Department Of Science And Technology - Bihar

46339844 tender for supply of mechanical engineering laboratory equipment for government polytechnic gulzarbagh patna 7 1 models and charts 2 sample production/construction drawings 3 drawing equipment’s and instruments 4 differential axle and wheel 5 simple screw jack 6 worm and worm wheel 7 single purchase crab winch 8 double purchase crab winch 9 universal force table 10 beam reaction apparatus 11 friction apparatus for motion along horizontal and inclined plane 12 set up for belt friction apparatus 13 fly wheel apparatus 14 models for projection and demonstration 15 perform brinell, rockwell and vicker’s hardness testers 16 combined shear force and bending moment apparatus 17 slope and deflection of beam apparatus 18 torsion testing machine 19 petrol engine 20 diesel engine 21 different types of boilers 22 boiler mounting and accessories 23 heat exchanger 24 vernier calipers & micrometers 25 plug gauge 26 steel ring gauges 27 vernier height and depth gauge 28 micrometer depth gauge 29 sine bar, sine centre 30 autocollimator 31 differential pressure bellows 32 thermocouple tutor 33 digital vernier caliper 34 digital micrometer 35 different types of cams, followers and cam/follower arrangements 36 various belt drives, chain and sprocket, various gear drives. 37 different belts in different arrangements 38 working models of gear trains all types. (simple, compound, reverted, epicyclical). 39 governors all types 40 various types of brake assemblies 41 dynamometers all types 42 various types of clutch assemblies. 43 static and dynamic balancing apparatus 44 edm 45 working models of reciprocating air compressor 46 vcr test rig 47 refrigeration system 48 var test rig 49 air conditioning test rig 50 natural convection apparatus/ test rig 51 forced convection apparatus/test rig 52 thermal conductivity apparatus 53 stefan boltzmann setup 54 thermal conductivity apparatus for composite wall 55 orifice meter setup for measurement of discharge 56 reciprocating pump test rig 57 centrifugal pump test rig 58 pelton wheel test rig 59 kaplan turbine test rig 60 francis turbine test rig 61 impact of jet apparatus 62 reynolds apparatus 63 metacentric height apparatus 64 lathe machine 65 drilling machine 66 wood working tools 67 vice 68 work benches 69 fitting tools 70 welding machine 71 gas welding and hand tools 72 arc welding and hand tools 73 sheet metal and hand tools 74 tig welding setup 75 mig welding setup 76 spot welding setup 77 seam welding machine 78 grinding machine 79 vernier calipers & micrometers 80 vernier height gauge. 81 depth gauge 82 screw thread micrometer 83 screw pitch gauge 84 westons differential pulley block 85 westons differential worm geared pulley block 86 jib crane 87 models of geometrical figures 88 torsions of bars apparatus 89 extension and compression of springs apparatus 90 thermometer and pressure gauges of different types 91 heat pump 92 steam turbine 93 condenser 94 steam engine 95 heat engine 96 separating and throttling calorimeter 97 indicator unit 98 limit gauges 99 feeler gauge 100 slip gauge set 101 universal bevel protractor 102 angle gauges 102 angle dekkar 104 precision level 105 surface plate granite 106 spirit level 107 roundness measuring machine 108 v block 109 optical flat 110 dial indicator 111 surface roughness taylor hobson’s tester 112 profile projector with gear profile/thread profile templates 113 floating carriage micrometer 114 screw thread micrometer 115 monochromatic light source unit 116 screw pitch gauge 117 gear tooth vernier caliper 118 tool maker’s microscope 119 parkinson’s tester/ gear rolling tester with master gears 120 strain gauge kit with cantilever 121 diaphragm pressure gauge 122 sensor bourdon tube c type with digital display 123 dead weight pressure tester 124 rotameter trainer 125 resistant thermometer 126 glass thermometer, bimetallic thermometer 127 bicycle free wheel sprocket mechanism, geneva mechanism, ackerman’s steering gear mechanism and foot operated air pump mechanism, slider crank mechanism, hooks joint, inversions of four bar mechanisms locomotive coupler, beam engine, pantograph, pendulum pump, rotary, i.c. engine mechanism, oscillating cylinder engine, whitworth quick return mechanism, quick return mechanism of shaper, scotch yoke mechanism, elliptical trammel and oldham’s coupling 128 vehicle tyre balancing machine 129 advanced casting equipment’s and tools 130 forging equipment’s and tools 131 shell core shooter moulding machine 132 electro magnetic forming equipment 133 electron beam machine 134 laser beam machine 135 ultrasonic machine 136 ecm 137 injection moulding machine 138 blow moulding 139 grinding machine 140 post processing equipment and tools 141 cnc 142 3d printer 143 cnc software 144 steam turbine test rig. 145 working models of centrifugal air compressor. 146 thermal power plant with steam engine trainer 147 gas power plant trainer 148 nuclear power plant trainer 149 hydroelectric power plant trainer 150 refrigerant leak detector 151 air conditioning unit 152 sling psychrometer 153 red wood viscometer 154 capillary tube 155 beaker, pipette, electronic balance, thermometer 156 manometer 157 differential manometer 158 surface plate 159 soldering and brazing equipment 160 sheet bending and cutting machine 161 black smithy tools and equipment 162 green sand moulding setup, casting setup and patterns 163 hot forging equipment 164 punching blanking press 165 arc welding machine 166 seam welding machine 167 oxy acetylene welding and cutting setup 168 soldering station, solder, flux 169 tool makers microscope 170 tool and cutter grinder 171 different single point and multi point cutting tools 172 milling machine with required set of work holding devices, cutting tools, accessories and tool holders. 173 drilling machine with required set of work holding devices, cutting tools, accessories and tool holders. 174 shaper with required set of work holding devices, cutting tools, accessories and tool holders. 175 lathe tool dynamometer 176 milling tool dynamometer 177 drill tool dynamometer 178 thermometer 179 equipment and chart for acceptance test of machine tools ...

Ministry Of Railways - Bihar

46088764 bids are invited for supply of various items as per annexure enclosed clearance gauge, spanner, size: 75/80/41, tunion bracket for lc (lh & rh), drum wheel for lc, wire adjustable screw, cylinder weights for lc gate, winch machine complete set with handle, pully state for lc gate total quantity : 1...

East Central Railway - Bihar

46040414 supply of heavy wire rope sling for pulling type winch with standard loop and eye hookheavy wire rope sling for pulling type winch with standard loop and eye hook,heavy wire rope sling for pulling type winch with standard loop and eye hook at one end wei ght of coach 70 ton, length 110 mtrs. rope dia 18mm, fmc, 6x19, ungalvanised. wire rope as per is 2266 :2002 or latest. brand/make ? usha martin or similar. [ warranty period: 30 months after the date of deliv ery ] ]...

Department Of Science And Technology - Bihar

46031923 request for proposal for supply of machines and equipments for mechanical engineering lab at govt. polytechnic, gopalganj. 1 say bolt viscometer digital 2 bomb calorimeter to test calorific value of solid & liquid fuels 3 two stroke petrol engine, 4 two stroke diesel engines 5 4 cylinder 4 stroke diesel engine test rig coupled with ac alternator morse test 6 thermal conductivity test on thick slab, composite slab and thick cylinder 7 four stroke 4 cylinder petrol engine, with hydraulic dynamometer 11 performance test on a/c test rig to determine cop of refrigerator 1 digital micrometre 2 digital vernier calliper 3 sine bar, sine centre 4 universal bevel protractor 5 analog vernier calliper 6 screw vernier calliper 7 gear tooth vernier calliper 8 inside micrometre 9 outside micrometre 10 stright edge 11 gauge set (radius and tread) 12 thread plug gauge 13 plain plug guage 14 taper plug gauge 15 thread micrometre 16 autocollimator 17 profile projector 18 floating carriage micrometre 19 magnetic dial indicator with dial gauge 20 ring gauge 21 snap gauge 22 electrical compactor 23 roughness tester 24 starin gauge 25 digital tachometer 26 strain measurement trainer apparatus 27 v block 28 dial indicator 29 monochromatic light source unit 30 parkinson’s tester/ gear rolling tester with master gears 31 spirit level 32 optical flat 33 precision level 34 angle dekkar 35 tool maker’s microscope 36 gear tooth vernier caliper 37 limit gauges 1 say bolt viscometer digital 2 bomb calorimeter to test calorific value of solid & liquid fuels 3 two stroke petrol engine, 4 two stroke diesel engines 5 4 cylinder 4 stroke diesel engine test rig coupled with ac alternator morse test 6 thermal conductivity test on thick slab, composite slab and thick cylinder 7 four stroke 4 cylinder petrol engine, with hydraulic dynamometer 8 performance test on a/c test rig to determine cop of refrigerator 1 cnc milling machine 2 cnc lathe machine 1 screw jack apparatus with weights 2 worm and worm wheel:: single with weights 3 worm and worm wheel : double with weights 4 worm and worm wheel : tripple with weights 5 wheel and differential axle 30 cm with weight 6 winch crab single purchase with weight 7 winch crab double purchase with weight 8 universal force table (normal) 9 moment of inertia of flywheel 10 parallel forces apparatus (dial type 10 kg. balance) 11 simply supported beam apparatus with weights 12 friction slide apparatus with weight 13 determine resultant of concurrent coplanar force system using forcepolygon table ...

Department Of Science And Technology - Bihar

46031827 supply of machines and laboratory equipment’s for mechanical engineering 1 determine resultant of concurrent coplanar force system using force polygon table 2 determine unknown force in a concurrent balance force system using lami’s theorem 3 find reactions at the supports of a simply supported beam and compare the results with analytical values. 4 determine the support reactions for simply supported beam by a) beam reaction apparatus b) circular dial type weight 5 determine coefficient of friction on horizontal and inclined plane. 6 determine the co efficient of friction between two surfaces by a) angle of repose methods b) friction plane method 7 find the coefficient of friction between belt and pulley in a belt friction set up 8 determine the centroid of geometrical plane figures (squares, rectangle, triangle) 9 determine the moment of inertia of a fly wheel 10 find m.a, v.r and efficiency of screw jack. 11 find m.a, v.r and efficiency of differential wheel and axle 12 calculate the efficiency of single purchase crab winch and double purchase crab winch 13 determine forces in jib crane. 14 determine the efficiency of worm and worm wheel. 1 abels flash & fire point apparatus flash point temperature 70 2 cleveland flash & fire point apparatus 3 pensky martin flash & fire point apparatus 4 say boly viscometer digital 5 bomb calorimeter to test calorific value of solid & liquid fuels 6 junkers gas calorimeter (gaseous fuels) to test calorific value of gaseous fuels 7 conradsons apparatus for carbon residue test 8 two stroke petrol engine, constant speed, air cooled, horizontal petrol engine, 3bhp, 1500 rpm 9 two stroke diesel engine 10 single cylinder 4 stroke diesel engine test rig coupled with ac alternator constant speed, water cooled, vertical diesel engine, 5 bhp, 1500 rpm compression ratio 16.5:1 brake drum radius 0.185 m orifice diameter 15mm 11 crdi 4 stroke diesel engine for dismantling and assembling with fault simulation board 12 single cylinder 4 stroke petrol engine 1. verification of bernaullis theorem 2. co efficient of discharge of venturimeter, orifice meter. 3. centrifugal pump test rig. (constant & variable speed) 4. determination of coefficient of friction of flow through pipes 5. minor losses in pipes 6. reciprocating pump test rig (with motor) 7. francis turbine test rig 8. pelton turbine test rig 1. practical i 2. practical ii 3. practical iii 4. practical iv, v 5. practical i,ii,iii,iv & v 6. practical vii...

Department Of Science And Technology - Bihar

45871602 requirement of lab items for civil and mechanical engineering lab 1 wind tunnel 2 open chennel flume(tilting fluyme) 3 friction loss along a pipe 4 minor losses in pipe apparatus 5 reynolds apparatus 6 curing tank 1. impact of jets on vanes 2. pelton wheel turbine test rig 3. francis turbine test rig 4. kaplan turbine test rig 5. centrifugal pump test rig 6. reciprocating pump test rig 7. performance of a two stage reciprocating air compressor 8. air blower test rig 1 journal bearing 2 data logger screw jack apparatus with weights 2 worm and worm wheel ::single with weights 3 worm and worm wheel:: double with weights 4 worm and worm wheel:: tripple with weight 5 wheel and differential axle 30 cm with weight 6 winch crab single purchase with weight 7 winch crab double purchase with weight 8 universal force table (normal) 9 moment of inertia of flywheel 10 parallel force apparatus (dial type 10 kg. balance) 11 simple suported beam apparatus with weight 12 friction slide apparatus with weight 13 crank lever apparatus...

Power Grid Corporation Of India Limited - Bihar

45824354 bids are invited for power winch 3t , power winch 5t , derrick pole 140 mm dia class c of 6 plus 4 meter length , steel wire rope 12mm aprox 200 mtr each , crowbar , polypropylene rope12mm , polypropylene rope 16mm , polypropylene rope18mm , polypropylene rope22mm , shoe , spanner 24 by 26 , spanner 30by 32 , pulley close type single sheeve 5t for 10mm to 12mm , pulley close type single sheeve2.5t for 8mm to 12mm , pulley open type single sheeve , retractable fall arrester , steel wire rope sling 12mm x 70 metre one end spliced , steel wire rope sling 12mm x 10 metre one end spliced , steel wire rope sling 16mm x 3 metre both end spliced , steel wire rope sling 16mm x 1metre both end spliced , steel ropes 12mm 500 meter , steel ropes 16mm 500 meter , come along clamp 7 bolts , auto matic come along clamp 7 bolts , 4 sheave pulley 10 t capacity , 4 sheave pulley 5 t capacity , 2 sheave pulley , single sheave pulley 5 ton , single and double end socks , turn buckle close type 10 t , turn buckle open type 5 t , d shakles 12t , d shakles 9 decimal 5t , d shakles 6 decimal 5t , power winch 3t capacity , sag boards , hydraulic joint compressor capacity 100mt , die set moose , die set earthwire 7 by 3 decimal 66 mm , earth wire flat clamps , d shackle 16mm 25mm , crow bars , conductor cutter moose , cutting pliers , screw driver different sizes , spanners 24by 26 , safety belt full harness , helmet , hammer 5kg , first aid box , discharge rods , equalizer pulley 10 mt , conductor sock joints one end open , hydraulic conductor drum lifting jack 6t capacity , chain pulley block 5 t capacity , bull dog clamp suitable 10 mm , bull dog clamp suitable 12mm , bull dog clamp suitable 16 mm , ratchet hoist 3 t , ratchet hoist 6 t , turn table with breaking arrangement 10t , two way poly propylene rope pulley 2 ton capacity , conductor sock joints both end open 29 38 mm , shoulder pad , cotton hand gloves , patta clamp for e by w , automatic clamp for e by w , aerial roller 5 sleeve , aerial roller for e by w , head board , tarpauline 6m x 6m , pulling grip of earthwire total quantity : 1876...

