seal replacement 342 nde brg / seal repl lobe blwr upto 7.5 kw 343 nde brg / seal repl lobe blwr>7.5 to 22.5kw 344 nde brg / seal repl lobe blwr>22.5 to 45 kw 345 nde brg / seal repl lobe blwr>45 to 100 kw 346 nde brg / seal repl lobe blwr>100 to 290kw 347 blower twin lobede bearing / seal replacement 348 de brg / seal repl lobe blwr upto 7.5 kw 349 de brg / seal repl lobe blwr>7.5 to 22.5 kw 350 de brg / seal repl lobe blwr>22.5 to 45 kw 351 de brg / seal repl lobe blwr>45 to 100 kw 352 de brg / seal repl lobe blwr>100 to 290 kw 353 blower twin lobeoverhauling 354 o / h of lobe blwr upto 7.5 kw 355 o / h of lobe blwr>7.5 to 22.5 kw 356 o / h of lobe blwr>22.5 to 45 kw 357 o / h of lobe blwr>45 kw to 100 kw 358 o / h of lobe blwr>100 to 290 kw 359 agitator / mixeroverhauling 360 o / h of agitators upto 5 kw 361 o / h of agitators >5 kw to 18.5 kw 362 reciprocating compressor.coupling guard removal 363 cplg grd rmvl recpcomp upto 45 kw 364 cplg grd rmvl recpcomp >45 to 110kw 365 cplg grd rmvl recpcomp >110 to 460kw 366 reciprocating compressor.removal / repair and reinstallation of unloaders 367 unlodr repl recpcomp >110 to 460kw 368 reciprocating compressor.remv / ins / repl of suction / discharge valve 369 suc / dis vlv repl recpcomp upto 45 kw 370 suc / dis vlv repl recpcomp >45 to 110kw 371 suc / dis vlv repl recpcomp >110 to 460kw 372 reciprocating compressor.reconditioning of suc / dis valve 373 vlv recond recpcomp upto 45 kw 374 vlv recond recpcomp >45 to 110kw 375 vlv recond recpcomp >110 to 460kw 376 reciprocating compressor.cylinder / piston assembly. 377 pstn assy job recpcomp upto 45 kw 378 pstn assy job recpcomp >45 to 110kw 379 pstn assy job recpcomp >110 to 460kw 380 reciprocating compressor.cylinder maintenance 381 cylnd maint recpcomp upto 45 kw 382 cylnd maint recpcomp >45 to 110kw 383 cylnd maint recpcomp >110 to 460kw 384 reciprocating compressor.crankcase job. 385 crankcase job recpcomp upto 45 kw 386 crankcase job recpcomp >45 to 110kw 387 crankcase job recpcomp >110 to 460kw 388 reciprocating compressor.main bearing job 389 main brg repl recpcomp upto 45 kw 390 main brg repl recpcomp >45 to 110kw 391 main brg repl recpcomp >110 to 460kw 392 reciprocating compressor.small end bearing. 393 small end brg recpcomp upto 45 kw 394 small end brg recpcomp >45 to 110kw 395 small end brg recpcomp >110 to 460kw 396 reciprocating compressor.big end bearing. 397 big end brg recpcomp upto 45 kw 398 big end brg recpcomp >45 to 110kw 399 big end brg recpcomp >110 to 460kw 400 reciprocating compressor.connecting rod job. 401 cnt rod recpcomp upto 45 kw 402 cnt rod brg recpcomp >45 to 110kw 403 cnt rod brg recpcomp >110 to 460kw 404 reciprocating compressor.cross head assly job 405 crs hed asy recpcomp upto 45 kw 406 crs hed asy recpcomp >45 to 110kw 407 crs hed asy recpcomp >110 to 460kw 408 centrifugal compressor integral gear typedrive end bearing inspection 409 de brg repl cent comp 540 kw 410 de brg repl cent comp 750 kw 411 centrifugal compressor integral gear typenon drive end bearing inspection 412 nde brg repl cent comp 540 kw 413 nde brg repl cent comp 750 kw 414 steam turbine single stage 2 blade, back pressure ( horizontally split ) governor end bearing replacement 415 govr end brg repl upto 30 kw 416 govr end brg repl >30 to 90 kw 417 govr end brg repl >1200 to 1850 kw 418 steam turbine single stage 2 blade, back pressure ( horizontally split ) drive end bearing replacement 419 de brg repl upto 30 kw 420 de brg repl >30 to 90 kw 421 de brg repl >1200 to 1850 kw 422 steam turbine single stage 2 blade, back pressure ( horizontally split ) turbine shaft seal replacement 423 shft seal repl st upto 30 kw 424 shft seal repl st>30 to 90 kw 425 shft seal repl st >1200 to 1850 kw 426 steam turbine single stage 2 blade, back pressure ( horizontally split ) repair / replace of trip throttle valve 427 ttv repair steam turb upto 30 kw 428 ttv repair steam turb >30 to 90 kw 429 steam turbine ( multi stage horizontal ) condensing typende bearing replacement 430 nde brg repl multi stag st 1602 kw 431 steam turbine ( multi stage horizontal ) condensing typende bearing replacement 432 de brg repl multi stag st 1602 kw 433 miscellaneous job 434 replacement gt inlet air filter. ( high efficiency filter ) installed qty ( 1 set = 84 nos ) 435 replacement gt inlet air filter. ( pre filter, f 9 ) installed qty ( 1 set= 108 nos ) 436 replacement pac inlet air filter. ( high efficiency filter, e 12 ) installed qty ( 1 set= 48 nos filter ) 437 load gear & generator couplingload gear & generator coupling removal & fixing. 438 gas turbine & load gear couplinggas turbine & accessory gear box coupling removal & fixing. 439 alment chk betwen genrtr & gb.alignment check between generator & gear box. 440 almt chk recti betwen genrtr / gb 441 comp rem&re fixing of noise hood removal and re fixing of noise hood. integrally geared centrifugal compressor / n2 blower 442 rem&re fixing of noise hood per pannel removal and re fixing of noise hood. integrally geared centrifugal compressor / n2 blower 443 seal pot fluid top up for mechanical sealoil top up in seal pot by hand pump after taking out oil from oil dispenser unit upto 20 ltrs 444 hand pump mech seal repairdrain the liquid by opening small bore flanges, dismantle the hand pump, replace oil seal / spring / plunger etc internals as per requirement, box up, charge with liquid. 445 dewatering pump1.lifting the pump, dismantling the cover, cleaning and boxup lifting the pump, dismantling the cover, cleaning , replacement of oil seal, bearing and boxup 2.complete overhauling of the pump including...

