Supply Of Supply, Installation, Testing And Commissioning Of Damaged Parts Of Electric Furnace No.-20Supply, Installation, Testing And Commissioning Of Damaged Parts Of Electric Furnace No.-20,Supply, Installation, Testing And Commissioning Of Damaged Parts Of Electric Fu Rnace No.-20 (Plant No- 10547) At Hts Shop Which Consists Of The Folowing:- 1 Supply, Installa Tion, Testing And Commissioning Of Heating Element Made Of Kanthal I.E Heat Resistance Allo Y Strip Formed Like Sine Curves Whose Total Load Of 200 Kw Is Divided Into Two Groups Such That Load Per Phase Per Group Is 33.3 Kw Approx. The Heating Element Should Be Suitable For Maximum Temperature 1100 Degree Celsius And Working Temperature 1000 Degree Celsius Of The Furnace. The Required Size Of Heating Element Alloy Strip Is 20 Mm (W) X 2.5Mm (T)/25 Mm( W) X 2.0 Mm(T). [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Various Grade Of Ceramic Fib Re Blankets For Overall Insulation Of The Furnace Whose Total Insulation Thickness Is 250 Mm. The Insulation Details Are As Follows : Rtz- 64 Kg/Cum- 75 Mm, Rtz- 96 Kg/Cum- 75 Mm, Htz- 296 Kg/Cum- 50 Mm, Htz- 128 Kg/Cum-50 Mm. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Insulator In The Furnace [ W Arranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Specially Made Silliminite Stri P Hanger For Hanging The Heating Element [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Silliminite Blanket Holder [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Indicating Lamps Of Control Panel, Selector Switches, Voltmeter, Ammeter Etc A S Per Requirement Of The Control Panel. Make- Selec/Havells Or Similar. [ Warranty Period: 3 0 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of

Tender Notice

45600326

Eastern Railways

Indian


Bihar

October 14, 2024

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Supply Of Supply, Installation, Testing And Commissioning Of Damaged Parts Of Electric Furnace No.-20Supply, Installation, Testing And Commissioning Of Damaged Parts Of Electric Furnace No.-20,Supply, Installation, Testing And Commissioning Of Damaged Parts Of Electric Fu Rnace No.-20 (Plant No- 10547) At Hts Shop Which Consists Of The Folowing:- 1 Supply, Installa Tion, Testing And Commissioning Of Heating Element Made Of Kanthal I.E Heat Resistance Allo Y Strip Formed Like Sine Curves Whose Total Load Of 200 Kw Is Divided Into Two Groups Such That Load Per Phase Per Group Is 33.3 Kw Approx. The Heating Element Should Be Suitable For Maximum Temperature 1100 Degree Celsius And Working Temperature 1000 Degree Celsius Of The Furnace. The Required Size Of Heating Element Alloy Strip Is 20 Mm (W) X 2.5Mm (T)/25 Mm( W) X 2.0 Mm(T). [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Various Grade Of Ceramic Fib Re Blankets For Overall Insulation Of The Furnace Whose Total Insulation Thickness Is 250 Mm. The Insulation Details Are As Follows : Rtz- 64 Kg/Cum- 75 Mm, Rtz- 96 Kg/Cum- 75 Mm, Htz- 296 Kg/Cum- 50 Mm, Htz- 128 Kg/Cum-50 Mm. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Insulator In The Furnace [ W Arranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Specially Made Silliminite Stri P Hanger For Hanging The Heating Element [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Silliminite Blanket Holder [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Indicating Lamps Of Control Panel, Selector Switches, Voltmeter, Ammeter Etc A S Per Requirement Of The Control Panel. Make- Selec/Havells Or Similar. [ Warranty Period: 3 0 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of