Department Of Fertilizers - Bihar

45627669 bids are invited for procurement of rescue tool m2101030002 , m2101030001 , m2115120004 , m2105350003 , m2103030008 , m2105350002 rope grab fall arrestor, fall arrestor rope, reflective tape (minimum 45 meters and dia. 2 inch), rescue tripod with winch, full body horn, rescue kit, rope ladder 15 meter length 1 13 total quantity : 40...

Department Of Science And Technology - Bihar

45554473 tender for mechanical engineering laboratory equipment for government polytechnic gulzarbagh patna 7 1. models and charts 2 sample production/construction drawings 3 drawing equipment’s and instruments 4 differential axle and wheel 5 simple screw jack 6 worm and worm wheel 7 single purchase crab winch 8 double purchase crab winch 9 universal force table 10 beam reaction apparatus 11 friction apparatus for motion along horizontal and inclined plane 12 set up for belt friction apparatus 13 fly wheel apparatus 14 models for projection and demonstration 15 perform brinell, rockwell and vicker’s hardness testers 16 combined shear force and bending moment apparatus 17 slope and deflection of beam apparatus 18 torsion testing machine 19 petrol engine 20 diesel engine 21 different types of boilers 22 boiler mounting and accessories 23 heat exchanger name 24 vernier calipers & micrometers 25 plug gauge 26 steel ring gauges 27 vernier height and depth gauge 28 micrometer depth gauge 29 sine bar, sine centre 30 autocollimator 31 differential pressure bellows 32 thermocouple tutor 33 digital vernier caliper 34 digital micrometer...

Department Of Science And Technology - Bihar

45107466 supply of machines and laboratory equipment’s for physics and mechanical engineering 1 determine resultant of concurrent coplanar force system using force polygon table 2 determine unknown force in a concurrent balance force system using lami’s theorem 3 find reactions at the supports of a simply supported beam and compare the results with analytical values. 4 determine the support reactions for simply supported beam by a) beam reaction apparatus b) circular dial type weight 5 determine coefficient of friction on horizontal and inclined plane. 6 determine the co efficient of friction between two surfaces by a) angle of repose methods b) friction plane method 7 find the coefficient of friction betweenbelt and pulley in a belt friction set up 8 determine the centroid of geometricalplane figures (squares, rectangle,triangle) 9 determine the moment of inertia of a fly wheel 10 find m.a, v.r and efficiency of screw jack. 11 find m.a, v.r and efficiency ofdifferential wheel and axle 12 calculate the efficiency of singlepurchase crab winch and doublepurchase crab winch 13 determine forces in jib crane. 14 determine the efficiency of worm andworm wheel. 15 abels flash & fire point apparatusflash point temperature 70 16 cleveland flash & fire point apparatus 17 pensky martin flash & fire point apparatus 18 say boly viscometer digital 19 bomb calorimeter to test calorific value of solid & liquid fuels 20 junkers gas calorimeter (gaseous fuels) to test calorific value of gaseous fuels 21 conradsons apparatus for carbon residue test 22 two stroke petrol engine, constant speed, air cooled, horizontal petrol engine, 3bhp, 1500 rpm 23 two stroke diesel engine 24 single cylinder 4 stroke diesel engine test rig coupled with ac alternatorconstant speed, water cooled, vertical diesel engine, 5 bhp, 1500 rpm compression ratio 16.5:1 brake drum radius 0.185 morifice diameter 15mm 25 crdi 4 stroke diesel engine for dismantling and assembling with fault simulation board 26 single cylinder 4 stroke petrol engine 27 verification of bernaullis theorem 28 co efficient of discharge of venturimeter, orifice meter. 29 centrifugal pump test rig. (constant & variable speed) 30 determination of coefficient of friction of flow through pipes 31 minor losses in pipes 32 reciprocating pump test rig (with motor) 33 francis turbine test rig. 34 pelton turbine test rig. 35 vapour compression refrigeration trainer test rig: 36 condenser: 37 evaporator: steel material: cross sectional view model of forced circulation evaporator. 38 evaporator: steel material: cross sectional view model of direct contact evaporator. 39 sling psychrometer: 40 refrigeration tool kit and complete refrigeration kit. 41 wood turning lathe machine 42 circular saw machine. straight rise fall& tilting type 43 universal wood working machine 44 band saw machine with all accessories. 45 steel rulescale 1mtr. 46 scriber 47 marking gauge 48 mortise gauge 49 dividers 50 rip saw 51 try square 52 coping saw 53 firmer chisel 54 gauge chisel 55 iron jack plane 56 trying plane 57 rasp 58 hand drill 12 mm 59 gimlet drill 60 clamping vice 61 c clamp 62 cross pin hammer 63 ball pin hammer 64 claw hammer 65 sledge hammer 66 mallet 67 open hearth furnace. 68 anvil 69 hand hammer 70 double handed sledge hammer 71 tongs 72 chiesel tongs 73 pick up tong. 74 pipe mouth. 75 round mouth hollow. 76 hot chiesel 77 cold chiesel 78 hardle set 79 punches; 80 81 82 83 84 drift 85 86 87 88 89 flatter 90 fuller 91 swage 92 swage block with stand. 50. 93 set hammer 94 leg vice 95 hammer 96 smith square 97 calliper 98 angle mouth tongs 99 bench vice 100 leg vice 101 pipe vice 102 try square 6 and l square 103 scriber surface gauge 104 dot punch (4 & 8) 105 centre punch (4 & 8) 106 surface plate 24 x 24 107 angle plate. 108 steel rule. 109 inside vernier calliper. 110 outside vernier calliper 111 micrometer. 112 divider 113 outside calliper. 114 inside calliper. 115 spring callipers 116 feeler gauge set rough file 117 118 119 120 bastered file 121 122 123 124 second cut file 125 126 127 128 smooth file 129 130 131 132 dead smooth file 133 134 135 136 files; 137 flat file 138 square file 139 triangular file 140 round file 141 half round file 142 knife edge file 143 diamond file chiesel 144 flat 145 cross cut 146 half round 147 diamond point 148 ball pin hammer. 149 straight pin hammer 150 cross pin hammer. 151 drills tapered shank & parallel shank 152 tap set. high speed 153 bench drilling machine. 154 portable drilling machine 155 pipe wrench 156 chain wrench 157 lathe machine light duty 158 lathe machine 159 gas welding/ cutting machine 160 arc welding machine 161 solder iron machine 162 fire extinguisher 163 sheet bending and cutting operation 164 sheet metal and hand tools 165 slip gauge complete set 166 a) vernier caliper 167 b) vernier caliper 168 c) vernier caliper 169 d) vernier caliper 170 e) vernier caliper 171 f) vernier caliper dial 172 f) vernier caliper dial 173 f) vernier caliper dial 174 a) micrometer outside 175 b) micrometer outside 176 c) micrometer outside 177 d) micrometer outside 178 e) inside micrometer 179 f) inside micrometer 180 sine bar complete set 181 vernier bevel protector 182 straight edge 183 gauge sets (radius, thread) 184 thread plug gauges (set of 5) 185 plain plug gauges (set of 5) 186 taper plug gauges (set of 5) 187 thread micrometer 188 autocollimator 189 profile projector 190 floating carriage micrometer 191 magnetic dial indicator with dial gauge 192 ring gauge 193 surface plate 194 snap gauge 195 comparator 196 roughness tester 197 stain gauge 198 lvdt 199 flow measurement apparatus 200 temp. measurement 201 tachometer digital 202 tachometer analog 203 transducer set 204 height gauge 205 pressure measurement apparatus 206 torque measurement apparatus 207 strain mesurement trainer apparatus 208 load cell trainer 209 thermo couple calibration trainer 210 speed measurement trainer 211 mounting dead weight safety valve 212 spring loaded safety valve 213 model of steam stop valve 214 model of pressure guage 215 model of water level indicator 216 model of fusible plug 217 model of blow off cock 218 accessories model of economizer 219 model of air preheater 220 model of superheater 221 model of steam separator 222 model of steam trap 223 model of injector 224 multi stage reciprocating compressor 225 two stroke petrol engine, contant speed, air cooled, horizontal petrol engine, 3 bhp, 1500 rpm 226 two stroke diesel engine 227 single cylinder 4 stroke diesel engine test rig. coupled with ac alternator constant speed, water cooled, vertical diesel engine, 5bhp, 1500 rpm 228 single cylinder 4 stroke petrol engine 229 1. cornish boiler model 230 2. lamont boiler model 231 3. benson boiler model 232 4. lancashire boiler model 233 5. locomotive boiler model 234 6. loeffler boiler model 235 7. veloxboiler model 236 universal testing machine computerised, 6 pillar type with hydraulic jaws. capacity 60 ton 237 digital torsion testing machine 238 digital spring testing machine 239 pendulum impact tester 240 rockwell hardness tester 241 laboratory metallurgical microscope 242 eeciflux power type equipment for magnetic particle test weight 45kg, model name/number 1500, 1500 2 and 2000 amps heavy duty cycle 0.5 sec off, type ac and hwdc output, dimension (l*w*h) 550mm x 240mm x240mm. 243 direct shear test apparatus motorised 244 vernier caliper 245 micrometer screw gauge 246 spherometer 247 spring oscillator 248 bar pendulum 249 pullingger’s apparatus 250 searle’s apparatus 251 stokes’s law apparatus 252 photo electric cell experiment 253 numerical aperture of an optical fiber 254 he ne/diode laser 255 fly wheel 256 vernier caliper 257 micrometer screw gauge 258 spherometer 259 spring oscillator 260 bar pendulum 261 p n junction diode 262 parallel plate capacitor 263 photo electric cell 264 numerical aperture of an optical fiber. 265 he ne/diode laser ...

Inland Waterways Authority Of India - Bihar

44788719 tender for dry dock repair of anchor pontoon iii and anchor pontoon iv at nw i for the f.y.2024 25.; 1 beaching, blocking, unblocking charges as required to be done for repair of vessel as required as per direction of eic. 2 ultrasonic testing to be carried out of underwater hull plate, deck plate and ship side plate,deck etc measurement ofdeck for thickness as per direction of eic. 3 cropping & renewal of under water plate, deck plate,including all air vents and fitting of wire mesh/caps as per oem ,bollards, ship side plate & other fitments after ultrasonic testing report of existing plate and as required as per direction of eic. 4 under water hull plate and side plate from keel to lwl to be scrapped, wire brushed and chippedand painted by threecoats as per painting scheme, as per direction of eic. 5 top overhauling of generator engine make kirlosker, model caf10,hp 10 is to be done including of renewal of rings, bearings, liners, valves, seals, joints, calibrartion of fuel pumps, injectors etc. including servicing of alternator as required for proper working as per direction of eic 6 labour charge 7 cost of spare actual + 10% 8 servicing ofanchor winch motor make kirloskar,model : sh092413 01 to be serviced for smooth movement of gear as required, checking/ repair of driving gear unit including calibration/ painting of chains as required for proper operation as required as per direction of eic. 9 labour charge 10 cost of spare actual + 10% 11 electric panel board of anchor pontoon isreported non functional, same to be checked/rectified the defects including wiring connection, indicators and regulator as required as per direction of eic. 12 labour charge 13 cost of spare actual + 10% 14 chipping, wire brushing and cleaning and painting of all ship side area from lwl to main deck along with deck & all accessories including chains, deck fittings, cabin,including bulkhead etc. to be done with one coat of zinc chromate yellow primer followed by two coats of existing colour anti crossive marine paints as required as per direction ofeic. 15 boq for anchor pontoon iv 16 beaching, blocking, unblocking charges as required to be done for repair of vessel as rrequired as per direction of eic. 17 ultrasonic testing to be carried out of underwater hull plate, deck plate and ship side plate,deck etc measurement ofdeck for thickness as per direction of eic. 18 cropping & renewal of under water plate, deck plate,including all air vents and fitting of wire mesh/caps as per oem ,bollards, ship side plate & other fitments after ultrasonic testing report of existing plate and as required as per direction of eic. 19 under water hull plate and side plate from keel to lwl to be scrapped, wire brushed and chippedand painted by threecoats as per painting scheme, as per direction of eic. 20 top overhauling of generator engine make kirlosker, model caf10,hp 10 is to be done including of renewal of rings, bearings, liners, valves, seals, joints, calibrartion of fuel pumps, injectors etc. including servicing of alternator as required for proper working as per direction of eic 21 labour charge 22 cost of spare actual + 10% 23 servicing ofanchor winch motor make kirloskar,model : sh092413 01 to be serviced for smooth movement of gear as required, checking/ repair of driving gear unit including calibration/ painting of chains as required for proper operation as required as per direction of eic. 24 labour charge 25 cost of spare actual + 10% 26 electric panel board of anchor pontoon isreported non functional, same to be checked/rectified the defects including wiring connection, indicators and regulator as required as per direction of eic. 27 labour charge 28 cost of spare actual + 10% 29 chipping, wire brushing and cleaning and painting of all ship side area from lwl to main deck along with deck & all accessories including chains, deck fittings, cabin,including bulkhead etc. to be done with one coat of zinc chromate yellow primer followed by two coats of existing colour anti crossive marine paints as required as per direction ofeic. 30 renewal of necessary steel nut & bolts (m16x40 l) and washers of all manholes as required as per direction of eic. ...

Ministry Of Power - Bihar

44722470 bids are invited for electric winch 5 ton 10035909 m63055601 , electric winch 3 ton m6305256011 total quantity : 2...

Ministry Of Power - Bihar

44584152 bids are invited for 10022829_ 10_ m2293330026_ winch, elec power driven, is9507 total quantity : 4...