National Thermal Power Corporation Limited - Bihar

33933385 procurement of lube oil system spares for ntpc barh compensator, 895, 61 08467 rev c, flender owgs 09:shut off valve owgs 09:screw pump owgs 09:shut off valve dwgs 09:double change over filter fltr elem, flender, owgs09.4226481 040 1 nrv, 35, flender, owgs09, type w5916 owgs 09:three way cock shut off vn.51 0.flender.owgs09...

Indian Oil Corporation Limited - Bihar

33000883 supply of axga169 rotary screw pump (coker feed pump) supply of axga169 rotary screw pump (coker feed pump) , supply of axga169 rotary screw pump , coker feed pump (item no: 301 p 302 a/b/c); as specified in material requisition. , charges for site supervision of erection, testing and commissioning of axga169 rotary screw pump , per diem charges for upto 8 hours work on normal working days. , overtime rate / hour beyond normal 8 hours work on normal working days. , overtime rate / hour for work on weekly off days / holidays (as applicable to refinery site). , charges for training at iocl barauni refinery site , per diem charges for upto 8 hours work on normal working days. , charges for 2 years operation and maintenance spares for axga169 rotary screw pumpas per boq sr. nos. 1.01. bidder to provide spares price breakup in 2 years spares boq4 sheet. => limited...

Indian Oil Corporation Limited - Bihar

31053807 supply of axga166 rotary screw pump supply of axga166 rotary screw pump , supply of axga166 rotary screw pump , fuel oil pump ( item no: 372 p 301, 302 ) ; as specified in material requisition. , standby pump for coker feed pump ( item no: 301 p 302 ) ; as specified in material requisition. , charges for site supervision of erection, testing and commissioning. , per diem charges for upto 8 hours work on normal working days. , overtime rate / hour beyond normal 8 hours work on normal working days. , overtime rate / hour for work on weekly off days / holidays ( as applicable to refinery site ) . , charges for training at iocl barauni refinery site , per diem charges for upto 8 hours work on normal working days. , charges for 2 years operation and maintenance spares for supply of axga166 rotary screw pump as per boq sr. nos. 1.01 and 1.02. bidder to provide spares price breakup in 2 years spares boq sheet. => limited...

Indian Oil Corporation Limited - Bihar

30924948 bids are invited for supply of trolley mounted single screw pump with motor & other accessories at barauni refinery. (q3) total quantity : 1...

