Planning, Design, Detailed Engineering, Fabrication, Supply, Erection, Installation, Trial Run And Commissioning Of 10000 Lit Per Day Neera Plant Out Of Which 6000 Litres Of Palm Sap Would Be Processed Into Palm Neera Drink, 4000 Litres Would Be Processed Into Palm Jaggery At Gaya Including All Structural, Electrical & Mechanical Works And Control
Tender Notice
Key Value
Ref. Documents
Ref. Documents
Ref. Documents