National Thermal Power Corporation Limited - Bihar

43351587 bids are invited for custom bid for services 200131813 biennial contract for mechanical maintenance of chp system equipment ntpc kanti, 10.10. ( fhcpl00bd800 ) coupling ( <> ) replacement coupling replacement. for measurement purpose any one of the following will be treated as one unit. replacement of fluid coupling ‘or’ conveyor drive brake drum ‘or’ gear box cooling fan or flexible coupling a ) shifting of new / repaired fluid coupling / brake drum / cooling fan / flexible coupling at site. b ) decoupling of fluid coupling / dismantling of thruster brakes ( if required ) and shifting of motor to the required place. c ) removal of fluid coupling / brake drum / cooling fan / flexible coupling from motor / gear box. d ) mounting of new / repaired fluid coupling / brake drum / cooling fan / flexible coupling, placement of motor and oil filling in coupling if required. e ) coupling of the drive and system normalization after the alignment. f ) trial run and defect rectification, if any fluid coupling dis mounted after dismantling then assembling of coupling after defective part replacement is in the scope of the contractor without any extra claim. g ) shifting of old fluid coupling / brake drum / cooling fan at chp workshop or as per direction of engr in charge. h ) if brake drum, cooling fan and flexible coupling replaced at a time, no extra payment will be made. it will also be applicable for removal & remounting of couplings. i ) cutting / welding required for the job comes under contractor’s scope. 10.20 ) . ( fhiid00bd800 ) impact idlers ( <> ) repl. idlers repl. / screw take up tightening and loosening / idler frame repl. / scrapper repl. / deck plate repl. replacement of rollers / idlers: [ for payment purpose replacement of total no. of rollers / idlers in one frame carrying / return will be treated as one unit. ] a ) replacement of any rollers / idlers in chp comes under this. b ) shifting of new / repaired rollers / idlers at site and fixing at required place. c ) shifting of old / damaged rollers / idlers to chp workshop / chp scrap yard. d ) if more than one rollers / idlers are replaced in same frame simultaneously, it will be treated as one unit. ‘or’ for measurement purpose any one of the following will be treated as one unit. screw take up loosening and tightening: a ) it includes all screw take ups in chp conveyors. b ) loosening of screw take up as per requirement and retightening it as per direction. or replacement of idler frame: a ) replacement of any idler frame in chp comes under this. b ) shifting of new / repaired idler frame at site and fixing at required place. c ) shifting of old / damaged idler frame to chp workshop / chp scrap yard. d ) if idlers are also replaced during frame replacement, no extra payment will be made. e ) cutting / welding required for the job comes under contractor’s scope. ‘or‘ scrapper replacement: a ) removal of worn out rubber, making new rubber from old conveyor belt / rubber sheet, as per requirement. b ) fixing of rubber in scraper and reinstallation on the conveyor. c ) cutting / welding required for the job comes under contractor’s scope. ‘or‘ replacement of deck plate ( 01. no ) : a ) removal of existing plate after removing the idlers & frames as required. b ) shifting of new deck plate ( including wooden one ) at site & fixing it. c ) normalization of the system. d ) cutting / welding required for the job comes under contractor’s scope. 10.30 ) . ( fhg / b58bd800 ) gear boxes ( hold back ) repl ( 6 hrs ) gear box hold back replacement / fluid coupling oil replacement / decoupling and coupling of gear coupling / thruster replacement / thruster overhauling gear box hold back replacement: a ) replacement of hold back of any conveyor gear box in chp comes under this. b ) shifting of new / repaired hold back from chp store / central store / central workshop to site. c ) removal of old hold back from gear box and fixing of new hold back. d ) trial run and defect rectification, if any. e ) shifting of old hold back to chp workshop. for payment purpose one g box hold back repl. will be treated as one unit. ‘or’ fluid coupling oil replacement: a ) oil replacement of any fluid coupling in chp comes under this. b ) removal of coupling guard, opening of fusible plug / filling plug and draining of oil in a can & shifting it to chp scrap yard. c ) shifting of oil at site & filling in the fluid coupling up to specified angle. d ) fitting the fusible plug / filling plug, fixing of coupling guard. for payment purpose two fluid coupling oil replacements will be treated as one unit. ‘or‘ decoupling and coupling of gear coupling ( after greasing ) : a ) this covers all gear couplings being used in chp. for payment purpose decoupling and coupling of gear coupling of one gear coupling will be treated as one unit. ‘or thruster replacement: a ) replacement of any thruster ( except stacker rail clamp ) in chp comes under this. b ) shifting of new / repaired thruster at site. c ) removal old thruster and fixing of new one, stroke adjustment as per requirement. d ) shifting of old thruster to chp workshop. e ) trial run and defect rectification if any for payment purpose one thruster repl. will be treated as one unit. ‘or’ thruster overhauling: a ) this covers for any thruster being used in chp b ) dismantling of thruster as per direction of area engr. c ) replacement of damaged part as per direction & reassembling. d ) oil filling and testing for smooth operation. for payment purpose one thruster overhauling will be treated as one unit. 10.40 ) . ( fhp / c12bd800 ) pulley / coupling ( nde brg ) repl servicing of fluid coupling / replacement of conveyor non drive end bearing / plumber block for measurement purpose any one of them will be treated as separate unit. servicing of fluid coupling: a ) this covers any fluid coupling being used in chp. b ) dismantling of fluid coupling as per direction. c ) replacement of defective parts of fluid coupling as per direction and re assembling. d ) testing of oil leakage by filling oil. defect rectification, if any. ‘or’ replacement of conveyor non drive end bearing / plumber block: a ) it includes any bearing / plumber block of any pulley including gtu / bend / snub / drive pulley of any conveyor in chp. b ) belt clamping, take up lifting & lowering will be in the scope of this contract. c ) shifting of new bearing / plumber block at site. d ) opening and removal of plumber block / bearing form the pulley. e ) mounting of new bearing on the pulley and fixing of plumber block and greasing bearings. f ) if required bearing of non drive pulley will also be replaced. g ) system normalization. trial run and defect rectification, if any. h ) if plumber block is replaced at the time of bearing replacement, no extra payment will be made. 10.50 ) . ( fhcht51bd800 ) chutes ( skirt rubber ) repl skirt rubber replacement / shifting of oil / lubricant drums skirt rubber replacement: a ) replacement of rubber of any skirt comes under this, if skirt is damaged. b ) opening of skirt rubber clamp and removing of worn out rubber. c ) making the new skirt rubber, from old conveyor belt / skirt rubber sheet, as per requirement. d ) fixing of new rubber in frame & mounting it on the skirt and trial run for leakage arresting. e ) for measurement purpose, for measurement purpose one metre or part will be taken as one unit. ‘or’ shifting of oil / lubricant drums from central stores or any other place inside plant to chp store and vice versa: a ) it includes shifting of filled oil / grease drums from central stores or any other place inside plant to chp store and vice versa. b ) shifting of one drum will be taken as one unit. c ) transportation arrangement is to be arranged by the contractor. 10.60 ) . fhp / c52bd800: conv pulleys ( <> ) ( non drive ) repl conv pulleys ( non drive ) repl / replacement of take up pulley / replacement of conveyor pulley bearing / plumber block ( drive end ) / gear coupling replacement ( one pair ) a ) replacement of all non drive pulley including snub pulley, bend pulley, tail pulley and tail snub pulley comes under this. b ) shifting of new / repaired pulley from chp store / central store / central workshop to site. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) removal old pulley, bearings and plumber block from the old pulley. e ) mounting of bearings and plumber blocks, on the new pulley. f ) placement of new pulley on position and alignment with the system. g ) system normalization trial run and defect rectification, if any. h ) shifting of old pulley to chp workshop / central workshop. ‘or’ replacement of take up pulley: a ) replacement of take up pulley of any conveyor comes under this. b ) shifting of new repaired pulley at site. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) cutting the conveyor belt at the required place if required and removal of old pulley from foundation. e ) removal of bearings / plumber blocks of pulley. f ) mounting of bearings and plumber blocks on the new pulley. g ) lifting of new pulley and mounting it on the foundation. h ) pulling of conveyor belt and belt joint will not be in the scope of this contract. i ) system normalization, trial run & defect rectification, if any. j ) shifting of old / damaged pulley to chp / central workshop. ‘or’ replacement of conveyor pulley bearing / plumber block ( drive end ) : a ) decoupling of gear box and shifting it to the required place. b ) removal of low speed side coupling half. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) drive pulley lifting and removal of plumber block / bearings. e ) shifting of new bearing / plumber block and mounting it on the pulley. greasing of bearing. f ) system normalization, placement of gear box and alignment. g ) trial run and defect rectification, if any. h ) if plumber block is replaced at the time of bearing replacement, no extra payment will be made. ‘or’ gear coupling replacement ( one pair ) : a ) replacement of any gear coupling of any conveyor belt comes under this. b ) shifting of new / repaired gear coupling at site. c ) removal of coupling guards, decoupling of gear box from both high speed side and slow speed side. shifting of motor and gear box at required place and removal of gear coupling after dismantling of thruster brake, if required. d ) mounting of new gear coupling, placement of gear box at foundation. e ) normalization of system after alignment, for alignment. f ) trial run and defect rectification, if any. g ) shifting of old gear coupling to chp workshop. h ) cutting / welding required for the job comes under contractor’s scope. 10.70 ) . ( fhcnp00bd800 ) conv pulleys ( <> ) repl replacement of drive pulley: a ) replacement of drive pulley of any conveyor in chp ( except coal / sampler ) comes under this. b ) shifting of new / repaired pulley from central store / chp store / central workshop to site. c ) belt clamping, take up lifting and lowering will be in the scope of this contract. d ) decoupling the gear coupling and removal of drive pulley after opening and removal of discharge hood. e ) removal of gear coupling, bearing & plumber blocks. f ) mounting of gear coupling, bearings and plumber blocks on the new pulley. g ) placement of new pulley on position & alignment of the pulley with gear box to the satisfaction of engr. in charge. h ) system normalization trial run & defect rectification, if any. i ) shifting of old pulley to chp workshop / central workshop 10.80 ) . ( fhpcc53bd800 ) crushers ( hammers ) repl replacement of full set hammers replacement of full hammers: a ) weighing of new hammers, weight balancing and shifting them to the site after internal inspection of crusher. b ) removal of hammers from the crusher and replacement of new hammers as per direction of area engineer or his representative. c ) shifting of old hammers to chp scrap yard. d ) any cutting / welding required will be in scope of contractor. 10.90. ( fhscc11bd001 ) cr hammer attend breakdown repl. of hammers in two opposite rows for measurement purpose any one of the following will be treated as separate unit. repl. of hammers in two opposite rows: a ) weighing of new hammers, weight balancing and shifting them to the site after internal inspection of crusher. b ) removal of broken / worn out hammers from the crusher and replacement of new hammers as per direction of area engineer or his representative. c ) shifting of old hammers to chp scrap yard. d ) any cutting / welding required will be in scope of contractor. 10.100 ( fhgzf17bd800 ) grizzly feeders ( shaft assly. ) repl replacement of g.f. shaft / replacement of crusher kick off plate replacement of g.f. shaft ( one no. of shaft ) : a ) removal of guards, universal coupling / cardoon shaft & counter weight. b ) removal of bearings and bearing housings at d.e. & nde c ) shifting of new g.f. shaft to site. d ) removal of old shaft and fixing of new shaft. e ) mounting of bearing housings on the new shaft / replacement of bearing housing if required. f ) remounting of counter weight, universal coupling and their guards. g ) greasing, trial run and defect rectification, if any. h ) shifting of old / damaged g.f. shaft to chp workshop / chp scrap yard. ‘or’ replacement of crusher kick off plate: a ) shifting of kick off plate at site from central store / site store. b ) removal of crusher top cover / side liners if required. c ) opening of kick off plate bolts and removal of frame fill piece. d ) fixing of new frame fill piece, tightening of bolts up to required torque / welding if required. e ) normalization of system. trial run and defect rectification. f ) shifting of old frame fill piece to chp scrap yard or as per direction. 10.110. ( fhvbf00bd000 ) vibro feeders ( <> ) attend defect vibro feeders attend defect / tightening of breaker plate bolt for measurement purpose any one of the following will be treated as separate unit. ( 1 ) . remove the worn out / broken tray from the position. ( 2 ) . replace the same with the new tray / repaired tray with new / same tie rod / tie rope assembly and do proper alignment. ( 3 ) any other minor work like patch work in chute and adjustment in hopper / chute to maintain the freeness of tray with chute etc as per direction of eic. 4 ) take trial after adjusting the tray. 5 ) declination angle adjustment of the as per the direction of eic. 6 ) unbalanced weight adjustment work as per the direction of eic. 7 ) replacement of vibro feeder pedestal spring ‘or’ tightening of breaker plate bolt after welding of head: a ) welding of head of one breaker plate bolt as per requirement. b ) tightness checking of bolt and locking of nuts. c ) any cutting / welding required will be in the scope of the contractor. d ) for measurement purpose tightening of bolt of one breaker plate will be treated as one unit. e ) for welding of heads of breaker plate bolts, e7018 1 electrodes will be supplied by kbunl free of cost. 10.120. ( fhscc17bd800 ) crushers ( rotor assly ) repl crushers ( rotor assly ) repl for measurement purpose any one of the following will be treated as separate unit. replacement of crusher rotor: a ) shifting of new rotor from central store / any other store to crusher floor b ) decoupling of slow speed coupling and removal of pin bush. c ) removal of crusher cover, front side housing, tramp iron tray, plumber block bolts, side liners, hood, chute etc. d ) removal of all hammers and suspension bars. e ) lifting up the rotor and placement at a safe place. f ) removal of coupling half and bearings from rotor. g ) lower the new rotor into position after mounting of bearings, plumber blocks and coupling half. box up in reverse order. h ) check and correct misalignment of slow speed side. i ) balancing of hammers & mounting ( replace full set of hammers if required ) , system normalization, trial run and defect rectification, if any. j ) shifting of old rotor to chp scrap yard. k ) replacement of defective side liners, repairing of ‘v’ shaped deflector plate and other plates if required, also to be done without any extra financial implication. l ) any cutting / welding required for this job will be in the scope of contractor. m ) for welding of heads of liner bolts, breaker plate bolts, screen plate bolts e7018 1 electrodes will be supplied by kbunl free of cost. ‘or’ replacement of g.f. deck side walls ( 01 set =02nos ) : a ) shifting of 02 no. deck side walls from kbunl stores to site. b ) dismantling of bearing housings, bypass chute, side skirt, shaft tubes, spring units, removal of damaged deck side walls after proper supporting of skirts & decks. c ) fixing of new deck side walls & re installation of all dismantled parts. d ) removal of all supports. system normalization, trial run & defect rectification, if any. e ) shifting of damaged deck side walls to chp scrap yard. f ) if only 01no ( one ) g f deck side wall is replaced, 50% payment will be made. b ) cutting / welding required for the job comes under contractor’s scope. 10.130. ( fhpcc52bd800 ) crushers ( screen plate ) repl crushers ( screen plate ) repl / breaker plate / kick off plate / replacement of crusher d.e. bearing / plumber block for measurement purpose any one of the following will be treated as separate unit. replacement of crusher screen plate / breaker plate / kick off plate : a ) shifting of screen plate / breaker plate / kick off plate at site from central store / site store. b ) removal of crusher top cover. c ) opening of screen plate / breaker plate / kick off plate bolts and removal of the same. d ) fixing of new screen plate / breaker plate / kick off plate , tightening of bolts up to required torque / welding if required. this includes fixing of site make screen plates also. e ) normalization of system. trial run and defect rectification. f ) shifting of old screen plate / breaker plate / kick off plate to scrap yard or as per direction. g ) if both upper & lower screen plates are replaced simultaneously, it will be treated as one unit. i ) all allied activity related with screen plate replacement, including cutting / welding or preparation of jig fixtures comes under contractor’s scope. ‘or’ replacement of crusher d.e. bearing / plumber block : a ) shifting of new bearing / plumber block at site. b ) decoupling of gear box from slow speed side and high speed side. c ) removal of flexible coupling half. e ) opening of shaft seal covers on both sides. f ) loosening of both side plumber block bolts and its top cover. g ) removal of top cover of crusher. h ) removal of side liners above the end discs on both sides. i ) lifting of rotor and removal of plumber block and bearing ( de ) . j ) mounting of new bearing correctly and adjusting the clearance to the specified value. k ) placement of plumber block and lowering of rotor. l ) boxing up in reverse order. m ) mounting of coupling, placement of g / b. alignment of rotor with gear box. n ) system normalization and trial run and defect rectification, if any. o ) shifting of old bearing / plumber block to chp scrap yard. p ) cutting / welding required for the job comes under contractor’s scope. q ) if bearing and plumber block are replaced simultaneously no extra payment shall be made, if will be treated as one unit. 10.140. ( fhttr00bd000 ) travelling tripper ( <> ) attend defect travelling tripper rail structure supporting beam bolts tightening / miscellaneous jobs related to travelling tripper for measurement purpose any one of the following will be treated as separate unit. travelling tripper rail structure supporting beam bolts tightening: a ) it includes tightening all bolts of travelling tripper rail supporting beam, structural member, coupling bolts of tripper. or miscellaneous jobs related to travelling tripper such as scrapper adjustment, skirt fixing, eh brakes inspection and adjustment etc. 10.150. ( fhttr22gn808 ) travelling tripper ( tripper wheel ) realignment re railment of trippers : a ) dismantling of tripper bracings / str., as required. b ) lifting of tripper by mechanical means and placing it on the tripper rails. c ) re assembling of all supporting str. as per direction and system normalization. d ) trial run and defect rectification, if any. e ) any cutting / welding required for this job will be in the contractor’s scope. 