Indian Oil Corporation Limited - Bihar

30441059 bso engg providing sewage treatment plant ( stp ) , water treatment equipment and supply pumps for our new green office building of bihar state office patna stp & water treatment equipment and supply pump 2 section 1 : sewage treatment plant 3 mbbr based ( moving bed bio reactor follwed by ultrafiltration ) 4 design, supplying, installing, testing & commissioning of sewagetreatment plant of45 kld 5 the contractors scope of work shall also include following: 6 process flow sheet 7 hydraulic profile 8 layout of plant room within given space ( refer attached drawing ) . 9 basic and detailed drawings of structures. 10 equipment, piping, and electrical specifications. 11 piping and electrical & instrumentation drawings. 12 preparation of project report for submission to pollution controlboard and statutory authority and obtaining approvals. 13 all civil works ( including ga and rcc details ) as per of civil scope. [ civil work will be in scope of civil contractor ] 14 fabrication required in plant. 15 supply and installation of all electro mechanicals as per the scope. 16 erection and commissioning of plant. 17 performance guarantee & warrantees. 18 training of employer’s personnel for operation of the plant. 19 manual on operation and maintenance of the plant. 20 operation and maintenance of stp for two years after successful commissioning of the plant. 21 inlet sewage characterstics 22 flow rate 45 kl / day 23 ph 6.0 – 8.5 24 bod 250 350 mg / l 25 s. solids 200 300 mg / l 26 cod 400 600 mg / l 27 oil & grease 15 20 mg / l 28 tkn 35 40 mg / l 29 phospate 10 mg / l 30 note: plant should be able to operate at lower range of above parameters. 31 effluent discharge standard after treatment 32 ph 6.0 – 7.5 33 bod less than 10 mg / l 34 s. solids less than or equal to 20 mg / l 35 cod less than or equal to 50 mg / l 36 oil & grease less than or equal to 1 mg / l 37 turbidity less than 1 ntu 38 total nitrogen less than 10 mg / l as n 39 total phosphorous less than 2 mg / l as pcb 40 note: ensuring that the above parameters are within the statutory compliance limit is the responsibility of the stp contractor. 41 sewage treatment plant shall include the following stp tanks: 42 screen chamber 43 oil & grease chamber 44 equalization tank / sump 45 anoxic tank 46 mbbr tank ( 2 no. ) 47 tube settler tank 48 filter feed tank 49 clear water tank ( primary treated water ) 50 flushing water tank 51 sludge holding tank 52 soft water tank 53 sludge holding tank 54 note: contractor shall ensure submission of detailed ga drawings ( plan & section ) , p & i diagram, schematic diagram for the mentioned component in soq and additional component if so required for the complete working of the stp and got it approved by the owner’s architect / project manager / consultants. 55 tanks in civil are tentative and that need to be varified by the vendor before quoting and after comming on the board it shall be stp vendors resposibility any changes required at site and shall be in done by stp contractor. location, size and dimesional detail shall be provided by the stp vendor in the shop drawing. 56 all manhole covers shall be double seal medium duty ci alongwith frame and lockable arrangement and shall be in scope of civil contractor. location and other relevant details of the same shall be provided by the stp vendor in the shop drawing. 57 the sewage treatment plant shall comprise of following: 58 pretreatment devices and plant accessories 59 supply, installation, testing & commissioning of 300 mm x 600 mm high stainless steel construction coarse screen ( including one standby ) with lifting arrangement.the perforation in the screen shall be 8 mm. 60 supply of ms hot dip galvanized puddle flanges in accordance to bs:10 table d as required to be provided ( in the structural slab and wall ) of various diameters. puddle flanges shall be provided for all the structural component of the stp. the installation of the puddle flanges shall be carried out by the civil contractor in accordance to the civil ga drawing ( to be prepared by the stp contractor ) at the required levels& position; under the supervision of the stp contractor 61 supply of plastic step / foot rest ( @ 300 mm c / c ) with polypropelene compound injection molded around 12 mm dia ( fe 415 ) steel reinforcing bar. provision of the foot rest is envisaged in various tanks / components of the stp for the purpose of accessability. the installation of the foot rest shall be done by the civil contractor as per civil ga drawing 62 supply, installation, testing & commissioning of cilight duty / msep rectangular manhole cover with frame for the feasibility of access in the tank 63 size : 600 x 900 weight as per mfg. stds. 64 supply of vent pipes of 100 mm dia vent pipe with mosquito proof grating for treated water tank suitable for the ventilation purpose of the various tanks 65 supply, installation, testing & commissioning of electronic type level controller for automatic operation of the system with high / low level alarm complete with auxillary no / nc contacts for ( to be provided for all the tanks and plant room sump ) 66 supply, installation, testing & commissioning of sight tube ( of 3.5 to 4.5 m length ) with isolation valve at top / bottom, demarcation on tube & for making the installation complete for treated water tanks. 67 supply of submersible mixer for mixing in anoxic tank: 68 moc: pp / ss blades with ci / ss casing 69 mechanical equipment: pumps, blowers etc. 70 supply, installation, testing & commissioning of non clogging type pumps capable of handling solids upto 35 mm having ci casing & ci impeller complete with all accessories, motor of required capacity. delivery header with isolation valve, pressure gauge on delivery line with isolation cock, level controller as per item no. 1.7 along with control panel ( with wiring ) to control the level of sump automatically. pumpsshall have following duty: the provsion of local push button near the pumps should be considered. 71 submersible sewage pumps ( non cutter type ) for transfer of raw sewage in eqt ( 1 working & 1 standby ) : 72 flow rate ( each ) = 3 m3 / hr 73 head =8 10m 74 solid handling size for this pump = 20mm 75 submersible sewage pumps ( non cutter type ) for transfer of stp plant room sump tank ( 1 working + 1 standby ) 76 flow rate ( each ) = 3.0 m3 / hr 77 head =12 15 m 78 solid handling size for this pump = 20 mm 79 cost shall be inclusive of pvcflexible hose pipe ( for piping submreged in effluent ) with pvc / gipiping ( for piping non submerged in effluent ) 80 provision of guide ropes to guide submersible pump from upper level to operational level in sump basin with channels / angle section shall be made by the stp contractor. ( if required ) 81 air diffusionsystemshall include the following: 82 air blower for equilisation , sludge tank & aeration tank : air blowers of suitable hp suitable for 415 ± 10% volts, 3 phase, 50 cycles a / c supply. numbers & capacity as per requirement with standby to be specified by vendor. capacity: 100 m3 / hr @ 0.4 kg / cm2 qty ( 1w+1s ) 83 air piping shall comprise of pvc pipedroppers / laterals with gi header complete with all fittings such as valves, nrv, strainer, tees, crosses, plugs, sockets, elbows, reducers, supports & clamps, puddle flanges etc. contactor to submit detailed p & i indicating their proposal. 