Carefully Removing And Dismantling Of Existing Ucrete Flooring By Appropriate Manner Like Manual & Machine Means. Proper Cutting Of Groove At Junction Joints To Be Done Properly, To Receive Bonding With Substrate. Entire Rcc Surface To Be Checked And Any Crack To Be Repaired With Epoxy Materials Before Starting The Installation Of Flooring System. Saw Cutting Construction Joints In Floor To 10Mm Wide X 10Mm Deep And Filling With Master Flex 303 Of M / S Basf Construction Chemicals India Pvt. Ltd Complete As Per Manufacturers Specifications, Removal Of Debris Etc. All Works Shall Be Executed Completely As Directed By The Banks Engineer.Please Refer To Price Bid For Full Description And Unit. Providing & Applying Of A Smooth 50Mm X 50Mm Coving At Junctions Of Floor And Wall And Continued Over The Wall Upto A Height Of 150Mm At A Minimum Thickness Of 6Mm Using Polyurethane Concrete Ucrete Rg And Over Coated With Polyurethane Ucrete Dp Top Coat Including Surface Preparation. Please Refer To Price Bid For Full Description And Unit. Providing And Applying Of A Four Component, Single Layer, Seamless, Solvent ?Free, Moisture Insensitive And Food Safe Polyurethane Concrete Flooring Systeme Of Density More Than 1950 Kg / Cu.M To Have A Smooth & Even Matt Finish. The Application Of Heavy Duty Polyurethane Concrete Flooring Shall Be Applied At A Thickness 5Mm Over A 1Mm Scratch Coat Of The Same Material By An Authorised Applicator Of The Manufacturer In Accordance To The Application Guideline As Provided By The Manufacturer And Include Surface Preparation By Mechanical Means Using Hand Grinders / Captive Shot Blasting / Scarification Machine As Required All In Complete As Per Manufacturers Instruction Removal Of Debris Etc. All Works Shall Be Executed Completely As Directed By The Banks Engineer.

Tender Notice

23411674

Reserve Bank Of India

Indian


Bihar

February 14, 2020

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Carefully Removing And Dismantling Of Existing Ucrete Flooring By Appropriate Manner Like Manual & Machine Means. Proper Cutting Of Groove At Junction Joints To Be Done Properly, To Receive Bonding With Substrate. Entire Rcc Surface To Be Checked And Any Crack To Be Repaired With Epoxy Materials Before Starting The Installation Of Flooring System. Saw Cutting Construction Joints In Floor To 10Mm Wide X 10Mm Deep And Filling With Master Flex 303 Of M / S Basf Construction Chemicals India Pvt. Ltd Complete As Per Manufacturers Specifications, Removal Of Debris Etc. All Works Shall Be Executed Completely As Directed By The Banks Engineer.Please Refer To Price Bid For Full Description And Unit. Providing & Applying Of A Smooth 50Mm X 50Mm Coving At Junctions Of Floor And Wall And Continued Over The Wall Upto A Height Of 150Mm At A Minimum Thickness Of 6Mm Using Polyurethane Concrete Ucrete Rg And Over Coated With Polyurethane Ucrete Dp Top Coat Including Surface Preparation. Please Refer To Price Bid For Full Description And Unit. Providing And Applying Of A Four Component, Single Layer, Seamless, Solvent ?Free, Moisture Insensitive And Food Safe Polyurethane Concrete Flooring Systeme Of Density More Than 1950 Kg / Cu.M To Have A Smooth & Even Matt Finish. The Application Of Heavy Duty Polyurethane Concrete Flooring Shall Be Applied At A Thickness 5Mm Over A 1Mm Scratch Coat Of The Same Material By An Authorised Applicator Of The Manufacturer In Accordance To The Application Guideline As Provided By The Manufacturer And Include Surface Preparation By Mechanical Means Using Hand Grinders / Captive Shot Blasting / Scarification Machine As Required All In Complete As Per Manufacturers Instruction Removal Of Debris Etc. All Works Shall Be Executed Completely As Directed By The Banks Engineer.