10.160. ( fhttr00oh001 ) travelling tripper ( <> ) oh overhauling of tripper hand brake / manual brake / ilms pulley bearing flange replacement / flap gate flange bearing replacement / crusher hammer pin replacement for measurement purpose any one of them will be treated as separate unit. overhauling of tripper hand brake / manual brake: a ) removal of damaged hand brake from position. b ) rectification / strengthening of fixing base plate / replacement of shoe etc. c ) refixing of hand brakes by welding / bolting. check for alignment / fouling with rails. e ) system trial run. defects rectification, if any, after trial run. ‘or’ ilms pulley bearing flange replacement ( nde ) a ) shifting of new bearing at site. b ) preparation of jig / fixtures for supporting the ilms. c ) removal of bearing / bearing flange. d ) system normalisation. trial run and defect rectification, if any. e ) if bearing flange is replaced while bearing replacement, it will be treated as one unit. f ) cutting / welding required for the job comes under contractor’s scope. ‘or’ flap gate flange bearing replacement: a ) removal of operating lever / counter weight lever. b ) shifting of new bearing at site. c ) removal of old bearing and mounting of new bearing and greasing. refitting of lever. d ) shifting of old bearing at chp scrap yard. e ) any cutting / welding work will be in the scope of the contractor. ‘or’ crusher hammer pin replacement : a ) opening of access door. opening of shaft seal / removal of pin retainer bolts. b ) shifting of new hammer pin at site, after weighing. c ) removal of damaged hammer pin and replacement with new one. replacement of the same on opposite side also. d ) crusher box up, trial run and defect rectification, if any. 10.170. ( fhttr00bd801 ) travelling tripper ( <> ) repair tripper rail joint welding. removal of old welding & welding as per requirement. welding electrode e7018 1 will be supplied by kbunl free of cost. for measurement purpose one centimeter will be treated one no. for payment purpose 01 cm will be treated as 01 no 10.180. ( fhilm56bd800 ) ilms / obms ( pulley brg ) repl ilms pulley bearing / bearing flange replacement ( de ) / flap gate actuator replacement / replacement of flap gate trunnion bracket for measurement purpose any one of them will be treated as separate unit. ilms pulley bearing / bearing flange replacement ( de ) : a ) shifting of new bearing at site. b ) preparation of jig / fixture for supporting the ilms. c ) removal of drive motor and gear box. removal of bearing / bearing flange. d ) fixing of new flanged bearing and mounting it on the pulley shaft. e ) assembling of the drive, alignment and system normalization. f ) trial run and defect rectification, if any. g ) if bearing flange is replaced while bearing replacement, it will be treated as one unit. h ) cutting / welding required for the job comes under contractor’s scope. ‘or’ flap gate actuator replacement: a ) shifting of new / repaired actuator at site. b ) removal of old actuator and fixing of new actuator. c ) shifting of old actuator to chp workshop. d ) operation checking of flap gate and defect rectification, if any. e ) overhauling of the replaced actuator. or replacement of flap gate trunnion bracket : a ) shifting of new / repaired trunnion bracket at site. b ) removal of old trunnion bracket and fixing of new trunnion bracket. c ) operation checking of flap gate and defect rectification if any d ) shifting of old trunnion bracket to chp workshop. 10.190. ( fhg / b54bd800 ) gear box ( gear replacement ) full set of gear box internals replacement: a ) it includes replacement of full set of internals of any gear box of any drive in c.h.p. b ) shifting of new / repaired gear box internal from chp store / central store / central workshop. c ) decoupling of gear box from h.s. & low speed side & shifting of motor and removal of fluid coupling, if required. d ) dismantling of gear box top cover, end covers etc and removal of its internals and removal of slow speed side coupling half. e ) mounting of coupling half / bearing on shaft and assembling of shafts in the gear box and checking for proper matching. f ) box up of gear box, placement on foundation & placement of motor, replacement of defective oil seals, if required and oil filling up to the mark. g ) system normalization after alignment. h ) if removal & mounting of fluid coupling / flexible coupling half is required, payment will be done as per sl. no. 01 i ) trial run and defect rectification, if any. j ) shifting of old gear box internals to chp workshop / central work / scrap yard. k ) any cutting / welding work will be in the scope of the contractor. 10.200. ( fhg / b51bd800 ) gear boxes ( i / p shaft ) repl replacement of gear box input shaft / shaft bearings / oil seals / complete gear box / replacement of output shaft for measurement purpose any one of them will be treated as separate unit. replacement of gear box input shaft / shaft bearings / oil seals / complete gear box: a ) replacement of input shaft / shaft bearing / oil seals of any gear box in chp comes under this. b ) shifting of shaft / shaft bearings / oil seals from central store / chp store / central store to site. c ) decoupling of input shaft from motor and shifting of motor to the required place. d ) removal of fluid coupling or brake drum / oil seals after dismantling of thruster brake, if required. e ) opening of gear box top cover etc and removal of the input shaft, oil seals, removal of bearings etc from the shaft. f ) mounting of bearings and hub on the input shaft, replacement of oil seals if required. g ) fixing of input shaft and also to be checked for proper matching with intermediate shaft. h ) box up of gear box in reverse order. i ) mounting of fluid coupling, & motor placement. j ) alignment k ) system normalization, trial run and defect rectification, if any. l ) cutting / welding required for the job comes under contractor’s scope. m ) shifting of old damaged shaft to chp scrap yard / central workshop. n ) if shaft, oil seals and bearings are replaced simultaneously, it will be counted as one unit only. or replacement of output shaft / shaft bearing / oil seals: a ) replacement of output shaft / shaft bearings / oil seals of any drive in c.h.p. comes under this. b ) shifting of new / repaired shaft / shaft bearings / oil seals at site and removal of coupling half c ) decoupling of gear box on slow speed side, removal of gear box top cover & end cover. d ) removal of output shaft / bearings / oil seals etc. e ) internal inspection & mounting of bearings and coupling half on the output shaft. f ) placement of the output shaft. g.box box up, and system normalization. replacement of defective oil seals, if required. g ) trial run and defect rectification, if any. h ) cutting / welding required for the job comes under contractor’s scope. i ) shifting of old damaged shaft / bearings to central workshop. / chp scrap yard j ) if shaft , oil seals and bearings are replaced simultaneously , it will be counted as one unit only. 10.210. ( fhg / b12bd800 ) gear boxes ( 10 50ltrs ) repl replacement of gear box oil : ( oil qty. < 50 ltrs. ) any of the following work is covered under this item. for measurement purpose any one of them will be treated as separate unit. replacement of gear box oil : ( oil qty. < 50 ltrs. ) a ) replacement of oil of any gear box comes under this having oil capacity more than 10 ltrs.. b ) shifting of oil / oil drums from chp store to the site. c ) draining of oil in a can and shifting it to chp scrap yard. d ) filling of oil in the gear box after flushing. normalisation of the system. or de coupling, coupling and alignment of ilms motor. 10.220. ( fhg / b13bd800 ) gear boxes ( 50 100 ltrs ) repl replacement of gear box oil : ( oil qty.> 50 ltrs. ) / replacement of cable reeling drum gear box for measurement purpose any one of them will be treated as separate unit. replacement of gear box oil : ( oil qty.> 50 ltrs. ) a ) replacement of oil of any gear box comes under this . b ) shifting of oil / oil drums from chp store to the site. c ) draining of oil in a can and shifting it to chp scrap yard. d ) filling of oil in the gear box after flushing. e ) normalisation of the system. ‘or’ replacement of cable reeling drum gear box : a ) replacement of crd gear box of travelling tripper comes under this .shifting of new / repaired gear box at site. b ) removal of motor after decoupling of coupling. removal of crd drum if required. c ) removal of gear box and removal of coupling half. d ) mounting of coupling half in new gear box. e ) placement of new gear box in position re assembling of motor. f ) trial run and defect rectification. 10.230. ( fhg / b00gn152 ) gear boxes ( <> ) decpl / cpl / algn alignment of lt drive ( for motor 15 kw to 200kw ) / overhauling of gear box ( below 30 kw ) / ilms gear box replacement for measurement purpose any one of them will be treated as separate unit. alignment of lt drive ( for motor 15 kw to 200kw ) : a ) if coupling pin bush replacement is required, no extra payment will be done. b ) it includes all related activity for the alignment. c ) for payment purpose, if both slow speed ( with dial gauge ) and high speed alignment is done, it will be treated as separate unit. d ) cutting / welding required for the job comes under contractor’s scope. ‘or’ overhauling of gear box ( below 30 kw ) : a ) opening of gear box. replacement of defective / worn out / damaged parts. b ) re assembling of gear box and oil filling. ‘or’ ilms gear box replacement: a ) shifting of new / repaired gear box at site. b ) decoupling and removal of motor. decoupling and removal of gear box. c ) mounting of new gear box, re assembling of motor and alignment. d ) coupling of motor, trial run and defect rectification, if any. e ) shifting of old gear box at chp / central workshop. 10.240. ( fhttr14bd800 ) travelling tripper ( lt gearbox ) repl replacement of travelling tripper travel drive gear box / alignment of ht drive ( for motor above 200 kw ) for measurement purpose any one of them will be treated as separate unit. replacement of travelling tripper travel drive gear box : a ) shifting of new / repaired gear box at site. b ) dismantling of old gear box / motor and fixing of new gear box & motor. c ) dismantling of thruster brake & refixing. d ) alignment of the drive and oil top up in new gear box after flushing. e ) normalization of the system and trial run to be taken. defect rectification, if any. f ) shifting of all materials to chp store / chp scrap yard. g ) cutting / welding required for the job comes under contractor’s scope. ‘or’ alignment of ht drive ( for motor above 200 kw ) : a ) if coupling pin bush replacement is required, no extra payment will be done. b ) it includes all related activity for the alignment ( slow speed or high speed ) . c ) for payment purpose, if both slow speed ( with dial gauge ) and high speed alignment is done, it will be treated as separate unit. d ) cutting / welding required for the job comes under contractor’s scope. 10.250. ( fhg / b00bd000 ) gear boxes ( <> ) attend defect gear box gauge glass replacement / replacement of sump pump spider of love joy coupling for measurement purpose any one of the following will be treated as separate unit. a ) gear box gauge glass replacement: b ) shifting of new / repaired gauge glass at site. c ) removal of old gauge glass after isolation and mounting of new one. d ) oil leakage job of gear box ‘ or ‘ replacement of sump pump spider of love joy coupling : a ) no payment will be made for spider of love joy coupling replacement if it is done while pump overhauling. 10.260. ( fhmat14gn863 ) matl ( misc ) shifting transportation of materials: a ) it includes transportation of any kind of material from central store or any other place inside plant to chp store or vice versa, as per direction. b ) for measurement purpose materials upto 50kg or part there off will be taken as one unit. 10.270. chp em bkdn mtc st 1 ( fhmat11gn162 ) matl ( scrap ) disposal transportation of misc. scrap: a ) it covers transportation of misc. scrap from chp area to other place inside the plant as per direction. b ) for measurement purpose transportation of one ton scrap will be taken as one unit. all arrangement for loading, unloading and transportation including supply of tractor is in contractor’s scope. 10.280. ( fhmsw00gn250 ) fabrication erection ( <> ) lighter section miscellaneous steel fabrication work in c.h.p. ( lighter section ) : a ) fabrication of ladder , platform and other miscellaneous work in chp and mgr area ( from wagon tippler to bunker floor and mgr gates ) at different elevations and different location comes under this . b ) transportation of steel from kbunl stores to work site . c ) fabrication work is to be done as per given drawing or as per direction of area engineer and placement of the same at the required place or as per direction. d ) new fabricated work is to be painted with one coat of primer paint of kbunl approved brand. paint to be provided by the contractor. e ) payment will be done on per ton basis. f ) it will be applicable for steel sheets upto 3.15mm. g ) removal of old plate / structure from location and shifting to chp scrap yard will be in the scope of the contractor. 10.290. ( fhcht00bd801 ) chutes ( <> ) repair coal leakage arresting by patch work : a ) arresting of coal dust leakage from any chute / duct in chp comes under this. b ) leakage arresting includes fabrication of required patch from ms plate ( up to 20mm thick ) and welding of the same at required place or as per direction of area engineer. c ) trial run for leakage arresting if any. d ) for measurement purpose payment will be made on per unit basis and 300 mm*300 mm will be treated as one number. 10.300. ( fhcht00gn250 ) ( fabrication +erection ) miscellaneous steel fabrication work in c.h.p. ( heavy section ) .: a ) fabrication of ladder, platform and other miscellaneous work in chp and mgr area ( from track hopper to bunker floor and mgr gates ) at different elevations and different location comes under this . b ) transportation of steel from kbunl stores to work site . c ) fabrication work is to be done as per given drawing or as per direction of area engineer and placement of the same at the required place or as per direction. d ) new fabricated work is to be painted with one coat of primer paint of kbunl approved brand. paint to be provided by the contractor. e ) payment will be done on per ton basis. f ) removal of old plate / structure from location and shifting to chp scrap yard will be in the scope of contractor. 10.310. ( fhdep00gn602 ) deptt <> man.dep sw manpower supply sw manpower supply for other miscellaneous work ( as per direction of engr in charge ) . necessary t&ps required for supply job will be provided by contractor ( as per t&ps list ) . sw ( fitter / rigger / welder ) 10.320. ( fhdep00gn600 ) deptt <> man.dep usw manpower supply usw manpower supply for other miscellaneous work ( as per direction of engr in charge ) . necessary t&ps required for supply job will be provided by contractor ( as per t&ps list ) usw ( helper ) 10.330. ( fhscc13gn250 ) crushers ( bkr plate ) fabrication crushers ( bkr plate ) fabrication / deck plate fabrication of vs assembly making breaker plate for crusher ( one full set consisting of four piece small / 02pc big size ) a ) marking of breaker plate as per drawing and instruction of area engineer. b ) cutting of breaker plate. c ) transportation of breaker plates from chp steel yard to central workshop for drilling. d ) transportation of breaker plates from central workshop to chp crusher house / store area after drilling. drilling of holes will not be in the scope of the agency. payment will be made as ( 04 nos = 01 unit ) or a ) fabrication of deck plates of vibrating screen 10.340. conv pulleys ( <> ) brg inspection: fhcnp00bd799 conv. pulley ( <> ) brg inspection bearing inspection for conveyor pulley / crusher / bearings of wheels of mobile equipment’s stacker , travelling tripper bearing inspection a ) inspection of bearings ( both end ) of any conveyor pulley in chp. b ) supply of all t&ps and manpower will be in the scope of the agency. c ) all related jobs for bearing inspection will be in the scope of the agency. d ) greasing of bearings after inspection to be done by the agency. 10.350. ( fhbcn02pm002 ) belt conveyor 02 w checks belt conveyor 02 w checks 1. any conveyor in chp is covered under this item. 2. check all idlers for free rotation. 3. replace defective idlers / idlers frame / guide rollers, 4. adjust / replace the skirt rubber, scrapper rubber & dust curtains. 5. check the belts for any sway, train as required. 6. check the thruster oil level, top up if required .adjust the thruster brake. 7. check the gear box & fluid coupling oil level / leakage, top up if required. clean the gear box breather. 8. check the belt joints for any ply separation, check the belt for any damage, cut mark etc.& report. 9. check pulley bearing for overheating, noise etc. check the temp. of gear box. check oil pressure if gauge is provided. 10. check that take up travel is free; there is no deformation in its guide. 11. tighten all foundation bolts of motor, gear box, pulley, plumber block etc. 12. any cutting / welding / tacking of idler with frame is in the scope of contractor. 10.360. ( fhbcn02pm004 ) belt conveyor 04 w checks belt conveyor 04 w checks 1. any conveyor in chp is covered under this item. 2. repeat items 2, 3, 4, 5, 6, 7, 8, 11&12 of job sl.no. – 35 3. check tightness of fan bolts & foundation bolts of drive & pulley. 4. check for any leakage from the seals of gear box fluid coupling and report. 5. check the play in pin & bush coupling and report if bushes are damaged. 6. inspect pulley lagging for wear / damage & report. 7. check the pulley for any crack; tighten the locking assembly bolts by torque wrench unto adequate torque. 8. check that there is no deformation in take up guide. 10.370. ( fhbcn02pm012 ) : belt conveyor 12 w checks belt conveyor 12 w checks 1. any conveyor in chp is covered under this item. 2. repeat all items of sl. no. –36. 3. check oil level of fluid coupling, top up if required. 4. grease pulley bearings & gear coupling & take up guides. 5. check proper functioning of thruster brakes adjust, if required. 10.380. ( fhilm00pm002 ) : ilms 02 w checks ilms 02 w checks 1. any in line magnetic separator in chp is covered under this item. 2. inspect belt for any damage. check belt sway / belt tension, adjust, if required. 3. check gear box oil level, top up, if required. check tightness all foundation bolts. 4. adjust / replace the skirt rubber. 10.390. ( fhilm00pm004 ) ilms 04 w checks ilms 04 w checks 1. any in line magnetic separator in chp is covered under this item. 2. repeat all items of job sl.no. – 38 3. grease all bearings of plumber blocks. grease the screw take up. 10.400. ( fhgzf00pm002 ) : grizzly feeder 02 w checks grizzly feeder 02 w checks 1. any grizzly feeder in crusher house is covered under this item. 2. check tightness of the foundation bolts of motor, grizzly feeder bearing housing, seal cover and any other. 3. ch. tightness tray fixing bolts, chute fixing bolts, counter weight, fixing bolts. 4. check coal leakage from gf, adjust / replace rubber dust seals. 5. clean the deck and check the welding . 6. check welding of liners. 7. check the condition of spring & reports. 8. clean the bypass chute. inspect the deck sidewalls for any crack & report. 9. any cutting / welding required is in the scope of contractor. 10.410. ( fhgzf00pm004 ) : grizzly feeder 04 w checks grizzly feeder 04 w checks 1. any grizzly feeder in crusher house is covered under this item. 2. repeat all items of job sl.no. – 40 3. grease all bearings. check condition of universal joints & propeller shaft. 10.420. ( fhpcc00pm002 ) : crushers ( <> ) 02w chks crushers 02w chks 1. any crusher in crusher house is covered under this item. 2. check the condition of hammers and report. 3. ch. gear box oil levels, top up, if required. clean the air breather / replace the gauge glass if required. remove foreign materials from tramp iron box. 4. check for any coal leakage from manholes, inspection holes etc. & arrest the leakage. 5. check tightness of all cage fixing bolts, housing bolts etc. 6. check breaker plate, shaft disc key , screen plate, frame fill piece, v shaped deflector plate, screen plate arm, liners, screw jack ( cage adjuster ) , screen clamp bar for wear and report. check the tightness of bolts and weld the bolts, if required. 7. check tightness of all bolts & nuts of gear box fan, plumber blocks & foundation bolts. 8. clean the pressure equaliser line. 9. any cutting / welding required is in the scope of contractor. 10.430. ( fhpcc00pm004 ) : crushers ( <> ) 04w chks crushers 04w chks 1. any crusher in crusher house is covered under this item. 2. repeat all items of job sl.no. – 42 3. grease nde & de bearing of crusher, cage adjusting device. 4. check fluid coupling oil level, top up, if required. ( to be done after three months ) 5. inspect breaker plate holding plate and report. 10.440 ) . ( fhttr00pm002 ) : traveling tripper 02 w checks traveling tripper 02 w checks 1. any traveling tripper in chp is covered under this item. 2. check all idlers of the tripper for free rotation / abnormal noise. 3. replace the defective idlers / idler frames. place fallen idlers. 4. check oil level / oil leakage of travel drive gear box, crd gear box and thruster, top up, if required. check / adjust tightness of thrustor brake shoe. 5. check and adjust tripper hand brake / rail cleaner. 6. check tightness of all foundation bolts of motor, gear pulley etc 7. check flap gate actuator is operating freely & closing properly. 10.450 ) . ( fhttr00pm004 ) : traveling tripper 04 w checks traveling tripper 04 w checks 1. any traveling tripper in chp is covered under this item. 2. repeat items 3, 4, 5 , 6 & 7 of job sl.no. – 44 3. check gear box air breather for clogging, clean, if required. 4. check pin bush for coupling and report for replacement, if required. 5. check tripper rail welding joints. check tightness of rail supporting structure bolts at joint, if welding is broken. 10.460 ) . ( fhs / r00pm002 ) : stacker 02 w checks stacker 02 w checks a ) boom conveyor: 1. check all idlers for free rotation, replace defective idlers / idler frame. 2. check / adjust / replace skirt rubber, scrapper rubber, dust curtains. 3. check the belt for any sway, train, if required. 4. check the oil level, top up if required. clean the air breather. 5. check free movement of thrusters, clean dust etc. from moving zone. b ) intermediate conveyor : 1. check all idlers for free rotation, replace defective idlers. 2. check / adjust / replace skirt rubber, scrapper rubber, dust curtains. 3. check the belt for any sway, train, if required. 4. check the oil level, top up if required. clean the air breather. 5. check free movement of thrusters, clean dust etc. from moving zone. c ) pcrd / ccrd 1. check proper functioning of pcrd / ccrd, rectify if required. 2. check tightness of chain, sprocket, and foundation bolts etc. 3. check oil level of angle gear box, top up, if required. 10.470 ) . ( fhs / r00pm004 ) stacker 04 w checks stacker 04 w checks a ) boom conveyor : 1. check and adjust / replace the rubber strip of scrappers / skirt rubber. 