84 non clog, self cleaning type air dispersion system capable of handling 3 5 cfm of air with oxygen transfer efficiency of3 4% per / meter water depth. air dispersion grid shall be assembled in modular form so that they can be replaced / repaired easily from plat form at the top. ( imported fine bubble membrane diffusers ) . 85 supply, installation, testing & commissioning of mbbr media consisting of virgin pe / pp carrier modules with surface not less than 400 m2 / m3. the media qty. shall be calculated based on 6 12 gm / m2 area. also supply and fixing of tube deck media of reputed make with suitable quantity. the surface area of tube deck shall be 11 m2 / m3 and the quantity will be based on max 2.0 m / h velocity. 86 note: contractor shall consider the media as required for the stp and include in his quote. 87 bronze ball valve and air dispersion grid as required for stp as described above. 88 note : air dispersion system shall be provided for equalization tank, anoxic tank, mbbr tanks and sludge holding tank. 89 providing and fixing all piping ( as described below ) and isolation control valves for making the system complete. 90 ms: exposed air pipe, frontal pipe for vessels 91 upvc piping: waste water pipe, submerged pipe, interconnecting pipe line afterdelivery header of pumps, tank overflow pipe etc. 92 providing, fixing, testing and commissioning of single stage, horizontal, centrifugal, 2 pole, 50 hz, ac, monoblock pumps ( as per is : 9079 ) incorporating c.i. casing and frame, stainless steel shaft, bronze / ss impeller, tefc induction motor directly coupled to the pump, ip44 protection, class b insulated, c.i. body, hydraulically and dynamically balanced to give vibration free operation, with mechanical seal arrangement, fixed on a base plate with suitable vibration eliminator pads complete with level controller, pressure switch , necessary wiring / cabling ( from tank to pumps & panel ) , pressure gauge, valves, vibration eliminators on the delivery side and strainer on suction side, including non return valve and isolating valves on suction and delivering sides as required, including suction, delivery headers and interconnecting piping ( upvc ) complete in all respects. 93 capacity : 6.0 m3 / h 94 head : 30 35 m 95 rpm : 2900 96 ( 1 working + 1 standby ) 97 ( filter feed pumps ) 98 capacity : 5.0 m3 / h 99 head : 70 m 100 rpm : 2900 101 ( 1 working + 1 standby ) 102 ( flushing water transfer pumps ) 103 capacity : 7 m3 / h 104 head : 35 m 105 rpm : 2900 106 ( 1 working + 1 standby ) 107 ( softner feed pumps ) 108 capacity : 10.0 m3 / h 109 head : 70 m 110 rpm : 2900 111 ( 1 working + 1 standby ) 112 ( soft water transfer pumps ) 113 capacity : 3.0 m3 / h 114 head : 25 30 m 115 rpm : 2900 116 ( 1 working + 1 standby ) 117 ( irrigation pumps ) 118 supplying, installation, testing and commissioning of horizontal centrifugal sludge recirculation pumps for tank coupled with motor of capacity 3.375 m3 / h at 6 to 8 m head of c.i. parts and mechanical seal complete with isolation and non return valves. ( 1 working + 1 standby ) 119 supply, installation, testing & commissioning of vertical self supporting multigrade sand filter in frp / grp construction ( the filter shall be designed for a tested presure of min. 5.5 kg / cm2 ) pressuregaugesatinlet&outlet, sample cock, upvc / cpvc face piping, automatic mpv along with prvision for manual multiport valve andallaccessories, withinitialchargeoffiltermediafor multigrade & activated carbon filter, testing and commissioning complete 120 multi grade filter 121 capacity / flow rate:6.0 m3 / hr 122 design velocity:15 m / hr 123 operating pressure :3.0 to 3.5 kg / sq.cm 124 test pressure:5.5 kg / sq.cm 125 suggested dia meter : 700mm ø 126 moc: frp / grp ( filament winded ) 127 activated carbon filter 128 capacity / flow rate:6.0 m3 / hr 129 design velocity:15 m / hr 130 operating pressure :3.0 kg / sq.cm 131 test pressure:5.5 kg / sq.cm 132 suggested dia meter : 700mm ø 133 activated carbon :i / vshould be 600 134 moc: frp / grp ( filament winded ) 135 softener 136 supply, installation, testing and commissioning of water softening plant. the water softener vessel in frp / grp construction ( the filter shall be designed for a tested presure of min. 5.5 kg / cm2 ) pressuregaugesatinlet&outlet, sample cock, upvc / cpvc face piping, automatic mpv along with prvision for manual multiport valve andallaccessories, withinitialchargeofion exchange resin. the inner distribution system and the under bed draw off system shall be of hub & lateral type with top & bottom strainers of . softener shall be supplied with initial charge resin with supporting media like silex, gravel etc. outlet fitting complete along with regeneration assembly comprising of ejector, brine suction valve and all associated pipe work. 137 the brine tank shall be provided with salt saturation arrangement including suitable hdpe brine tank of300 liters / as per design capacity complete including piping, cpvc / upvc valves and accessories of required size. 138 softener size: 139 flow rate : 7 m3 / hr 140 input hardness considered 600 ppm ( considered ) 141 output hardness less than 50 ppm 142 moc frp / grp ( filament winded ) 143 obr 50 kl 144 operating pressure 3.0 kg / sq.cm 145 test pressure 5.5 kg / sq.cm 146 size: 700 mm dia x 1800 mm hos with 500 liters resin 147 supplying, installing, testing and commissioning of dosing system consisting of one hdpe tank of 100 litres capacity with a positive displacement diaphragm dosing pump having variable flowrate of 0 6 lph. the motor shall be suitable for operation at 240 v / single phase / 50 hz. supply. the pump shall be supplied complete with necessary polypropylene piping, valves, strainers, low level switch andinjection fittings. the pump shall be speed & stroke control. 