Design And Construction Of Drinking Water Supply Scheme Of Aurangabad Nagar Parishad Under Amrut And State Plan Scheme Phase Ii With Six Months Of Trial Run And Thereafter Operation And Maintenance Of System For Next Five Years. A Construction Of Elevated Service Reservoir Esr Oht-7 Nos. Of Different Capacities Ranging From 450 Kl To 1350 Kl Having Office Room And Toilet With Water Supply Arrangement At Ground Below The Tank Di Ci Hdpe Distribution Network 96.68 Km, Providing House Service Connection-1400 Nos. B Construction Of High Yielding Tubewell-12 Nos. Raw Water Pump-1 Set Approach Road 779.90 M For Cwr, Esr Clear Water Pipe Line Cwr At Barun-20.10 Km, 600 Mm Dia Di K9 Pipe Construction Of Gangway 1 Set 3000M Long 1 M Wide Lifting Arrangement 2 Set Chlorinator 200L 1 No. Construction Of Chlorinator Room 1 No. Stand Post 20 Nos. Master Elevated Reservoir 1 No. 1270 Kl Having Office Room And Toilet At Ground Floor Below Tank Area Intermediate Pumping Station 3 Nos Zone-Iii, Zone V Zone Vi Clear Water Reservoir 1 No. At Barun 1340 Kl Clear Water Pump-1 Set Clean Water Pumping Main 630 M 250Mm Dia, 600Mm Dia Clear Water Gravity Main 12.012 Km 250Mm Dia 750Mm Dia Di Ci Hdpe Distribution Network 77.81 Km Zone I Iii And Iv House Service Connection 8340 Nos. Scada System 8 Nos.
Tender Notice
Key Value
146.35 Crore
146.35 Crore
146.35 Crore