2. check the oil level of gear box, top up, if required. clean the air breather, if required. 3. check for any leakage from the seals of gear box, fluid coupling. 4. check the play in pin bush coupling, report for replacement, if required. 5. inspect pulley lagging for wear / damage. 6. tighten all foundation bolts of motor, gear box, pulley. 7. check the screw take up travel is free and there is no deformation in its guides. check the belt tension, tighten, if required. 8. check functioning of thrusters / thrustor brakes, rectify as required. b ) intermediate conveyor : 1. check and adjust / replace the rubber strip of scrapper / skirt rubber. 2. check oil level of gear box, top up, if required. clean the air breather. 3. check for any leakage from the gear box, fluid coupling. 4. check the play in pin push coupling, report for replacement, if required. 5. check pulley lagging for wear / damage. 6. tighten all foundation bolts of motor, gear box, pulley. 7. check that screw take up guide travel is free and there is no deformation in its guide. check belt tension, tighten, if required. 8. check functioning of thrustors / thrustor brakes, rectify as required. c ) pcrd / ccrd 1. check the freeness of cable rollers. 2. check & adjust cable and cable guide. 3. check the angle gear box oil level, top up, if required. 4. check tightness of foundation bolts, chain, sprocket etc. 5. grease all plumber block bearings. 6. check tightness of chain, sprocket and foundation bolts etc. 10.480 ) . ( fhfpg00pm004 ) flap gate 04 w checks flap gate 04 w checks 1. any flap gate in chp is covered under this item. 2. check oil level in the actuator gear box, top up, if required. 3. grease both side bearing of flap gate and actuator. 4. check actuator is operating freely & closing properly both sides. 5. check tightness of foundation bolts. 6. check for any wear of the flap gate surface & report. 7.check for any possible coal passing through flap gate. 8. any cutting / welding required is in the scope of contractor. 10.490 ) . ( fhrpg00pm004 ) rake & pinion gate 04 w checks rake & pinion gate 04 w checks 1. any rake & pinion gate in crusher house is covered under this item. 2. oil top up in the rpg’s both gear boxes, if required. 3. check freeness of chain sprocket wheel. 4. greasing of all the bearings. 5. check tightness of all the foundation bolts. 6. check rack & pinion gate assembly for freeness. 10.500 ) . ( fhpit03pm004 ) sump pumps 04 w checks sump pumps 04 w checks 1. for measurement purpose one pump of t / h sump pumps / lwtp vertical pump will be taken as one unit. 2. greasing of pumps bearings. 3. check the rubber spider of the coupling, replace, if required. 4. check the play in pump motor coupling, adjust, if required. 5. check tightness of foundation bolts. 6. check leakage from pipe joints & valve gland. 7. check freeness of nr valve and gate valve. 10.510 ) . ( fhdes00pm004 ) : de / ds system 04 w chks. de / ds system 04 w chks / water line checking / general checking and defect rectification of ventilation system / general checking of de system any of the following work is covered under this item. for measurement purpose any one of the following will be treated as separate unit. general checking and defect rectification of dust suppression system in tps, stacker, crusher house & wagon tippler area . pump: a ) greasing all bearings of the pump. b ) replacement / tighten the gland packing of the pump as required. c ) check any water leakage and report. check pin bush coupling condition, replace if required. d ) check tightening of all foundation bolt. or water line checking: a ) clean the pump suction strainer ( pot strainer ) & y strainer. b ) attend water leakage if any , including from hose pipe. c ) check the spray nozzle condition and report. or general checking and defect rectification of ventilation system. a ) greasing of all bearings. b ) check v belt condition, replacement and alignment if requiared. c ) check tightness of all foundation bolt. d ) rotate the fan impeller by hand and report if any abnormality is observed. e ) check the stud nut tightness of impeller. or general checking of de system. a ) greasing of all bearings. check v belt condition, replacement and alignment if required. b ) check tightness of all foundation bolt. c ) rotate the fan impeller by hand and report if any abnormality is observed. d ) check the stud nut tightness of impeller. e ) cleaning of rotary lock feeder unit and its discharge pipe. 10.520 ) . ( fhmsl01bd800 ) — de / ds / service water line & fire line defect attend replacement of pipe line , replacement of gate valve / nrv / laying of pipe line replacement of pipe line , replacement of gate valve / nrv a ) ds / de / service water line in chp / fire water b ) shifting of new pipe line at site and replacement of old pipe line. c ) any cutting welding required for the job comes under this. d ) while replacement necessary flange, gasket, fittings are also to be changed, if required. e ) shifting of old pipe line to chp scrap yard. trial run and defect rectification. f ) for measurement purpose a segment of 01 mtr length or part there of will be treated as one unit for pipe line up to 65 nb . g ) for measurement purpose a segment of 01 mtr length or part there of will be treated as 1.2 unit for pipe line 80 nb and above . or laying of pipe line a ) it covers laying of pipe line ( with fittings ) in ds / de / service water line in chp / fire water. b ) shifting of new pipe line at site. c ) while laying of pipe line necessary flange, gasket, fittings are also to be provided, if required. any cutting welding required for the job comes under this. e ) trial run and defect rectification. g ) application of 2 coats of red oxide primer paint on the pipe, red oxide primer paint is in the partys scope. h ) for measurement purpose a segment of 2mtr length or part there of will be treated as one unit for pipe up to 65nb. i ) for measurement purpose a segment of 2 mtr length or part there of will be treated as 1.15 unit. for pipe 80nb and above. 10.530 ) . ( fhlpp01bd000 ) ds pump gland packing rep. or adj. / ds pump coupling pin bush rep. / ds / de pump / fan bearing greasing / servicing of solenoid valves in ds line ‘or‘ replacement of v bells ( full set ) / rep.of vent. fan air filter / dust suppression system nozzles nipple fixing / cleaning of spray nozzles in dust suppression system any of the following work is covered under this item. for measurement purpose any one of the following will be treated as separate unit. ds pump gland packing replacement / adjustment: a ) replacement / adjustment of the gland packing of the pump for arresting water leakage. ( one side or both side as required ) . trial run and adjustment of the glands. or ds pump coupling pin bush replacement : replacement of full set of pin bush will be taken as one unit. or cleaning of y strainer in ds line : removal of the y strainers from the system, cleaning it upto the satisfaction and re fitting at original position. or servicing of valves in ds line: a ) dismantling of solenoid v / v, replacement / repairing of defective parts and reassembling. or replacement of v bells ( full set ) : a ) removal of fan belt guard. removal of damaged v belts. shifting of new v belts and fixing on the v pulley. alignment of the pulleys. trial run and defect rectification. or replacement of ventilation fan air filter ( 01 no = 01 unit ) : a ) removal of air filter from system. b ) shifting of new / repaired air filter and installation. c ) drying of the filter and fixing back to its original location. d ) rectification of minor repair is for the filters if required, or greasing of fan / pump bearings ( both bearing ) or dust suppression system nozzles nipple fixing a ) nipple to be fabricated from ½ inch, medium duty pipe, length of nipple will be 3 to 4 inches. b ) removal of damaged nipple & fixing of new . c ) fixing of spray nozzle on the nipple. or cleaning of spray nozzles in dust suppression system : a ) removal of spray nozzles from the dust suppression system. dismantling of nozzles , cleaning and re fixing it at original position. b ) for payment purpose 05 nos. of nozzles or part thereof will be treated as one unit. 10.540 ) . ( fhdes01bd800 ) replacement of fire sprinklers / replacement of fire hydrant valve / repairing of fire hydrant valve any of the following work is covered under this item. for measurement purpose any one of the following will be treated as separate unit. replacement of fire sprinklers : a ) isolation of the sprinkler line from water side if required. removal of damaged sprinkler and fixing of new one. charging of the line with water and leakage arresting if any. or replacement of fire hydrant valve: a ) replacement of any fire hydrant valve in chp is covered under this. b ) shifting of new / repaired fire hydrant valve to site and replacement of the defective valve. c ) shifting of damaged fire hydrant valve to chp workshop. or repairing of fire hydrant valve: a ) dismantling of fire hydrant valve, replacement of defective parts and re assembling. b ) spares will be provided by kbunl free of cost. however, for rubber washer, it is to be cut from rubber sheet, supplied. 10.550 ) . ( fhmsl01bd000 ) water leakage arresting from pipe line / flange ( above ground ) leakage arresting includes welding / gasket replacement / pipe fitting replacement, if any. 10.560 ) . ( fhmsl01bd801 ) / ms piping ( dia<=6 ) repair water leakage arresting from pipe line / flange ( under ground ) a ) leakage arresting includes welding / gasket replacement / pipe fitting replacement, if any. b ) dewatering of the pit, if required. dewatering pump will be provided by kbunl free of cost, if available. c ) proper cleaning of pipe surface for welding at leakage area & leakage arresting through patch work or as per direction of area engr. d ) if more than one leakage is found in one digging, it will be treated as one unit. e ) underground pipes are at 1.5m depth ( approx. ) . f ) application of wrapping & coating on pipes / patches etc. all materials in the partys scope. . 10.570 ) . ( fhdep00gn624 ) ( deptt <> manpower gang ( adl ) ) maintenance jobs per shift ( shift maintenance ) : 1. contractor has to deploy 02 ( 1 welder + 1 fitter ) , and 2 helper and one rigger for chp mechanical maintenance in shift as and when asked by eic. 2. they will be deployed for emergent type of job which are mentioned below: 3.oil topping up in gear box / fluid coupling 4. removal & fixing of coupling guards 5. opening & closing of front & back doors of crushers. 6. assistance in changing of flap gate during path selection. 7. v belt replacement if required 8. adjustment / replacement of skirt rubber 9. belt scrapper replacement / adjustment 10. patching of chute puncture 11. belt training if required 12. removal / replacement of idlers if required 13. any job assigned by eic. 10.580 ) . misc. maint. work ( code: fhmsw00bd000 ) misc. maint. work defect liability period: 01 month. a ) .cat a ( completion period 04 hrs. ) 01. belt weight, counter weight adjustment 02 key preparing / key way repair 03 hydraulic jack repair. 04 canopy cover making & fixing. 05 back plate removal & fixing. 06 inspection door removal & fixing. 07. hold back removal & fixing. 08. wiper replacement & fixing. 09. pcrd / ccrd guide roller repair replacement ( per roller ) . 10. chute chocking removal. 11. limit switch / striker fixing / sr striker fixing . 12. oil topping / oil replacement ( 01 to 50 liters ) 13. removal of hold back engagement bolt ( per conveyor ) 14. cutting set / welding m / c. shifting / material shifting 15. breather plug and gauge glass cleaning / fixing ( per gearbox ) . 16. walk way step repair & fixing 17. hs coupling bolt and bush replacement ( per coupling ) . 18. fcu oil adjustment ( per fcu ) . 19. suspension bar locking per bar. 20. coupling bolt locking through welding per bolt ( ls ) . 21. inspection cover fixing. ( per chute ) 22. crusher door sealing per crusher. 23. bearing checking / greasing ( per bearing ) . 24. r.p.g opening and closing. 25. fixing / removal of zss. 26. coupling & decoupling of equipment’s. 27. pcrd / ccrd cable positioning. 28. rail fish plate bolt replacement. 29. take up wire rope greasing / lubricating compound. 30. flap gate actuator arm pin removal & fixing. 31. hose / pipe clamp fixing 32. bolt fixing in chute bolt hole. 33. belt training / belt swaying to be aligned. 34. o ring rubber chord to be provided in input / output shaft of gear box. 35. vs ‘v’ belt set replacement & alignment. 36. fastening of belt by belt fastener ( 02 fastener for 1no.cat a ) 37. vs upper deck and lower deck repairing 38. misc. belt related jobs 10.590 ) . misc. maint. work ( code: fhmsw00bd001 ) misc. maint. work defect liability period: 01 month. a ) .cat b ( completion period 06 hrs. ) 01. gear box / conveyor ls coupling bolt removal & fixing 02. winch m / c shifting & welding at location. 03. sealing belt tensioning ( per conveyor ) / bunker sealing ( per unit ) 04. hold back replacement. 05. l.s. coupling bolt replacement ( per bolt ) 06. crusher cooler servicing. 07. chute flange joint leakage sealing / arresting by welding. 08. inspection cover replacement. 09. crusher rotor locknut tightening. / cr. bearing lock nut tightening. ( per crusher ) 10. v.s. hinge bush block replacement. 11. tripper / sr crack & broken wheel repairing. 12 fcu multi disc replacement. 13. foreign material removal. 14. r.p.g gear box replacement. 15. elect. brake shoe / manual brake adjustment / repairing. 16. gear box inspection cover removal for internal inspection 17.welding of rail / conveyor short support / stringer post / ladder repair. 18. grill repairing. 19. fg shaft bolt replacement. 20. repair of rail crack by welding. 21. shaft repairing ( welding / grinding ) . 22. chute block switch positioning and repairing. 23. pcrd / ccrd hanger repairing of sr / mt etc. 24. motor / gear / tail pulley / head pulley etc canopy or guard / cover preparing & fixing 25. key way making. 26. key making for coupling. 10.600. code: fhwgt00pm002 02 weekly checks of wagon tippler ( completion period 08 hours ) a. checking / repairing of ls & hs coupling bolts. b. checking / repairing of gear box oil level. c. checking / repairing of structures ( ballast container , way bridge, rail table, etc. ) d. checking / repairing of pinions. e. checking / repairing of connecting shafts. f. checking / repairing of power lever. g. checking / repairing of spill plates &rollers. h. checking / repairing of civil foundations. i. checking / repairing of all plummer blocks. j. checking / repairing of bull gears. k. checking / repairing of splice joints of structures. l. checking / repairing of otls switch etc. m. checking / repairing / installation of brake shoes. n. greasing of bearings by grease gun. o. checking & repairing of load shell & weigh bridge. p. spill plate roller & bracket checking / repairing. 10.610 ) code: fhwgt00pm004 04 weekly checks of wagon tippler ( completion period 10 hours ) a. checking / repairing / replacement of ls & hs coupling bolts. b. checking / repairing of gear box oil level. c. checking / repairing of structures ( ballast container , way bridge, rail table, etc. ) d. checking / repairing of pinions. e. checking / repairing of connecting shafts. f. checking / repairing of pall lever. g. checking / repairing of spill plates &rollers. h. checking / repairing of civil foundations. i. checking / repairing of all plummer blocks. j. checking / repairing of bull gears. k. checking / repairing of splice joints of structures. l. checking / repairing of otls, cam switch etc. m. checking / repairing of brake shoes. n. greasing of bearings by grease gun. o. providing of servo coat 140 on pinion & bull gear. p. all points of 02 weekly checks. 10.620 ) code: fhwgt00pm012 12 weekly checks of wagon tippler ( completion period 10 hours ) a. checking / repairing / replacement of ls & hs coupling bolts. b. checking of gear box oil condition / replacement if required. c. checking / repairing / replacement ( partly ) if required. ( ballast container , way bridge, rail table, etc. ) d. checking of bearing clearances of pinions & replacement if required. e. checking / repairing / alignment of connecting shafts. f. checking / repairing / adjustment of pawl lever. g. checking / repairing / replacement of spill plates & rollers. h. checking / repairing of civil foundations. i. checking / repairing of all plumber blocks. j. checking / repairing / replacement of bull gears ( partially ) if required. k. checking / repairing of splice joints of structures. l. checking / repairing of otls, cam switch etc. m. checking / repairing of brake shoes. n. greasing of bearings by grease gun. o. all points of 02 weekly & 04 weekly checks. 10.630 ) . code: fhwgt00gn402 inspection of wagon tippler / calibration ( completion period 04 hours ) a. checking of ls & hs coupling bolts. b. checking of gear box oil level. c. checking of structures ( ballast container , way bridge rail table, etc. ) d. checking of pinions. e. checking of connecting shafts. f. checking of pawl lever. g. checking of spill plates & rollers. h. checking of civil foundations. i. checking of all plummer blocks. j. checking of bull gears. k. checking of splice joints of structures. l. checking of otls, cam switch etc. m. checking of brake shoes. n. checking of top stop clamps and side supports & rubber o. checking of photo sensor for operation. p. weigh bridge & load shell checking 10.640 . ( fhscc00gn402 ) crushers / vibrating screen ( <> ) inspection ( a ) . remove top cover of the secondary crusher to facilitate internal inspection & cleaning. ( b ) . replace missing / loose / broken fasteners of the breaker plate / cage screen / kick off plate / tramp iron tray / end disc liner etc. ( c ) . refix the same after work is over. or ( a ) .check the condition of support springs and do the necessary adjustment / replacement. ( b ) . check and rectify the defect in the tray and its structural members. ( c ) . check receiving and discharge chute liners and report. rectify minor repair in the coffin box. ( d ) . replace the worn out skirt rubber / dust curtain. ( e ) . any other minor work has to be carried out as per direction of eic. 10.650 fheoh00oh000 ( elec hoists ( <> ) serv ) a ) . placing the hoist at suitable position for maintenance and arrange proper approach for maintenance ( b ) . opening the housing drum cover of hoist. ( c ) . checking of gears / gear box internals. repair / replace as required. clean and grease all the gears ( d ) . checking, cleaning & lubricating the bearings. replace the bearings, if reqd. ( e ) . checking the rope drum & repair / replace the parts as required. lubricate the parts needing lubrication. ( f ) . checking the rope for any defect and broken strands, replace the rope if required. clean, lubricate the rope. ( g ) . checking the load hook block assembly. clean & grease the parts. attend the defect. also check the hook for any cracks / deformation. ( h ) . cleaning and greasing guide ring and retaining ring to ensure rotation / reeling. ( i ) . checking of all the bolts, nuts and tension bar ensuring proper tightness and good condition. ( j ) . check the travel wheel and its mechanism and repair / replace as required. ( k ) . take trial of hoist on both the ends. ensure proper mechanical stopper. also check the hoist operation by lowering / raising as per limit. ( l ) . ensure proper braking of hoist on no load as well on load both. ( m ) . checking of hoist for any other defect and rectify the same. 10.660 ( fhsai00gn869 ) self algn idlr ( <> ) servicing ( servicing of trainer idler / repair of carrying / return / impact idlers ) completion time 02 hours. defect liability period 03 months. for payment purpose repair of one idler or one self adjustable frame will be considered as one unit. ( i ) servicing of trainer idler ( a ) removal of self aligning troughing trainer & return side trainer complete assembly from its position. ( b ) over haul the pivot bearing & bush by cleaning the old grease with solvent / cleaning agent, and then regrease the bush / bearing. if required, replace the bearing. ( c ) separate cloth to be used for removing the old grease, and wiping off the solvent from the bearing to avoid contamination. ( d ) optimum grease to be used such that the pivot bush / bearing is properly lubricated. grease shall not be wasted by overfilling in the housing. ( e ) re fix the complete frame back in its position, and properly tighten the bolts. if the bolts are damaged, or missing, then new bolts are to be fixed so that the frame is properly secured. ( f ) grease, bush / bearing & fasteners shall be provided by ntpc. rest all the materials & tools for cleaning to be provided by the contractor. ( g ) after complete servicing of the self adjusting idlers, clean the deposited coal on the surface of remaining rollers by soft hammering and poking. ( h ) if required, rollers are to be removed from the frames for cleaning, coal to be cleaned from the frame slots, and near bearing housing & then fixed back. ( i ) if required, also check the rollers of the assembly for their freeness, and if jammed or damaged, rollers shall be replaced. payment for roller replacement shall be made separately. ( ii ) repair of carrying / return / impact idlers ( a ) . shift damaged rollers from site or wherever dumped to work location. ( b ) . dismantle roller internals like seals, bearings, and shaft etc. ( c ) . clean roller internal properly. ( d ) . select roller shells in good condition. ( e ) . repair damaged shaft by cutting / welding / grinding. ( f ) . assembly of roller with new / good condition bearings, seals, bushes and circlips and check freeness. ( g ) . apply one coat of red oxide primer over the roller surface and put serial number on the same. total quantity :...