148 providing, installing, testing and commissioning ofskid mounted ultra filtration ( uf ) system for further polishing treated effluent and capable of producing 8 m3 / hour of polished water meeting the requirements. the system shall be complete with uf feed pumps ( 1w+1s ) , backwash cum cip pumps ( 1w+1s ) , cartridge filter, uf membranes flushing / cleaning system, complete instrumentation for automation and monitoring, rotameters, pressure gauges, interconnecting pipework, electrical cabling and switchgear, all complete as described in scope of work enclosed herewith.note: the process and the control system of ultra filtration ( uf ) package shall be in complete conformity of the uf membrane manufacturer. the complete system of ultra filtration including its skid, mmembrane, piping, pumps, automation valves must be factory assembled by the approved system makes only. 149 supplying, installing, testing & commissioning of ultravoilet dis infection unit. the unit shall have over 99.9 % bacterial reduction from inlet to outlet. the dis infection chamber shall be constructed of ss 316l on all welted parts. the uv lamp shall be of low pressure mercury vapour type with hard glass enclosure, the sockets shall be water tight & vibration resistant. the lamp life shall be rated for 6000 hours. the unit shall be complete with temperature safety control, lamp out alert circuit & uv radiometer with 4 – 20 ma output. 150 the uv unit shall have with reactor, cabinet housing, cabinet cooling, treatment chamber, electrical panel, temperature safety control, lampout alert and uv monitoring readout panel.the uv dosage should be > 60, 000 uw – sec / sq.cm. the lamps should be selected based upon the flow requirement of respective unit. 151 flow rate : 3 m3 / hour [ at outlet of irrigation water transfer pumps ] 152 flow rate : 5 m3 / hour [ at outlet of flushing water transfer pumps ] 153 flow rate : 10 m3 / hour [ at outlet of soft water transfer pumps ] 154 supply , installation , testing and commissioning of hydraulic filter press of size 12 x 12 with 7 no of plates with 1 set ( 1 working + 1 standby ) of screw pumps to feed to filter press as per the complete set as per the vender specification 155 supply of microprocessor based electo magnetic flow meter for total plant capacity of 45 kld with pulsed dc excitation having automatic zero correction with bi directional flow measurement , compact instrument version with measuring sensor ( primary ) and amplifier integrated in one mechanical unit ( suitable for required flow range, inlet / outlet connections, ip 67 protection, measuring pipe material ss 304, electrode material ss 316 with 16 character x 2 lines lcd alphanumeric display for flow rate, totalizer, diagnostic message, flow alarms with high & low flow programmable throught the range. ) with all accessories for inlet flow measurement before screen chamber. 156 supply, installation, testing & commissioning of digital turbine type water meter with sensor for treated water monitoring 157 flow rate : 3 m3 / hour [ at outlet of irrigation water transfer pumps ] 158 flow rate : 5 m3 / hour [ at outlet of flushing water transfer pumps ] 159 flow rate : 10 m3 / hour [ at outlet of soft water transfer pumps ] 160 approval from pollution board including consent to operate at initial & various other stages of works including preparation of report / drawings as per pollution board requirement, arrangement of raw sewage. contractor shall include the cost of all chemicals consumed and the cost of such items of works which are not explicitly mentioned above, but are mandatory to have pollution board approval. 161 bypass arrangement from equalization tank to municipal sewer includingfittings, isolation valves / nrv / accessories within the plant room at the discharge of the sewahe bye pass pump upto discharge header. 162 providing & fixing of online monitoring system comprising of following : 163 measuring range: as required 164 method: uv / visible different optical absorption spectroscopy, wave length range 200 800 nm. 165 technology : uv visible spectroscopy 166 sample flow: 0 5 lpm 167 power: 230v ac, 30 w 168 range ( cod ) : 0~5~200 mg / l 169 interval: 60 sec 170 probe depth: < 10 m 171 working temp: 5 deg cel ~ 45 deg cel 172 auto cleaning: yes 173 probe weight: 5 kg 174 power supply: 12 24vdc ( + / 10% ) 175 sample temperature: plus 2…..........plus 40 deg cel 176 ambient temperature: plus 2…..........plus 40 deg cel 177 inflow velocity:0.1 10 m / s 178 mild steel fabrication works for various sections like operating platforms, stairs & ladders, base frame of tube settler media ( including frp / resin coat ) supporting strcutures within the stp plant room required for the stp piping supports / cable tray supports. all ms fabricated structures must be properly painted with epoxy or rubber coats for corrotion protection after having put 2 coats of redoxide primer. 179 electrical installation for stp 180 design, fabrication, assembling, wiring, supply, installation, testing and commissioning of motor control center fabricated out of 14 gauge crca sheet steel. cable gland plates shall be provided on top as well as at the bottom of the panels. panels shall be treated with all anticorrosive process before painting as per specifications with 2 coats of red oxide primer and final approved shade of powder coated paint. 2 nos. earthing terminals shall be provided for 3 phase, 4 wire, 50 hz supply system. lifting hooks shall also be provided in case of large panels. approval shall be taken for each panel before fabrication. quoted rates shall be inclusive of cables, ( in accordance to cable trays specification ) with earthing from panel to each motor / equipment. 181 motor control centre : 182 incoming 183 63 amps tpn mccb with the following accessories: 184 0 500 volts 96 x 96 mm square electronic voltmeter with selector switch shall be protected by2 amps tp mcb.1 set 185 0 60 amps 96 x 96 mm square electronic ammeter with selector switch and 100. / 5 amps 10 va cl:1 cts. 1 set 186 phase indicating lamps shall be protected by 2 amp sp mcb 3 sets 187 1 set of on / off indication lamps 188 bus bar 189 100 amps tpn aluminum bus bar with heat shrinkable insulation sleeves. 190 outgoing 191 a. 2 nos. suitable rating mpcb for 0.75 kw dol starter and outgoing feeder to raw sewage transfer pumps motor ( including 1nos. standby ) .each compartment shall contain auto / manual selector swtich and indicating / pushbutton lamps with mcb for on / off / trip of motor. 192 b. 2 nos. suitable rating mpcb for 0.75 kw dol starter and outgoing feeder to plant room sump pumps motor ( including 1nos. standby ) .each compartment shall contain auto / manual selector swtich and indicating / pushbutton lamps with mcb for on / off / trip of motor. 193 c. 2 nos. suitable rating mpcb for 3.75 kw direct on line starterand outgoing feeder to air blowers ( including 1 no. standby ) . each compartment shall contain auto / manual selector switch andindicating lamps with mcb’s for ‘on / off / trip status of motor. 