Supply And Installation Of Electromelt Auto Direct Electric Melting Of Sulphur , A. Supply Portion - Electromelt System: Auto Direct Electric Melting Of Sulphur For Batch Type Sulphur Burner. 1. Electromelt: Low Power - Quick Heat System For Melting Of Sulphur. 2. Electric Heaters: Heavy Duty Ss-304/316L Integrated Casing Electric Heater Suitable For Quick Heat Generation Power: 10-15 Kw/Hr. (Electromelt) For Asb. 3. Control Panel: Microprocessor Based Auto Digital Heater Control & Monitoring In Auto/Manual Modes. Distribution & Safety: 1 No. 4. Temp. Sensors, Signal Cables Etc. 5. Internal Electric Wires/Cables From Panel To Heaters 180 Mtrs. Required Sensors. B. Service Portion - Installation & Commissioning Of Electromelt Auto-Direct Electric Melting Of Sulphur For Sulphur Burner In Boiling House. 1. Actual Erection Will Be Carried Out By Vendor Staff Under Vendor Supervision. And Boarding & Lodging Will Be Provided Vendor 2. Work Shall Be Carried Out As Per The Best Engineering Practices At Sugar Industries. 3. Supplies Shall Be Fully Guaranteed Against Any Manufacturing Defects / Poor Workmanship/ Inferior Design Or Quality Etc. For A Period Of 12 Months From The Date Of Commissioning Or 18 Months From The Date Of Delivery Whichever Is Earlier. During This Period, Seller Will Arrange To Repair / Replace Any Defective Part Free Of Cost Or Replace Complete Equipment, If Required. Vendor Shall Be Held Liable For Any Direct/Consequential Damage Arising From A Fault Or Malfunction Of Equipment To Vendor’S Own Risk. The Repair /Replacement Will Be Done At Factory Site (During Guarantee Period).

Tender Notice

44558693

Hpcl Biofuels Limited

Indian


Bihar

August 16, 2024

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Supply And Installation Of Electromelt Auto Direct Electric Melting Of Sulphur , A. Supply Portion - Electromelt System: Auto Direct Electric Melting Of Sulphur For Batch Type Sulphur Burner. 1. Electromelt: Low Power - Quick Heat System For Melting Of Sulphur. 2. Electric Heaters: Heavy Duty Ss-304/316L Integrated Casing Electric Heater Suitable For Quick Heat Generation Power: 10-15 Kw/Hr. (Electromelt) For Asb. 3. Control Panel: Microprocessor Based Auto Digital Heater Control & Monitoring In Auto/Manual Modes. Distribution & Safety: 1 No. 4. Temp. Sensors, Signal Cables Etc. 5. Internal Electric Wires/Cables From Panel To Heaters 180 Mtrs. Required Sensors. B. Service Portion - Installation & Commissioning Of Electromelt Auto-Direct Electric Melting Of Sulphur For Sulphur Burner In Boiling House. 1. Actual Erection Will Be Carried Out By Vendor Staff Under Vendor Supervision. And Boarding & Lodging Will Be Provided Vendor 2. Work Shall Be Carried Out As Per The Best Engineering Practices At Sugar Industries. 3. Supplies Shall Be Fully Guaranteed Against Any Manufacturing Defects / Poor Workmanship/ Inferior Design Or Quality Etc. For A Period Of 12 Months From The Date Of Commissioning Or 18 Months From The Date Of Delivery Whichever Is Earlier. During This Period, Seller Will Arrange To Repair / Replace Any Defective Part Free Of Cost Or Replace Complete Equipment, If Required. Vendor Shall Be Held Liable For Any Direct/Consequential Damage Arising From A Fault Or Malfunction Of Equipment To Vendor’S Own Risk. The Repair /Replacement Will Be Done At Factory Site (During Guarantee Period).