Eastern Railways - Bihar

43178717 supply & fitment of spare parts of hydraulic road cranes ( item 1 ) rope extension, pt.no.22 c 3 039 of escorts ( qty 2 no. ) , ( item 2 ) winch rope, pt.no.7201095 ( qty 1 no ) , ( item 3 ) winch assembly, pt.no. y05.51.902.0 of escorts ( qty 2 no. ) & ( item 4 ) wire rope, pt.no.yl.5328 / 1 / 63 of escorts ( qty 3 no. ) make es corts. [ warranty period: 30 months after the date of delivery ] ...

Ministry Of Power - Bihar

42069098 bids are invited for m6313190500 elec pwr drvn winch, 5ton_ 100235662 (q3) total quantity : 8...

Department Of Science And Technology - Bihar

41628622 bids are invited for engg mechanics lab universal force table apparatus, polygon of forces apparatus, simply supported beam apparatus, combined inclined plane and friction slide apparatus, screw jack, movement of inertia of flywheel: 20 cm dia., a chain pulley block 2 tons capacity, youngs modulus apparatus (searles pattern):, parallelogram of forces apparatus, pulley system different type, worm & worm wheel. single with weight, worm & worm wheel. double with weight, wheel & differential axel 30 cm with weight, winch crab single purchase with weight, winch crab double purchase with weight(q3) total quantity : 1...

East Central Railway - Bihar

41536321 supply of cnc ( computer numerical control ) under floor wheel lathe ( bg ) with shed plus winch as per specification no. ecr / cnc ufwl ( bg ) with works / 2023 ( based on cofmow specification no. cofmow / ir / m / cnc ufwl ( bg ) with works / 2019 ) . [ warranty period: 30 months after the date of delivery ] , comprehensive annual maintenance contract ( camc ) of cnc under floor wheel lathe for five ( 5 ) years after 2 year warranty period. [ warranty period: 30 months after the date of delivery ] ...