194 d. 2 nos. suitable rating mpcb for 0.375 kw direct on line starter and outgoing feeders to sludge recirculation pumps ( including 1 no. standby ) . compartment shall contain auto / manual selector switch andindicating lamps with mcb’s for‘on / off / trip’ status of motor. 195 e. 2 nos. suitable rating mpcb fornos. 1.1 kw direct on line starter and outgoing feeders to filter feed pumps ( including 1 no. standby ) . each compartment shall contain auto / manual selector switch and indicating lamps with mcb for ‘on / off / trip’ status of motor. 196 f. 2 nos. suitable rating mpcb fornos. 1.1 kw direct on line starter and outgoing feeders to softener feed pumps ( including 1 no. standby ) . each compartment shall contain auto / manual selector switch and indicating lamps with mcb for ‘on / off / trip’ status of motor. 197 g. 2 nos. suitable rating mpcb fornos. 1.1 kw direct on line starter and outgoing feeders to uf feed pumps ( including 1 no. standby ) . each compartment shall contain auto / manual selector switch and indicating lamps with mcb for ‘on / off / trip’ status of motor. 198 h. 2 nos. suitable rating mpcb fornos. 2.2 kw direct on line starter and outgoing feeders to uf backwasg cum cip pumps ( including 1 no. standby ) . each compartment shall contain auto / manual selector switch and indicating lamps with mcb for ‘on / off / trip’ status of motor. 199 i.2 nos. suitable rating mpcb fornos. 1.1 kw direct on line starter and outgoing feeders to irrigation water transfer pump ( including 1 no. standby ) . each compartment shall contain auto / manual selector switch and indicating lamps with mcb for ‘on / off / trip’ status of motor 200 j.2 nos. suitable rating mpcb fornos. 2.2 kw direct on line starter and outgoing feeders to flushing water transfer pump ( including 1 no. standby ) . each compartment shall contain auto / manual selector switch and indicating lamps with mcb for ‘on / off / trip’ status of motor 201 k.2 nos. suitable rating mpcb fornos. 3.0 kw direct on line starter and outgoing feeders to soft water transfer pump ( including 1 no. standby ) . each compartment shall contain auto / manual selector switch and indicating lamps with mcb for ‘on / off / trip’ status of motor 202 l.2 nos. suitable rating mpcb fornos. 0.75 kw direct on line starter and outgoing feeders to screw pumps ( including 1 no. standby ) . each compartment shall contain auto / manual selector switch and indicating lamps with mcb for ‘on / off / trip’ status of motor 203 m. supply for dosing pumps, uvs, necessary cable alleys, internal / cabling, wiring, cabling from mcc to various pumps / equipment and interlocking, gi cable trays earthing for all equipment shall also included. 204 all mccbs / mcbs shall be of 25 kabreaking capacity and suitable for motor duty application. 205 all motor starters shall be provided with automatic level controller. 206 provision shall be made for providing potential free contacts to all pumps starters 207 note: ratings of all starters may vary as per actual selection of equipment & should be approved by consultant before manufacturing 208 mcc – 1 for stp as described above 209 section 2 : water treatement equipment & supply pumps 210 providing, fixing, testing and commissioning of single stage, horizontal, centrifugal, 2 pole, 50 hz, ac, monoblock pumps ( as per is : 9079 ) incorporating c.i. casing and frame, stainless steel shaft, bronze / ss impeller, tefc induction motor directly coupled to the pump, ip44 protection, class b insulated, c.i. body, hydraulically and dynamically balanced to give vibration free operation, with mechanical seal arrangement, fixed on a base plate with suitable vibration eliminator pads complete with level controller, pressure switch , necessary wiring / cabling ( from tank to pumps & panel ) , pressure gauge, valves, vibration eliminators on the delivery side and strainer on suction side, including non return valve and isolating valves on suction and delivering sides as required, including suction, delivery headers and interconnecting piping ( g.i. heavy class ) complete in all respects. 211 capacity : 7.5 m3 / h 212 head : 70 m 213 rpm : 2900 214 ( 1 working + 1 standby ) 215 ( domesticwater transfer pumps ) 216 submersiable pump 217 supply, installation, testing and commissioning of continuous duty submersible centrifugal non clogging drainage pumps complete with 3 phase motor with all necessary protection and mechanical seal etc. complete with all ancillaries including float type level controllers, electrical control panels fabricatd from 14 gauge crca sheet volt meter ammeter with selector switch, tpmcb, 5 va cl : cts, phase indicating lamps protected by 2 amp sp mcb, dol starter, necessary wiring, cable alleys, earthing, interlocking, starter with automatic float type level controller, providion of high level alarm, sequence timer, potential free contact to starter for connection to bas, both pumps may run simultaneously at pre determind level. the submersible sump pump shall be provided with guide wire for lifting and lowering pump, m.s. galvanized lifting chain, duck foot bend. ( 1working + 1standby ) 218 vendor to submit proposed pump model with duty curve. 219 flow rate: 15 lps each 220 head: 15 20 mts 221 solid handling : 30 40 mm 222 location : basment 223 purpose : drainage basment 224 moc:ss body ss impeller & shaft 225 flow rate: 10 lps each 226 head: 15 20 mts 227 solid handling : 20 30 mm 228 location : basment 229 purpose :plant room 230 moc:ss body ss impeller & shaft 231 flow rate: 2 lps with cutterpump 232 head: 15 20 mts 233 location : basment 234 purpose : basement toilet sewage pump 235 moc:ci body bronze impeller & shaft 236 providing, fixing, testing and commissioning of single stage, horizontal, centrifugal, 2 pole, 50 hz, ac, monoblockpumps ( as per is : 9079 ) incorporating c.i. casing and frame, stainless steel shaft, bronze / ss impeller, tefc induction motor directly coupled to the pump, ip44 protection, class b insulated, c.i. body, hydraulically and dynamically balanced to give vibration free operation, with mechanical seal arrangement, fixed on a base plate with suitable vibration eliminator pads complete with level controller, necessary wiring ( from tank to pumps & panel ) , pressure gauge on the delivery side and strainer on suction side, including non return valve and isolating valves on suction and delivering sides as required, including suction and delivery headers complete in all respects. 