Department Of Science And Technology - Bihar

40828924 bids are invited for civil engineering lab equipment universal force table appartus polygon of force apparatus simply supported beam apparatus combined inclined plane and friction slide appartus screw jack movement of inertia of flywheel :20cm dia a chain pulley block 2 tons capacity young modulus apparatus ( searles pattern ) parallelogram of forces apparatus pulley systim different type worm & worm wheel . single with weight worm & worm wheel . double with weight wheel & differential axel 30cm with weight winch crab single purchase with weight winch crab double purchase with weight total quantity : 1...

Department Of Science And Technology - Bihar

40827977 bids are invited for eng mechanics lab ( q3 ) universal force table appartus polygon of force apparatus simply supported beam apparatus combined inclined plane and friction slide appartus screw jack movement of inertia of flywheel :20cm dia a chain pulley block 2 tons capacity young modulus apparatus ( searles pattern ) parallelogram of forces apparatus pulley systim different type worm & worm wheel . single with weight worm & worm wheel . double with weight wheel & differential axel 30cm with weight winch crab single purchase with weight winch crab double purchase with weight total quantity : 1...

National Thermal Power Corporation Limited - Bihar

40696821 tender for procurement of spares for alikraft make lifts for ntpc nabinagar 1 magnetic coil, 31000 01 007, sew eurodrive 2 brake disc, 3200 007, sew eurodrive 3 pressure plate, 3200 008, sew eurodrive 4 rectifier, sew, 31000 01 002, alikraft 5 worm wheel, 1900 107, alikraft 6 o ring, 3000 136 431, alimak 7 o ring, 1700 121, alikraft 8 oil sealing ring, 1700 118, alikraft 9 sealing ring, 1900 110, alikraft, ak 400 10 guide roller, 4000 107, alikraft, ak 400 11 manual release cable, 3200 035, alikraft 12 guide roller, 4000 102, alikraft, ak 400 13 pinion, 170000705, alikraft 14 coupling, male, 170000717, alikraft 15 coupling, female, 170000715, alikraft 16 intermediate flange, 1700 114, alikraft 17 complete brake nave, 2100 201c, alikraft 18 coupling spider, 3100 001 005, alikraft 19 up limit switch, 3100 001 006 01, alikraft 20 down limit switch, 3100 001 006 02 21 guide roller, 9000 117, alikraft, ak 400 22 roller, 9000 106, alikraft 23 spring, 1200 103, alikraft, ak 400 24 control transformer, 3200 037, alikraft 25 cage dr limit switch, 3200 048, alikraft 26 proximity sensor sw, 3200 023, alikraft 27 ot limit switch, 3200 039, alikraft 28 key switch, 3200 020, alikraft 29 iso switch handle, 3200 046, alikraft 30 push button, 3200 019, alikraft 31 battery charger, 3200 053, alikraft 32 selector switch, 3200 022, alikraft 33 preventer, 3200 062, alikraft, 1ph 34 vfd, 4000 020, siemens 35 resistance box, 3200 076, alikraft 36 releasing tool, 3100 103, alikraft 37 complete cable guide, 1200 201c, alikraft 38 transmitter, 3200 051, alikraft 39 frequency receiver, 3200 052, alikraft 40 isolator switch, 3200 023, alikraft 41 winch, 9038077, mekaster, elevator, tp 15 42 cable trolley assy, 9024952 080, mekaster 43 cbl trly gud roller, 9001575 102, mekaster 44 cage & safety rail, 4000101101, alikraft...

Ministry Of Power - Bihar

40216352 bids are invited for 10 electric driven winch (q3) , 20 electric driven winch (q3) total quantity : 8...

Department Of Science And Technology - Bihar

40215016 bids are invited for me all lab equip list1 ( q3 ) four bar chain mechanism of 3 slide crank mechanism set epicyclic gear train & torque holding apparatus bar pendulum or compound pendulum rope brake dynamometer prony brake dynamometer worm and worm wheel: double with weights worm and worm wheel: tripple with weights wheel and differential axle 30 cm with weight winch crab single purchase with weight winch crab double purchase with weight parallel force apparatus ( dial type 10kg balance ) simply supported beam apparatus crank lever apparatus axial forces in members of truss performance of a two stage reciprocating air compressor energy lowes pipes flat friction measuremen apparatus free and force tex flow heat transfer coefficient of composite wall apparatus stefan boltzmanns constant apparatus stefan boltzmanns constant apparatus hemispherical sectional models of screw threads hemispherical sectional models of screw threads nats standard bolt bolts of four types foundation bolts foundation bolts ( with nomenclature ) locking arrangement of bolts riveted joints ( wooden ) screw jack apparatus with weights bush bearing plummer block or pedestal bearing foot step bearing flexible coupling flanged coupling stuffing box connecting rod spark plug resistance spot welding welding hand shield welding helmet welding helmet: auto darkening helmet electrode drying oven welding gloves welding apron leg guard hacksaw blade screw thread patch gouge rog gauges ( set of 5 ) seap causes ( set of 5 ) steel scale caliper spirit level combination set surface plate with and optical flat talyar surfest two wire & three wire thread measuring instrument electrical comparator pneumatic compilator magnetic dial indicator wh total quantity : 1...

Department Of Science And Technology - Bihar

40020708 bids are invited for mechanical engineering laboratory equipment ( q3 ) universal milling machine shaper machine bench vice 6 inch hand vice 4 inch pipe vice 3 inch c clamp 6 solid frame hacksaw adjustable frame hacksaw 10 flat files 10 square files 10 triangular files scraper 8 tap and die set % to 1 / 2 hacksaw blade tin cutter steel rule 12 journal bearing test rig slip & creep measurement apparatus static & dynamic balancing apparatus whirling of shaft apparatus cam analysis machine screw jack apparatus with weights worm and worm wheel:: single with weights worm and worm wheel: double with weights worm and worm wheel: triple with weights wheel and differential axle 30 cm with weight winch crab single purchase with weight winch crab double purchase with weight universal force table ( normal ) moment of inertia flywheel parallel force apparatus ( dial type 10kg balance ) friction slide apparatus with weight heat transfer coefficient of composite wall apparatus pin fin apparatus computerized single cylinder 4 stroke crdi vcr diesel engine with open ecu &egr, with electric start and eddy current dynamometer bomb calorimeter demonstrational section working model of four stroke diesel engine. demonstrational section working model of four stroke petrol engine. demonstrational section working model of two stroke diesel engine demonstrational section working model of two stroke petrol engine hemispherical sectional models of screw threads hemispherical sectional models of screw threads nuts standard bolt bolts of four types foundation bolts foundation bolts nomenclature ) ( with locking arrangement of bolts rivetted joints wooden screw jack apparatus with weights bush bearing plummerblock or pedestal bearing foot step bearing flexible coupling flanged coupling stuffing box connecting rod spark plug slip gauge complete set vernier calliper micrometer sine bar complete set sine centre complete set vernier command protector straight edge radius gauge error gauge screws thread pitch gauge thread plug gauges ( set of 5 ) plain plug gauges ( set of 5 ) ring gauges ( set of 5 ) snap gauges ( set of 5 ) steel scale caliper johansson mikrokator sprit level combination set surface plate with stand talysurf / surf test autocollimator two wire & three wire thread measuring instruments electrical comparator pneumatic comparator dial indicator magnetic dial indicator with dial gauge magnetic stand v block set verification of maxwells reciprocal theorem continuous beam deflection test total quantity : 1...

Department Of Science And Technology - Bihar

39981554 bids are invited for mechanical engineering lab equipments ( q3 ) computerized single cylinder 4 stroke crdi vcr diesel engine with open ecu & egr, with electric start and eddy brake dynamometer bomb calorimeter demonstrational section working model of four stroke diesel engine demonstrational section working model of four stroke petrol engine cnc lathe machine cnc milling machine slotting machine turret lathe hand sheet cutting machine drill machine hand vice 4 inch pipe vice 3 inch g clamp 6 ball peen hammer, 800 g straight peen hammer, 1 kg cross peen hammer 800 g. flat chisel round nose chisel solid frame hacksaw adjustable frame hacksaw 10 flat files 10 square files 10 triangular files scraper 8 tap and die set to drill bits 1 / 8 to , 10 pc set, hacksaw blade tin cutter steel rule 12, try square 12 stainless steel blade scraper 6” combination set calipers, 10” v block 4 resistance spot welding vapour compression refrigeration test rig vapour absorption test rig apparatus heat pump test rig cooling tower test rig air conditioning test rig electrolux refrigerator test rig utm screw jack apparatus with weights worm and worm wheel single with weights worm and worm wheel:: double with weights worm and worm wheel: tripple with weights wheel and differential ade 30 cm with weight winch crab single purchase with weight winch crab double purchase with weight universal force table ( normal ) moment of inertia of flywheel parallel forces apparatus ( dial type 10 kg. balance ) simply supported beam apparatus with weights friction slide apparatus with weight crank lever apparatus performance of a two stage reciprocating air compressor total quantity : 1...

Department Of Science And Technology - Bihar

39771769 bids are invited for mechanical engineering la equipments 1 all geared lathe machine 2 norton geared lathe machine 3 universal milling machine 4 shaping machine 5 slotting machine 6 pillar drill machine 7 plastic extrusion machine 8 hydraulic power hacksaw machine 9 tool & cutter grinder 1 wood turning lathe machine 2 universal wood working machine 3 band saw machine 4 foundry shop tools shovel 10 trowel 10 lifter 10 riddle 10 vent vice 10 draw spike 10 reamer 10 smoothers 10 slicks 10 cope & drag 10 mallet 10 swab 10 spur cutter 10 single plate patterns 5 loose piece patterns 5 patterns having cores ( wooden ) fluid mechanics & hydraulic machinery lab 1 determination of metacentric height apparatus. 2 impact of jet apparatus3 minor losses in pipes 4 hydraulic bench apparatus — with 7 experiments. 5 heat transfer from a pin fin apparatus 6 heat transfer in a forced convection apparatus 7 heat transfer in natural convection apparatus 8 heat transfer through composite wall apparatus 9 air compressor test rig 10 digital torsion testing machine 11 sectional working model of 4 stroke petrol 4 cylinder 12 sectional working model of 4 stroke diesel 4 cylinder 13 parallel flow & counter flow heat exchanger apparatus 14 cleveland flash & fire point apparatus 15 pensky martin flash & fire point apparatus 16 sayboltviscometer . — digital 17 carbon residue test using conradsons apparatus 18 gyroscope motorised 19 static & dynamic balancing apparatus 20 universal vibration apparatus 21 journal bearing test rig 22 cam analysis machine 23 epicyclic gear train & holding torque apparatus 24 chain drive25 gear drive 26 power transmission 27 models of gears, clutches, brakes – clutch, drives 28 vapor absorption refrigeration test rig 29 refrigeration tool kit 30 window ac trainer 31 strain measurement trainer apparatus 1 slip gauge complete set a ) vernier caliper b ) vernier caliper c ) vernier caliper d ) vernier caliper e ) vernier caliper f ) inside vernier caliper g ) vernier caliper ( dial ) h ) screw vernier caliper i ) gear tooth vernier 2 a ) micrometer outside b ) micrometer outside c ) micrometer outside d ) micrometer outside e ) inside micrometer f ) inside micrometer 3 sine bar complete set 4 vernier bevel protector5 straight edge 6 gauge sets ( radius, thread ) 7 thread plug gauges ( set of 5 ) 8 plain plug gauges ( set of 5 ) 9 taper plug gauges ( set of 5 ) 10 thread micrometer 11 profile projector 12 magnetic dial indicator with dial gauge 13 ring gauge. 14 surface plate 15 snap gauge 16 comparator 17 roughness tester 18 stain gauge 19 lvdt 20 flow measurement apparatus 21 temp. measurement 22 tachometer — digital 23 tachometer — analog 24 transducer set 25 pressure measurement apparatus 26 torque measurement apparatus 27 strain measurement trainer apparatus 28 load cell trainer 29 thermocouple calibration trainer 30 speed measurement trainer 1 simply supported beam 2 screw jack 3 youngs modulus apparatus ( searles pattern ) : 4 universal force table apparatus. 5 worm & worm wheel. single with weight 6 worm & worm wheel. double with weight 7 wheel & differential axel — 30 cm with weight 8 winch crab single purchase with weight 9 winch crab double purchase with weight total quantity : 1...

Department Of Science And Technology - Bihar

39653380 bids are invited for engineering mechanics lab 1 screw jack apparatus with weights 2 worm and worm wheel: single with weights 3 worm and worm wheel: double with weight 4 worm and worm wheel: triple with weights 5 wheel and differential axle 30 cm with weight 6 winch crab single purchase with weight 7 winch crab double purchase with weight 8 universal force table ( normal ) 9 moment of inertia of flywheel 10 parallel forces apparatus ( dial type 10kg .balance ) 11 simply supported beam apparatus with weights 12 friction slide apparatus with weight 13 crank forces in the members of truss ( q3 ) total quantity : 1...

Inland Waterways Authority Of India - Bihar

39412131 tender for annual repair of csd kallada for the year 2023 24; 1 the entire ship from lwl to main deck, deck plate, superstructure, bathroom, anchor, anchor rake, engine room, store rooms, hydraulic cooling pump room, spud, spud bracket, carriage, vent, cutter ladder, bollard, deck crane, railing, jet nozzle, railing chainand outside alongwith other fitment etc, are to be proper cleaned, scrapped, wire brushed, chipped and painted by 3 coats of existing colour marine paint. ( 1 coat zinc chromate primer, followed by two coat of existing colour of marine paints ) . all pipe lines should be colored as per marine color code. after it name of vessel, deptt. and logo to be made by fluorescent sticker as required as per direction of eic. 2 fabrication and installation of removable shed on deck over the engine room area including steel structure, frp sheet of good quality and other required material, labour charges all complete as required as per direction of eic. 3 labourand consumable charges 4 cost of material ( actual+10% ) 5 a good quality waterproof tarpaulin cover having size 3 m x 4.5 m to be supplied and fitted as required as per direction of eic. 6 all gauges / indicators / safety system in the engine room &control room / pannel board / wheel house are to be checked, serviced / renewed as required and calibrated as per direction of eic. 7 labourand consumable charges 8 cost of material ( actual+10% ) 9 truck tyre along with bull dog clamp and wire rope are to be supplied and fitted including labour and material as required as per direction of eic. 10 stbd side linear hydraulic motor was reported non operational, same to repaired / services as required as per direction of eic. 11 labour charges 12 cost of material ( actual+10% ) 13 entire manhole covers and rubber packing include all door and all air vent& all hatchs / tanks damaged rubber, nuts , bolts & studes same to be checked, repaired / renewed by good quality of rubber & ss fittngs as required as per direction of eic. 14 labour charges 15 cost of spares ( actual + 10% ) 16 stbd & port side railingto be straighten, faired and welded and securing with nuts and bolts including labour and material charges, same to be repair / renewable as per direction of eic 17 b check ofmain engine, ( make : catterpillar, model no.3406, ser no. 6tb3989, capacity: 325hp and ar no.7c 6843 ) , total running hours : 421 hrs, rpm digital gauge not working , exhaust temperature gauge not workingsame to be rectified / repaired / renewed ( if required ) , supply of gauge glass of expansion tank, v belt ( for dynamo drive : caterpillar 4n 8216 df, qty. 01 no. ; for gland pump drive : forech a1986 lp / a76, qty. 02 nos. ) asper direction of eic. 18 labour charges 19 cost of spares ( on actual + 10 % basis ) 20 both side anchor winch isnot working smoothly.same is to be serviced / renewed, along with renewal of pin, sleeve, bush as per direction of eic. 21 labour charges 22 cost of spares ( on actual + 10 % basis ) 23 replacement of worn out / damaged anchor wire of the swing pulleys ( dia 18 mm, length 120 m ) . the wire rope of ladder pulleys ( dia 22mm ) to be checked and if required to replaced with same length and steel grade wire rope as required as per direction of eic. 24 labour charges 25 cost of spares ( on actual + 10 % basis ) 26 fixed operator chair in the wheel house was reported damage, same to be repaired with good quality cushion and to be covered with seat cover of good quality as required as per direction of eic. 27 labourcharges 28 cost of spare / material actual + 10% basis 29 control room front glass lock was reported non functinal, same to be replaced with newer one as required as per direction of eic. 30 provision of spare for completing the repair work for boq sl. no. 01 to 11...