237 filter feed pump ( 1 working + 1 standby ) 238 flow rate ( each ) =3.75 m3 / hr 239 head =30 35 m 240 purpose : raw to domestic 241 location : plumbing plant room 242 filter feed pump ( 1 working + 1 standby ) 243 flow rate ( each ) =3.75 m3 / hr 244 head =30 35 m 245 purpose : rain waterto raw 246 location : plumbing plant room 247 supply, installation & testing and commissioning of vertical floor mounted filterof suitable size, provided with an inlet distributor. the vessel material of m.s with frp lining / epoxy coating with g.i. frontal piping , inter connection, suction & delivery header and valves ( c.i. ) , back wash system & filter media etc. complete with standard fittings like access cover, pressure gauge at inlet & outlet, sampling cock, rinse drain valve, air vent valve with piping, bolts, nuts & rubber gaskets. 248 note: all the frontal piping, valves and their fitting should be designed on 1.5m / s velocity 249 multi grade filter 250 capacity / flow rate:3.75 m3 / hr 251 filteration rate : 18000 l / sqm / hr 252 operating pressure :3.0 kg / sq.cm 253 test pressure:5.5 kg / sq.cm 254 purpose : raw to domestic 255 moc m.s. with frp linning 256 activated carbon filter 257 capacity / flow rate:3.75 m3 / hr 258 filteration rate : 15000 l / sqm / hr 259 operating pressure :3.0 kg / sq.cm 260 test pressure:5.5 kg / sq.cm 261 purpose : raw to domestic 262 moc m.s. with frp linning 263 multi grade filter 264 capacity / flow rate:3.75 m3 / hr 265 filteration rate : 18000 l / sqm / hr 266 operating pressure :3.0 kg / sq.cm 267 test pressure:5.5 kg / sq.cm 268 purpose : rain waterto domestic 269 moc m.s. with frp linning 270 softener 271 supply, installation, testing and commissioning of water softening plant. the water softener vessel shall be constructed of m.s material with epoxy coating. the inner distribution system and the under bed draw off system shall be of hub & lateral type / riser tube with top & bottom strainers of . softener shall be supplied with initial charge resin with supporting media like silex, gravel etc. the softener shall be complete with pressure gauge at inlet & outlet, sample cock, g.i face piping / interconnected piping, multiport valve ( control valve ) . overflow & drain, outlet fitting complete regeneration assembly comprising of power valve, ejector, brine suction valve and all associated pipe work. a density meter for brine shall be included. 272 salt saturation arrangement: 273 the brine tank shall be provided with salt saturation arrangement including suitable hdpe brine tank of 2 regeneration capacity complete with resins of approved quality and make complete with bypass arrangement including piping, ci valves ( 3 nos. ) and accessories of required size. 274 plant sizes: 275 capacity / flow rate 3.75 m3 / hr 276 input hardness considered 600 ppm ( considered ) 277 output hardness less than 150 ppm 278 moc ms with epoxy 279 obr 30 kl 280 operating pressure 3.0 kg / sq.cm 281 purpose : rain waterto domestic 282 test pressure 5.5 kg / sq.cm 283 supplying, installing, testing and commissioning of dosing system ( for domestic water treatment plant ) consisting of one hdpe tank of 100 litres capacity with a positive displacement diaphragm dosing pump having variable flowrate of 0 6 lph. the motor shall be suitable for operation at 240 v / single phase / 50 hz. supply. the pump shall be supplied complete with necessary polypropylene piping, valves, strainers, low level switch andinjection fittings. the pump shall be speed & stroke control. 284 electrical installation 285 fabrication, wiring, supply of motor control centre shall be fabricated out of 14 gauge crca sheet steel in form in 3b formation with reinforcement of suitable size angle iron, channel ‘t’ sections irons and / or flats wherever necessary. cable gland plates shall be provided on top as well as at the bottom of the panels. panels shall be treated with all anticorrosive process before painting as per specifications with 2 coats of red oxide primer and final approved shade of powder coated paint. 2 nos. earthing terminals shall be provided for 3 phase, 4 wire, 50 hz supply system. lifting hooks shall also be provided in case of large panels. approval shall be taken for each panel before fabrication. cadmium plated hardware shall be used in fabrication of panels. quoted rates shall inclusive of cables, cable trays, control cabling, earthing ( in accordance to specification ) with earthing from panel to each motor / equipment. 286 mcc –1 for plumbing system 287 incoming 288 100 amps tpn mccb with the following accessories: 289 a. 0 500 volts 96 x 96 mm squarevoltmeter with selector switch protected by2 amps tp mcb. 1 set 290 b. 0 100 amps 96 x 96 mm square ammeter with selector switch and 160 / 5 amps 10 va cl:1 cts. 1 set 291 c. phase indicating lamps protected by 2 amp sp mcb 3 set 292 bus bar 293 160 amps tpn ( 25 ka ) aluminium bus bar with heat shrinkable insulation sleeves. 294 outgoings 295 a.2 nos. suitable rating mpcb fornos. 3.0kw direct on line starter and outgoing feeders to domestic watertranfer pump ( including 1 no. standby ) . each compartment shall contain auto / manual selector switch and indicating lamps with mcb for ‘on / off / trip’ status of motor 296 b. 2 nos. suitable rating mpcb for 1.5 kw dol starter and outgoing feeder to filter feed pump motor ( including 1 nos. standby ) .each compartment shall contain vaf meter, auto / manual selector swtich and indicating / pushbutton lamps with mcb for on / off / trip of motor. ( raw to domestic ) 297 c. 2 nos. suitable rating mpcb for 1.5 kw dol starter and outgoing feeder to filter feed pump motor ( including 1 nos. standby ) .each compartment shall contain vaf meter, auto / manual selector swtich and indicating / pushbutton lamps with mcb for on / off / trip of motor. ( rain water to raw ) 298 d.2 no. suitable mccb for 5.0 kw outgoing feeders to borewell starter panel. each compartment shall contain vaf meter, auto / manual selector switch and indicating lamps with mcb for ‘on / off / trip’ status of motor 299 e.2 no. suitable mccb for 3.0 kw outgoing feeders to basementsump pump panel. each compartment shall contain vaf meter, auto / manual selector switch and indicating lamps with mcb for ‘on / off / trip’ status of motor ( 1 working and 1 standby ) 2 set 300 f. spare mcb’s of following capacities: 301 i. 40 amps tpn mcb’s 2 nos. 302 ii. 63 amps tpn mcb’s 2 nos. 303 a. all mccbs shall be of 25 ka breaking capacity and suitable for motor duty application. 304 b. provision shall be made for providing potential free contacts to all pumps starters for connection to bas 305 c. provision shall be made to ensure system protection from dry running of the pump 306 d. necessary cable alleys, internal wiring, and interlocking, earthing for all equipment shall also included 307 mcc 1for plumbing system as described above....