Inland Waterways Authority Of India - Bihar

39132187 tender for annual repair of csd mahananda at nw1 for the f.y.2023 24 ; 1 the entire ship from lwl to main deck, deck plate, superstructure, bathroom, anchor, anchor rake, engine room, store rooms, hydraulic cooling pump room, spud, spud bracket, carriage, vent, cutter ladder, bollard, deck crane, railing, jet nozzle, railing chainand outside alongwith other fitment etc, are to be proper cleaned, scrapped, wire brushed, chipped and painted by 3 coats of existing colour marine paint. ( 1 coat zinc chromate primer, followed by two coat of existing colour of marine paints ) . all pipe lines should be colored as per marine color code. after it name of vessel, deptt. and logo to be made by fluorescent sticker as required as per direction of eic. 2 both side anchor winch swing pulley isnot working smoothly.same is to be serviced / renewed ( capacity 1tons ) along with renewal of pin, sleeve, bush as per direction of eic. 3 labourand consumable charges 4 cost of material ( actual+10% ) 5 replacement of worn out / damaged anchor wire of the swing pulleys ( dia 18 mm, length 120 m ) . the wire rope of ladder pulleys ( dia 22mm ) to be checked and if required to replaced with same length and steel grade wire rope as required as per direction of eic. 6 labourand consumable charges 7 auxilary spud of the dredger was reported not holding and falling automatically, same is to be serviced / repaired and make fully operational as required as per direction of eic. 8 labour charges 9 cost of material ( actual+10% ) 10 top overhauling of both the generator engine model no. s3.8g4, make cummins , capacity: 52 bhp, speed :1500 rpm , is to be done, cooler to be cleaned, radiator to be serviced & cleaned, silencer, safety system to be checked & serviced, checking of exhaust line, repairing of exhaust lagging etc; 2 set of filters etc to be given as required as per direction of eic. 11 labour charges 12 cost of spares ( actual + 10% ) 13 installation of 500 litres capacity water tank on roof of toilet with pump of suitable capacity ( for filling the same ) with pipelines and other accessories such as valves etc. upto toilet / washroom in the vessel as per direction of surveyor / eic. 14 labour charges 15 cost of spares ( on actual + 10 % basis ) 16 fabrication and installation of removable shed on deck over the engine room area including steel structure, frp sheet of good quality and other required material, labour charges all complete as per direction ofeic. 17 labour charges 18 cost of spares ( on actual + 10 % basis ) 19 repairing of the toilet of the vessel with necessary repairing of the structures, tiles and other structural parts all complete as per direction ofeic. 20 labour charges 21 cost of spares ( on actual + 10 % basis ) 22 falls ceiling in the operating room of the dredger are reported damage, same to be renewed with good quality water proof ply with sunmica alongwith its frame as required as per direction of eic. 23 labourcharges 24 cost of spare / material actual + 10% basis 25 fixed operator chair in the wheel house was reported damage, same to be repaired with good quality cushion and to be covered with seat cover of good quality as required as per direction of eic. 26 truck tyre alongwith bull dog clamp and wire ropeto be supplied and fitted including labour and material as required as per direction of eic. 27 provision of spare for completing the repair work for boq sl. no. 01 to 11...

Ministry Of Power - Bihar

38991079 bids are invited for 1008438 10 m6313190500 elec pwr drvn winch, 5ton ( q3 ) total quantity : 2...

Ministry Of Railways - Bihar

37542727 bids are invited for supply of lc 1 ) pedestal 2 ) pedestal angle 3 ) main weight 4 ) plate weight 5 ) drum wheel with shaft 6 ) trunion bracket with a & b clamp 7 ) bell arrangement 8 ) stop board with reflector 9 ) main boom 10 ) boom 4 mtr long 11 ) boom 3 mtr long 12 ) boom 2mtr long 13 ) boom 1.5 mtr long 14 ) lock post 15 ) winch machine with handle 16 ) guy rod...

East Central Railway - Bihar

37381117 supply of wire rope, heavy duty wire rope sling for pulling type winch with standard loop and eye hook at one end weight of coach 70 ton, length 100 mtrs. rope dia 18 mm, fmc, 6x19, ungalvanised. wire rope as per is 2266:2002 or latest. brand / make dbxt or similar. [ warranty period: 30 months after the date of delivery ] ...

Eastern Railways - Bihar

36998465 procurement of set of wire ropes, derrick wire rope ( new design ) wire rope ( left ) of construction 8x26 ( iwrc ) plastic impregnated, compact strands, self lubricated, a26x390m, rgg / lgg, ordinary lay, un galvanized, 1770 n / mm2, minimum breaking load 504.7 kn with accessories as per drg. no. jmp / cr 191 / 03 ( alt 7 ) . [ warranty period: 30 months after the date of delivery ] , recovery winch wire rope ( new design ) wire rope of construction 35x7 ( iwrc ) of special design avoiding cross over between the strands of the core & reducing the danger of internal rope destruction ) , compact strands, self lubricated rotation resistant, d18x110m, lgg, langs lay, un galvanized , 1960 n / mm2, minimum breaking load 246 kn with accessories drg. no. jmp / cr 192 / 03 ( alt 6 ) . [ warranty period: 30 months after the date of delivery ] , derrick wire rope ( new design ) wire rope ( right ) of construction 8x26 ( iwrc ) plastic impregnated, compact strands, self lubricated, a26x390m, rgg / lgg, ordinary lay, un galvanized, 1770 n / mm2, minimum breaking load 504.7 kn with accessories as per drg. no. jmp / cr 191 / 03 ( alt 7 ) . [ warranty period: 30 months after the date of delivery ] , set of wire ropes ( 04 items ) as per annexure i. [ warranty period: 30 months after the date of delivery ] , aux. hoist wire rope ( new design ) wire rope of construction 35x7 ( iwrc ) of special design avoiding cross over between the strands of the core & reducing the danger of internal rope destruction ) , compact strands, self lubricated rotation resistant, d22x130m, rgg, langs lay, un galvanized , 1960 n / mm2, minimum breaking load 373 kn with accessories drg. no.jmp / cr 190 / 03 ( alt 8 ) . [ warranty period: 30 months after the date of delivery ] , main hoist wire rope ( new design ) wire rope of construction 35x7 ( iwrc ) of special design avoiding cross over between the strands of the core & reducing the danger of internal rope destruction ) , compact strands, self lubricated, rotation resistant, d26x470m, rgg langs lay, un galvanized, 1960 n / mm2, minimum breaking load 519.5 kn with accessories drg. no. jmp / cr 189 / 2003 ( alt 7 ) . [ warranty period: 30 months after the date of delivery ] ...

East Central Railway - Bihar

36888971 supply of wire ropewire rope, heavy duty wire rope sling for pulling type winch with standard loop and eye hook at one end weight of coach 70 ton, length 100 mtrs. rope dia 18 mm, fmc, 6x19, ungalvanised. wire rope as per is 2266:2002 or latest. brand / make dbxt or similar. [ warranty period: 30 months after the date of delivery ] ...

Department Of Science And Technology - Bihar

36149621 bids are invited for mechanical engineering labs screw jack apparatus with weights worm and worm wheel: single with weights worm 2 and worm wheel: double with weights worm 2 and worm wheel: triple with weights wheel and differential axle 30 cm with weight winch 2 crab single purchase with weight winch 2 crab double purchase with weight universal force table ( normal ) moment of inertia of flywheel 25 cm with weights parallel forces apparatus ( dial type 10 kg. balance ) 2 simply supported beam apparatus with weights friction slide apparatus with weight 2...

Rail Wheel Plant - Bihar

35937697 supply of esign, engineering, manufacturing, supplying , testing and commissioning of dbxt brand 1 ton capacity lifting winchesign, engineering, manufacturing, supplying , testing and commissioning of dbxt brand 1 ton capacity lifting winch, design, engineering, manufacturing, supplying , testing and commissioning of dbxt brand 1 ton capacity lifting winch as described here in after. winch particulars ( i ) capacity 1 ton ( ii ) speed 4 6 m / min ( appx. ) ( iii ) rope length 20 meters. ( iv ) power supply n415 + / 10%, 50 hz 3 phase ac. ( v ) control voltage 110v, ac ( vi ) ambient temp 45 degree c ( vii ) control pendant push button & control desk. the winch will consists of ms frame with rope drum, drum housing fitted with brg. & geared brake motor, etc, design as per is: 9507 1979 and other relevant standards. make: dbxt or similar note: material shall be accepted from oem or its authorized dealer only. guarantee / warranty shall be provide along with delivery as per irs condition. [ warranty period: 30 months after the date of delivery ] ...

Department Of Science And Technology - Bihar

35760139 bids are invited for lab equipments for workshop & me lab 1. screw jack apparatus with weights 1 2. worm and worm wheel :: single with weights 1 3. worm and worm wheel :: double with weights 1 4. worm and worm wheel :: triple with weights 1 5. wheel and differential axle 30 cm with weight 1 6. winchcrab single purchase with weight 1 7. winch crab double purchase with weight 1 8. universal force table ( normal ) 1 9. momentof inertia of flywheel 25 cm with weights 1 10. parallel forces apparatus ( dial type 10 kg. balance ) total quantity : 1...

Ministry Of Power - Bihar

35720993 bids are invited for electric_winch m6313190500 100200620 , electric_winch m6313191000 100200620 , winch machine m6313190500 100217903 total quantity : 8...

Ministry Of Power - Bihar

35720893 bids are invited for electric_winch m6313190500 100200620 , electric_winch m6313191000 100200620 , winch machine m6313190500 100217903 total quantity : 8...

Eastern Railways - Bihar

35623923 supply of procurement of wire ropes for old design of 140 ton craneprocurement of wire ropes for old design of 140 ton crane,main hoist wire rope (old design) wire rope of construction 35x7 (iwrc of special design, avoiding cross over between the strands of the core & reducing the danger of the internal rope destruction), compact strands, self lubricated, rotation resistant, d26x400m,rgg,langslay, un galvanized, 1960 n/mm2 , minimum breaking load 519.5 kn with accessories as per drg no. sk no. jmp/cr 184/03, alt. 7, make: diepa/casar/usha martin , aux. hoist wire rope (old design) wire rope of construction 35x7 (iwrc of special design avoiding cross over between the strands of the core & reducing the danger of internal rope destruction), compact strands, self lubricated, rotation resistant, d22x120m,rgg, langslay, un galvanized, 1960 n/mm2, minimum breaking load 373 kn with accessories as per drg no. sk no. jmp/cr 185/03,alt. 6 , make: diepa/casar/usha martin , derrick hoist wire rope (old design) wire rope (left) of construction 8x26 (iwrc) plastic impregnated, compact strand, self lubricated, a 26 x 130m, rgg/lgg, ordinary lay, un galvanised, 1770n/mm2 , minimum breaking load 504.7 kn with accessories as per drg no. sk no. jmp/cr 186/03,alt. 7, make: diepa/casar/usha martin. , derrick hoist wire rope (old design) wire rope (right) of construction 8x26 (iwrc) plastic impregnated, compact strand, self lubricated, a 26 x 130m, rgg/lgg, ordinary lay, un galvanised, 1770n/mm2 , minimum breaking load 504.7 kn with accessories as per drg no. sk no. jmp/cr 186/03,alt. 7, make: diepa/casar/usha martin. , recovery winch wire rope (old design) wire rope of construction 35x7 (iwrc of spl design avoiding cross over between the strands of the core & reducing the danger of internal rope destruction), compact strands , self lubricated, rotation resistant, d16x70m,rgg, langslay, un galvanized, 1960 n/mm2 , min. breaking load 197.2 kn with accessories as per drg no. sk no. jmp/cr 187/03,alt.9, make: diepa/casar/usha martin...

Department Of Science And Technology - Bihar

35602968 bids are invited for mechanical engineering lab equipment screw jack apparatus with weights , worm and worm wheel, wheel and differential axle 30 cm with weight, winch crab single purchase with weight , universal force table ( normal ) , moment of inertia of flywheel , parallel forces apparatus ( dial type 10 kg. balance ) , simply suported beam apparatus with weights, friction slide apparatus with weight, t hemispherical sectional models of screw thread, 2 bolts of four typ, 2 foundation bolts ( with nomenclatur, 2 screw jack apparatus with weigh, 2 bush bear, 2 plummer block or pedestal bear, 2 foot step bear, 2 flexible coupling...

Water Resources Department - Bihar

35339050 tender for fabrication and erection of 3 nos gate at left canal with hoisting arrangement, ms platform, 5 nos crest shutter, 40nos tie rod and 1 no replacement of u/s gate bearing and nut bolt of panchaney irrigation scheme and replacement of chequered plate of hoist bridge winch crab pinion 2 nos and 2 nos wire rope...

Department Of Science And Technology - Bihar

35114223 bids are invited for mechanical engineering lab equipment screw jack apparatus with weights , worm and worm wheel :: single with weights , winch crab single purchase with weight , universal force table ( normal ) , simply suported beam apparatus with weights , friction slide apparatus with weight , hemispherical sectional models of screw threads...

Department Of Science And Technology - Bihar

34984520 bids are invited for lab equipments for workshop & me lab 1. screw jack apparatus with weights 1 2. worm and worm wheel :: single with weights 1 3. worm and worm wheel :: double with weights 1 4. worm and worm wheel :: triple with weights 1 5. wheel and differential axle 30 cm with weight 1 6. winchcrab single purchase with weight 1 7. winch crab double purchase with weight 1 8. universal force table (normal) 1 9. momentof inertia of flywheel 25 cm with weights 1 10. parallel forces apparatus (dial type 10 kg. balance) (q3) total quantity : 1...