National Thermal Power Corporation Limited - Bihar

29880911 supply of spares for hp 1103 mill lub oil systems stage 2 of barh stpp. supply of spares for hp 1103 mill lub oil systems stage 2 of barh stpp. , plate pack with bolting for cplg rak 450 , bolts with buffer for coupling rak 450 , owtm 09:screw pump , owtm 09:pressure relief valve , owtm 09:duplex filter , owtm 09:compensator , owtm 09:compensator , owtm 09:filter element => limited...

National Thermal Power Corporation Limited - Bihar

25443494 supply of southern lubrication make lube oil system spares of 2x250 mw supply of southern lubrication make lube oil system spares of 2x250 mwunits of ntpc barauni tps . , 15lpm:3 way ball valve , 15lpm:ball valve , 15lpm:filler breather , 15lpm:level guage , 15lpm:needle valve , 15lpm:non return valve , 15lpm:sight flow indicator , 15lpm:sight flow indicator , 15lpm:scuction strainer , 15lpm:throttle valve , 15lpm:oil cooler , 15lpm:pressure relief valve , 15lpm:pressure relief valve , 15lpm:screw pump , counter balance valve , filter element for duplex oil filter , filter element for id fan , suction strainer , complete oil cooler , coupling , s8a:l . o . level gauge , sight flow indicator for lub oil system , screw pump , filler breather for i . d fan lub oil tank , bbd 4760:cooler , filter element type sp3f , screw pump...

Kanti Bijlee Utpadan Nigam Limited - Bihar

24750873 procurement of lube oil pump for pa , fd , aph , id and mill of stage 2 procurement of lube oil pump for pa , fd , aph , id and mill of stage 2 kbunl , t3si 52/40:pump comp . assly , lop of pa fan of stg iii , screw pump lop aph st iii , lop of id fan stg iii , gear oil pump 70lpm ( 7 . 2hp ) ...

Indian Oil Corporation Limited - Bihar

12578274 design manufacturing testing inspection and supply of positive displacement pump ( screw pumps ) , positive displacement pump ( screw pumps )...